WMBA 6040 Week 8 Final Plan and Sustain Reflection Example

Improving Business Performance Walden University Free custom sample in 24 to 48h

This WMBA 6040 Week 8 final plan and sustain reflection example revises a composite optical lab's improvement plan after critique: the yield gain becomes a hypothesis tested by a two-week trial on one coating formulation, calls to practices with late frames are added and ownership is split clearly between the production manager and the coating supervisor. The reflection then argues how a gain measured once stays measured. Bateman's research on sustaining process improvement and Repenning and Sterman's account of why fixed problems become invisible explain the risk. Walden WMBA 6040 asks who holds the number after the analyst leaves, and the paper assigns every measure to a continuing manager with an automatic Monday report. MBA students also see the oldest tray at coating chosen as the early signal, with a two-morning rule.

CourseWMBA 6040 Improving Business Performance
WeekWeek 8
Paper typeFinal plan and reflection
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for WMBA 6040 Week 8

1

The Revised Plan and Who Holds the Number Afterward: Final Improvement Plan for Coated Lens Turnaround at a Wholesale Optical Lab, With a Control Plan, an Owner for Each Measure and the Early Signal of Sliding Back

Student Name

Walden University

WMBA 6040: Improving Business Performance

Instructor Name

Month Day, Year

What this page is doingThe title pairs the revised plan with the question the reflection must answer, how a gain measured once stays measured.
2

The Revised Plan and Who Holds the Number Afterward: Final Improvement Plan for Coated Lens Turnaround at a Wholesale Optical Lab, With a Control Plan, an Owner for Each Measure and the Early Signal of Sliding Back

Revisions in Response to Critique

Reviewers of the Week 7 plan for Clearwater, the made-up optical lab studied all term, raised three points, and the plan now answers each.

First, reviewers judged the link between waiting and coating defects too uncertain to promise a yield gain. The revised plan promises turnaround, the outcome the queue cap and the four-run schedule act on directly, and treats yield as a result to be tested. A two-week trial will run the four-run schedule on one formulation first, and the defect rates of that formulation and the others will be compared before the schedule is extended.

Second, reviewers asked for frame holds to be included, since a job waiting three days for a frame is late through no fault of production. The revised plan adds one low-cost step: customer service calls every practice whose frame is more than two days late, which the frame hold measure already triggers. Incomplete orders remain in a second phase.

Third, reviewers found ownership unclear between the coating supervisor and the production manager. The revised plan gives the production manager ownership of turnaround and the queue cap, and the coating supervisor ownership of the run schedule and the oldest-tray measure, with a fifteen-minute review of both every Monday.

What this page is doingEach critique is answered in a sentence before the detail, so the reviewer can confirm the changes quickly.
3

The Revised Plan in Brief

Table 1

Revised Changes, Owners and First Read Dates

ChangeOwnerFirst read |
Four coating runs a day, trialed on one formulation for two weeks, then extendedCoating supervisorWeeks 2 and 6 |
Queue cap of 400 trays at coatingProduction managerWeek 4 |
Daily calibration check on edger 3Edging leadWeek 4 |
Calls to practices with frames more than two days lateCustomer service managerWeek 4 |

All figures and dates are for a composite lab; week numbers count from the start of the changes.

Expected results are unchanged from the Week 7 plan for turnaround and trays in process. The yield target is now stated as a hypothesis to be tested in the two-week trial.

Reflection: Keeping the Gain After the Project Ends

The harder question is what happens after the project. Improvements in operations often fade. Bateman (2005), studying process improvement workshops in manufacturing companies, found that many gains were not sustained and that sustainability depended on factors such as follow-up actions being completed and a process for maintaining the change after the improvement team disbanded. Repenning and Sterman (2001) explained why: when an improvement works, the problems it prevents become invisible, and managers under pressure shift attention and resources back to fighting visible fires, so the capabilities that produced the improvement erode.

At Clearwater, the risk is specific. Running coating four times a day adds roughly an hour and a half of labor daily. In a busy week, with the coating crew short a person, the easiest saving will be to go back to two runs. The queue cap will feel like idle capacity in surfacing on days with few uncoated jobs, and someone will lift it to keep surfacing busy. Neither decision will look like abandoning the plan. Each will look like a reasonable response to that week.

What this page is doingThe risk of sliding back is described in this lab's terms, not as a general warning.
4

Who Holds the Number

A gain measured once stays measured only if someone owns the measure after the project. The plan assigns each of the five measures to a manager whose job continues regardless of the project: turnaround to the production manager, oldest tray to the coating supervisor, yield to the quality lead, and frame holds and incomplete orders to the customer service manager. The measures are calculated automatically from tray scans and posted each Monday on a board in the production office and in the weekly operations report, so they do not depend on the analyst who built them.

The Early Signal

Turnaround is a lagging measure; by the time it worsens, the cause is a week old. The early signal of sliding back is the oldest tray at coating. If the schedule quietly returns to two runs, the oldest tray will rise above 36 hours within two or three days, well before turnaround moves. The control plan therefore sets one rule: if the oldest tray exceeds 36 hours on two consecutive mornings, the production manager reviews the coating schedule that day. A second signal is the Thursday queue count; a queue above 500 trays means the cap has been lifted or ignored. Goldratt and Cox (2004) also warned that relieving a constraint can move it to another step, so the Monday review should glance at the edging queue too; if coating improves and edging begins to back up, the constraint has moved and the plan's next phase should follow it.

What this page is doingChoosing a leading indicator and a two-morning rule gives the control plan a trigger that acts before turnaround slips.
5

Making the Change Part of the Standard

The four-run schedule and the queue cap will be written into the lab's standard operating procedures for coating and surfacing, with the reason for each, so that a new supervisor inherits the rule and its purpose. Without the purpose, the rule looks like an arbitrary inefficiency and will be the first thing a new manager removes.

What I Would Watch Personally

If I were the manager responsible, I would watch for my own impatience. The yield effect will take weeks to read, and I would be tempted to declare success on turnaround alone and move to the next project. Repenning and Sterman's argument suggests that the moment an improvement seems finished is the moment it begins to erode, which is why the Monday review continues after the project closes.

Training New Supervisors

One more safeguard concerns people who arrive after the project. The lab hires or promotes two or three supervisors a year. Each new supervisor in surfacing, coating or edging will be walked through the coated-lens map, the five measures and the reasons for the four-run schedule and the queue cap during their first week. A one-page summary of the project, written for someone who was not there, will be kept with the procedures. This matters because the people who remember why the changes were made will not be there forever, and a rule whose reason is forgotten tends to be dropped the first time it is inconvenient.

References

Bateman, N. (2005). Sustainability: The elusive element of process improvement. International Journal of Operations & Production Management, 25(3), 261-276. https://doi.org/10.1108/01443570510581862

Goldratt, E. M., & Cox, J. (2004). The goal: A process of ongoing improvement (3rd rev. ed.). North River Press.

Repenning, N. P., & Sterman, J. D. (2001). Nobody ever gets credit for fixing problems that never happened: Creating and sustaining process improvement. California Management Review, 43(4), 64-88. https://doi.org/10.2307/41166101

Reading the WMBA 6040 Week 8 instructions

Final assignments in a business performance course usually pair the revised improvement plan with a reflection on what happens after the project ends. Prompts often ask how gains will be sustained, who will own the measures after the analyst moves on and what early signal would show the operation sliding back. Instructors expect the revision to answer critique specifically and the reflection to be concrete about the operation, not a general statement about continuous improvement. The final file commonly reaches five or six pages. The reflection is graded work, so students should give it real space and ground it in research on sustaining improvement. Writing the change into standard procedures, with its reason, is a practical step many strong papers include.

How this WMBA 6040 Week 8 example is built

The paper opens with three critiques and answers each: yield becomes a tested hypothesis, frame-hold calls are added and ownership is clarified with a Monday review. A table lists the revised changes with owners and read dates. The reflection explains why gains fade, citing Bateman on sustainability and Repenning and Sterman on invisible prevented problems, and describes the specific risks: returning to two runs in a short-staffed week and lifting the cap when surfacing looks idle. A section assigns each measure to a continuing manager with automatic reporting. A section names the oldest tray as the early signal, sets a rule and adds the Thursday queue count, with Goldratt and Cox's warning that constraints can move. Sections cover writing the change into procedures and the writer's own impatience. Annotations sit beside the revisions, the reflection and the early signal.

WMBA 6040 Week 8 rubric: what earns full marks

Graders reward revisions that answer each critique directly and visibly. Treating an uncertain benefit as a hypothesis to test shows judgment. The reflection carries significant weight: describing specific ways this operation could slide back, assigning measures to people whose roles continue and choosing a leading indicator with a clear rule distinguish strong papers. Grounding the argument in research on sustaining improvement adds depth. Writing changes into standard procedures with their reasons shows practical understanding of how organizations forget. Naming one's own likely failure mode demonstrates maturity. Instructors also expect the final plan to be internally consistent and readable on its own. Correct figures, named owners and well-formed APA references finish the scoring.

WMBA 6040 Week 8 help: mistakes that cost marks

List the critiques you received and answer each in one sentence before revising the detail. If a claimed benefit is uncertain, turn it into something you will test. For the reflection, imagine the operation six months after the project: what would make someone quietly undo each change? Assign every measure to a person whose job continues, and make the reporting automatic. Choose an early signal that moves before your main outcome does, and write a rule for what happens when it moves. A reflection that recounts the course instead of addressing how the gain will last loses marks, as does making the analyst the owner of a measure. Write the reason for each change into the procedure. If you need a custom sample final plan and reflection from your draft, send it with the critique.

Get a WMBA 6040 Week 8 example written to your instructions

Send the final prompt with its rubric and say whether the reflection is graded separately, since that changes how much of the sample belongs to it. A matching submission, revised plan plus reflection, returns in 24-48 hours, and a first request costs nothing at all.

More WMBA 6040 papers and MBA samples

WMBA 6040 Week 8 questions, answered

Where can I find a free WMBA 6040 Week 8 sample paper?

The revised improvement plan and its reflection on sustaining the gain are published in full here.

How did the plan change after critique?

Yield became a hypothesis to test, frame-hold calls were added and ownership was clarified.

Why do improvements fade?

When an improvement works, prevented problems become invisible and attention shifts back to visible ones.

Who holds the measures afterward?

Continuing managers in production, coating, quality and customer service, with automatic Monday reports.

What is the early signal of sliding back?

The oldest tray at coating rising above 36 hours on two consecutive mornings.