| Course | WMBA 6620 Practices in Project Management |
|---|---|
| Week | Week 8 |
| Paper type | Quality plan |
| Length | About 930 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Master of Business Administration (MBA) |
| Updated | October 2026 |
Free sample paper for WMBA 6620 Week 8
Quality Plan for Line 2: One Row per Deliverable With an External Standard, a Numeric Threshold, a Checking Method, an Accountable Role and a Date, From Floor Coating to Bake Validation
Student Name
Walden University
WMBA 6620: Practices in Project Management
Instructor Name
Month Day, Year
Quality Plan for Line 2: One Row per Deliverable With an External Standard, a Numeric Threshold, a Checking Method, an Accountable Role and a Date, From Floor Coating to Bake Validation
Purpose and Approach
This plan sets out how the team adding Line 2 to Harvest Lane's composite Green Bay bakery will prove each deliverable meets its requirements. It covers quality during the project, through handover; the plant's quality system takes over after that. Each deliverable has a standard, preferably an external one, a measurable metric, a numeric threshold, a method of checking, a person accountable for the check and a time when the check happens. Juran and Godfrey (1999) describe quality planning as establishing goals and the processes to meet them before work begins, and the table below is that plan in practical form.
Quality Requirements by Deliverable
Table 1
Quality Requirements for Line 2
| Deliverable | Standard | Metric | Threshold | Checking method | Accountable | Timing | |
|---|---|---|---|---|---|---|
| Renovated north bay | Bakery sanitary design standard SD-04; city building code | Open items on sanitary walk-through; inspection result | Zero open items; inspection passed | Walk-through checklist; city inspection | Food safety manager | Week 20 | |
| Floor drains | Plumbing code; SD-04 section on drainage | Standing water after full washdown flow | None after 10 minutes | Flood test with hose at rated flow | Maintenance supervisor | Week 5 | |
| Electrical service | National Electrical Code (NFPA 70) | Inspection and test report | Passed, no deficiencies | City electrical inspection; contractor test report | Plant engineer | Week 14 | |
| Gas service and oven burners | Utility standards; NFPA 86 for ovens and furnaces | Leak test; combustion safety check | No leaks; all safety interlocks trip as designed | Utility test; oven vendor safety checklist | Plant engineer | Weeks 28 and 47 | |
| Installed equipment | Vendor installation specifications | Installation qualification checklist items passed | 100% | Joint checklist sign-off | Maintenance supervisor | Week 53 | |
| Machine guarding | OSHA general machine guarding rule, 29 C.F.R. § 1910.212 | Guarding and emergency stop deficiencies | Zero | Safety walk-down; emergency stop test at every station | Safety coordinator | Week 51 | |
| Commissioned line | Project scope statement | Output rate; scrap rate over 8 hours | At least 4,000 loaves an hour; scrap below 3% on two separate days | Production counter and scrap weighing | Production supervisor | Weeks 54 to 56 | |
| Bake step | Bakery food safety plan under 21 C.F.R. Part 117 | Internal loaf temperature | Every loaf in a twelve-loaf sample at or above the plan's set point, on three runs | Calibrated probe thermometer at five belt positions | Food safety manager | Weeks 56 to 58 | |
| Metal detection | Bakery food safety plan; customer audit standard | Rejection of standard test pieces | 30 of 30 rejections across three test pieces | Test-piece trials | Food safety manager | Week 57 | |
| Trained workforce | Training plan TP-L2 | Written test score; practical sign-off | 80% or higher; sign-off on every assigned station | Test and supervised practical | Production supervisor | Weeks 53 to 55 | |
| Handover package | Handover checklist HC-L2 | Open checklist items | Zero | Joint review with plant manager | Project manager | Week 61 | |
Weeks count from November 2, 2026, matching the project schedule; document numbers refer to composite bakery documents.
Why These Thresholds
Each threshold is a number or a binary outcome. The commissioning threshold of 4,000 loaves an hour, below the 4,500 target in the charter, reflects normal startup; the charter's 4,500 target applies to the four weeks ending March 31, 2028, after handover. The scrap threshold of 3 percent comes from Line 1's first month after its 2019 refurbishment. The bake step threshold is set by the bakery's food safety plan, which the preventive controls rule requires the bakery to validate (21 C.F.R. Part 117), and the twelve-loaf, five-position sample is designed to catch cold spots at the edges of the oven belt, where underbaking is most likely. The guarding check uses the federal machine guarding rule (29 C.F.R. § 1910.212), which leaves no room for partial compliance, so its threshold is zero deficiencies.
Quality Assurance During the Project
Quality control, the checks in the table, confirms results. Quality assurance aims to prevent defects in the first place. Three assurance steps are built into the project. First, the factory acceptance test at the oven vendor, in week 38, checks the oven's temperature uniformity before it ships, when fixes are cheaper. Second, the food safety manager reviews the north bay drawings before construction starts, so sanitary design problems are caught on paper. Third, the installers and the bakery's maintenance staff hold a short daily review during installation to catch deviations from the vendor's specifications as they happen rather than at the qualification stage.
Nonconformance Handling
When a check fails, the accountable person records the failure in the project's nonconformance log within one working day, with the measured value, the threshold and the immediate action. The project manager assigns an owner and a date for correction. A correction that changes scope, schedule or cost goes through change control. A failed food safety check stops production trials until the food safety manager approves a retest; no product from a failed trial may be sold. Repeated failures of the same check trigger a root cause review with the vendor.
Responsibilities
Ownership of this plan sits with the project manager, who reports quality results in each status report. The food safety manager has authority to stop trials on food safety grounds without the project manager's approval. Vendors are contractually responsible for meeting their installation specifications, and final payments of 10 percent are held until installation qualification passes. The PMBOK Guide (Project Management Institute, 2021) treats quality as built into deliverables through planning, not inspected in at the end, and the holdback gives vendors a reason to share that view.
References
Current good manufacturing practice, hazard analysis, and risk-based preventive controls for human food, 21 C.F.R. Part 117 (2024).
General requirements for all machines, 29 C.F.R. § 1910.212 (2024).
Juran, J. M., & Godfrey, A. B. (1999). Juran's quality handbook (5th ed.). McGraw-Hill.
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.).
What the WMBA 6620 Week 8 instructions ask for
The quality plan assignment asks students to define how a project will confirm that each deliverable meets its requirements. Instructors expect eight hundred to twelve hundred words built around a table with one row per deliverable. Columns hold the standard, the metric, the threshold, the checking method, the accountable person and the timing. Standards should point to something external where one exists, such as a regulation, a vendor specification or a numbered internal policy. Thresholds should be numeric. Sections on quality assurance, nonconformance handling and responsibilities usually follow the table. Thresholds for commissioning and startup may differ from long-term targets, and the plan should explain any difference. Vendor obligations, such as holdbacks tied to qualification, strengthen enforcement.
How this WMBA 6620 Week 8 example is built
The plan explains its scope and cites Juran and De Feo on quality planning. A table gives eleven rows covering the bay, drains, electrical and gas service, installed equipment, guarding, commissioning, bake validation, metal detection, training and handover, each with a standard, metric, threshold, method, owner and week. A section explains the thresholds, including the commissioning rate, the scrap limit, the bake sample design under the preventive controls rule and the zero-deficiency guarding standard. An assurance section names three preventive steps. A nonconformance section sets logging and stop rules. A responsibilities section describes vendor holdbacks and cites the PMBOK Guide. Margin comments flag the approach and the numeric thresholds. Weeks in the table match the project schedule so checks can be planned alongside the work.
Reading the WMBA 6620 Week 8 rubric
Graders reward a table that covers every deliverable with an external standard, numeric threshold, method, owner and timing. Explaining why thresholds were set at their levels shows judgment. Distinguishing quality assurance from quality control, with concrete preventive steps, demonstrates understanding. A clear procedure for handling failures adds practical value. Assigning authority, such as the food safety manager's power to stop trials, shows governance. Naming the food safety rule or standard each check satisfies, with the inspection point where it applies, is what makes the plan auditable. Plans that explain why each threshold was chosen, rather than only stating it, show the strongest understanding.
Common WMBA 6620 Week 8 mistakes, and how to avoid them
List every deliverable from your scope statement. For each, find the standard it must meet, preferably an external one, and decide how you will measure it. Set a number that defines a pass. Name who will check it and when. Then add the steps you will take to prevent defects, not just find them. Students often lose marks by writing thresholds such as acceptable quality, by citing no standards or by omitting what happens when a check fails. Another frequent gap is assigning checks to the team in general. Name a role. If you need a custom sample quality plan for your project, send us its deliverables and standards.
Get a WMBA 6620 Week 8 example written to your instructions
The quality prompt, the rubric, and the scope statement whose acceptance criteria these metrics point at all feed this one. A plan with its threshold table, cost of quality and rework path arrives in 24 to 48 hours, the first one free. Industry standards get cited wherever a section requires them.
More WMBA 6620 papers and MBA samples
- WMBA 6620 Week 1: Missed Project Target Post
- WMBA 6620 Week 2: Bakery Line Project Charter
- WMBA 6620 Week 3: Project Scope Statement
- WMBA 6620 Week 4: Work Breakdown Structure
- WMBA 6620 Week 5: Critical Path Schedule Build
- WMBA 6620 Week 6: Bottom-Up Project Cost Estimate
- WMBA 6620 Week 7: Plan Reconciliation Peer Replies
- WMBA 6620 Week 9: Change Control Procedure
- WMBA 6620 Week 10: Earned Value Status Report
- WMBA 6620 Week 11: Project Closeout Report
- WMBA 6623 Week 8: Risk Contingency Reserve Brief
- WMBA 6615 Week 8: New Engineer Onboarding Design
- WMBA 6627 Week 8: Stakeholder Influence Strategy
- WMBA 6608 Week 8: Hospital Turnaround Recommendation
WMBA 6620 Week 8 questions, answered
Where can I find a free WMBA 6620 Week 8 sample paper?
The project quality plan for a bakery production line is available on this page.
What does each row of the table contain?
A standard, a metric, a threshold, a checking method, an accountable role and timing.
Which external standards are used?
The National Electrical Code, NFPA 86, OSHA's machine guarding rule and the preventive controls rule for food.
What is the bake step threshold?
Every loaf in a twelve-loaf sample at or above the food safety plan's set point, on three runs.
What happens if a food safety check fails?
Production trials stop until the food safety manager approves a retest.