WMBA 6620 Week 7 Plan Reconciliation Peer Replies Example

Practices in Project Management Walden University Free custom sample in 24 to 48h

This WMBA 6620 Week 7 plan reconciliation peer replies example quotes the two figures that disagree in each classmate's post before saying anything else. The first reply shows nine work packages totaling 19 weeks against a 14-week clinic relocation schedule, works the arithmetic down to 16 weeks with the one parallel pair drawn and argues that the schedule, fitted to a lease date, should move. The second finds a call center estimate's rows adding to $1,326,400 against a $1,240,000 summary and traces the $86,400 gap to a furniture row. Walden WMBA 6620 asks each reply to commit to which document moves, and both do, citing Kelley and Walker, Flyvbjerg and the PMBOK Guide on fast-tracking.

CourseWMBA 6620 Practices in Project Management
WeekWeek 7
Paper typePeer replies
LengthAbout 410 words, 3 pages
FormatDiscussion reply, APA 7 citations
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for WMBA 6620 Week 7

1

Week 7 Discussion: Reconciling Classmates' Plans

Nineteen Weeks of Packages in a Fourteen-Week Schedule, and a Cost Estimate $86,400 Short of Its Own Rows: Two Peer Replies That Quote the Disagreeing Figures, Do the Arithmetic and Say Which Document Moves

Response to Jordan: Schedule Against Work Packages

Jordan, your work breakdown lists nine packages for the clinic relocation with durations of 3, 2, 4, 1, 2, 3, 2, 1 and 1 weeks, and your schedule shows the move complete in 14 weeks. Those two figures disagree unless some packages run in parallel.

Here is the arithmetic. The nine durations total 19 weeks. Your network diagram shows only one parallel pair: furniture procurement, 4 weeks, alongside network cabling, 3 weeks. Running those together saves 3 weeks, bringing the chain to 16 weeks, not 14. The remaining 2 weeks would need another overlap, and none is drawn.

I think the schedule should move, not the breakdown. Your package durations came from the vendors and the facilities team, while the 14 weeks matches the date the old lease ends, which suggests the schedule was fitted to a deadline. If the lease date is fixed, the honest options are to find a second overlap, perhaps staff training during cabling, which the PMBOK Guide calls fast-tracking and which carries some risk of rework (Project Management Institute, 2021), or to negotiate a two-week lease extension now, while it is cheap. Kelley and Walker (1959) designed the critical path method to show exactly this: which chain sets the end date. Which of those would your sponsor accept?

What this page is doingThe reply quotes both figures first, so a reader can check the claim without opening the original post.
2

Response to Priya: Cost Estimate Against Its Own Rows

Priya, your estimate summary for the call center expansion shows a total of $1,240,000, but the rows in your table add up to $1,326,400. The difference is $86,400.

Working through the table, I think I found it: the furniture row shows 48 workstations at $1,800, which is $86,400, but the summary seems to have been calculated before that row was added. The other rows match their totals.

The summary should move, since the rows carry the sources and the furniture is real scope. That puts your estimate about 7 percent above the $1.24 million you were given, which is worth flagging now rather than at the first invoice. Flyvbjerg (2006) traced cost underestimates to optimism and the inside view planners take of their own projects, and this looks like an early figure that survived a change in scope. Would your sponsor rather fund the $86,400 or trim workstations?

What this page is doingThe reply does the arithmetic out loud and then commits to which figure should change.
3

References

Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5-15. https://doi.org/10.1177/875697280603700302

Kelley, J. E., & Walker, M. R. (1959). Critical-path planning and scheduling. In Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference (pp. 160-173). https://doi.org/10.1145/1460299.1460318

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.).

WMBA 6620 Week 7 instructions, in plain terms

The week's discussion asks students to check classmates' plans for internal consistency. Most sections are satisfied by two replies of roughly a page between them. Instructors expect each reply to quote the two figures that disagree before anything else, so a reader can check the claim. The middle should do the arithmetic openly, showing how the figures fail to reconcile. The close should propose which document moves and commit to it, since naming a discrepancy without recommending a fix leaves the classmate with nothing to act on. A question the classmate can answer usually ends the reply. Replies should also check their own arithmetic carefully, since an error in a correction undermines it. A brief note on the cause of the discrepancy, where it can be found, makes the fix easier for the classmate.

How the WMBA 6620 Week 7 example is put together

The first reply quotes nine package durations and a 14-week schedule, totals the durations at 19 weeks, credits the single parallel pair and finds 16 weeks. It argues the schedule was fitted to a lease date and should move, offers a second overlap or a lease extension and cites the PMBOK Guide on fast-tracking and Kelley and Walker on the critical path. The second reply quotes a summary total and the sum of the rows, identifies the missing furniture row, recommends correcting the summary and flags a 7 percent overrun, citing Flyvbjerg on optimism and the inside view. Each ends with a question for the sponsor's choice. Margin comments flag the quoted figures and the committed fix. Both replies stay within two hundred fifty words. The arithmetic is shown in full in each reply.

WMBA 6620 Week 7 rubric: what earns full marks

Graders reward replies that quote the disagreeing figures precisely and show the arithmetic. Identifying the likely cause of the discrepancy demonstrates careful reading. Committing to which document should change, with a reason, carries significant weight. Offering realistic options and asking a question the classmate can answer makes the reply useful. Citations that support the recommendation add credibility. Replies that propose a reconciled figure, not just a disagreement, show the classmate a way forward. Replies that link the discrepancy to a decision the sponsor must make show the most practical value.

WMBA 6620 Week 7 help: mistakes that cost marks

Read your classmate's documents side by side and look for two numbers that should agree. Quote both. Then show the calculation that reveals the gap. Ask which figure has better support, and recommend that the other one change. Offer one or two ways to resolve the difference. Students often lose marks by noting a discrepancy without numbers, by suggesting both documents might be wrong without choosing or by offering general praise. Another frequent gap is arithmetic errors in the reply itself. Check your sums twice. For a custom sample pair of reconciliation replies, send us your classmates' plans.

Get a WMBA 6620 Week 7 example written to your instructions

Both classmate submissions being reviewed are needed here, together with the Week 7 instructions and the participation rubric. Two replies with the arithmetic worked through come back in 24 to 48 hours, the first one free. Names come out before drafting and go back as placeholders once the replies return.

More WMBA 6620 papers and MBA samples

WMBA 6620 Week 7 questions, answered

Where can I find a free WMBA 6620 Week 7 sample paper?

Both plan reconciliation replies are published in full here.

What does the first reply find?

Nine packages total 19 weeks, or 16 with one overlap, against a 14-week schedule.

Which document should move in the first case?

The schedule, which appears fitted to a lease date.

What does the second reply find?

Estimate rows total $1,326,400 against a $1,240,000 summary, an $86,400 gap.

What caused the second gap?

A furniture row added after the summary was calculated.