| Course | WMBA 6030 Managing Business Information Systems |
|---|---|
| Week | Week 8 |
| Paper type | Final proposal and reflection |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Master of Business Administration (MBA) |
| Updated | October 2026 |
Free sample paper for WMBA 6030 Week 8
The Platform Decision, Finished: Staff Time and a Contingency Added to the Cost Table, a Fallback if the Migration Test Fails, and a Reflection on Three Technology Decisions the Writer Made as Purchases
Student Name
Walden University
WMBA 6030: Managing Business Information Systems
Instructor Name
Month Day, Year
The Platform Decision, Finished: Staff Time and a Contingency Added to the Cost Table, a Fallback if the Migration Test Fails, and a Reflection on Three Technology Decisions the Writer Made as Purchases
What Feedback Asked For
The Week 7 proposal asked the owner of Harwood, the made-up event rental company behind this term's work, to approve a cloud rental platform with tablet check-in before the season. Feedback raised three points. The cost table counted only what Harwood would pay vendors and left out the staff time the switch would consume. The proposal had no plan for the case in which the test migration failed. And two measures lacked a stated way of collecting the baseline. This final version answers each.
Revised Cost
Table 1
Year-One Cost Including Staff Time and Contingency
| Item | Cost | |
|---|---|
| Platform subscriptions, 45 users | $86,000 | |
| Vendor implementation and data migration | $55,000 | |
| Staff time: migration checks, about 300 hours | $13,500 | |
| Staff time: training, about 40 hours per account manager and 6 hours per crew member | $24,500 | |
| Job codes for crew time | $3,500 | |
| Contingency, 10 percent of vendor costs | $14,100 | |
| Total year one | $196,600 | |
Hours of staff time are valued at wages plus benefits; every figure is illustrative.
The total rises from about $141,000 to about $196,600. The increase is mostly staff time that would have been spent anyway, but counting it shows the owner what the project will take from the people running the business in its quietest months. The contingency covers the most likely overrun, additional migration work if the old system's data prove messier than the test suggests.
If the Migration Test Fails
The proposal requires a test migration of all confirmed bookings that matches the old system exactly before cutover. If the test fails by mid-March and cannot be fixed within two weeks, the company will not cut over. It will keep the old system for one more season, replace the aging server at about $12,000 so that it survives the summer, and restart the migration the following January with the vendor's subscription paused. The cost of this fallback, roughly $12,000 plus a year's delay in the benefits, is much smaller than the cost of starting a season with unreliable bookings. Stating this in advance removes the pressure to cut over on a deadline when the data are not ready.
Measures, With Baselines Collected
Two measures now have defined baselines. Average time to quote a large event will be measured from the date of the first inquiry to the date the quote is sent, taken from account managers' email records for the forty large events quoted between August and October. Double-bookings and short-shipped orders will be counted from crew leads' incident reports for the same season, which the company already keeps on paper and will compile once. The other measures, bookings migrated, damage recorded at check-in and invoices re-keyed, are counted directly by the systems involved.
Unchanged Elements
The recommendation, timing, owner and risks are unchanged. The owner still needs to approve by year end, the switch still runs from January to late March, the director of operations is the single owner and the migration of confirmed bookings remains the critical risk.
Reflection: Technology as a Commitment, Not a Purchase
This course changed how I see three decisions I made or supported at Harwood before it began.
The first was the website, built in 2017. I helped choose the agency and approved the launch, and I thought of the site as a finished project. No one owned it after launch, and it was never changed as the business changed. By the time the company's strategy moved toward corporate events, the site was still selling folding chairs. I now see that a website is a commitment to keep serving the customers the business wants, and that a commitment without an owner decays. Gerow et al. (2014) found that alignment between technology and business strategy was positively related to performance across the studies they pooled; our website shows how quietly that alignment can be lost when nobody is responsible for keeping it.
The second was the server. For three years I treated its replacement as a technical matter for our part-time IT contractor and approved the smallest repair each time. I did not ask what would happen to the business if it failed in June. Writing the Week 5 brief made me see that I had been deciding a business risk by default, one repair at a time.
The third was the crew tablets we bought in 2021. We bought them so crews could see delivery details, but we never changed the paper check-in process, so the tablets became devices for email and maps. The money was spent and the process was the same. Davenport (2000) argued that enterprise systems deliver value only when companies change how they work around them, and our tablets are a small example of the opposite.
The common thread is that I treated each of these as a purchase with a delivery date. Markus et al. (2000) found that success at one point in an enterprise system's life was only loosely related to success at another, which matches what I saw: each of my three decisions looked successful the week it was made. The platform decision in this proposal is written differently, with an owner, measures at three points in time and a fallback, because I now think the decision is not the signing but the years after it.
What the Owner Should Expect in the First Year
The revised proposal also sets expectations for the owner, since the first year will feel worse before it feels better. January through March will take time from the operations team that would otherwise go to equipment repair and supplier negotiations. The first month after cutover will bring slower check-ins and some frustration among crews and account managers. The measurable benefits, faster quotes and condition data tied to orders, will appear during the season, and the most valuable one, knowing which event types make money, will not be available until the data analysis described in Week 3 is completed in the fall. An owner who expects the gains to arrive at cutover will judge the project too early, which is exactly the error the three-point measurement plan is designed to prevent.
References
Davenport, T. H. (2000). Mission critical: Realizing the promise of enterprise systems. Harvard Business School Press.
Gerow, J. E., Grover, V., Thatcher, J., & Roth, P. L. (2014). Looking toward the future of IT-business strategic alignment through the past: A meta-analysis. MIS Quarterly, 38(4), 1159-1186. https://doi.org/10.25300/MISQ/2014/38.4.10
Markus, M. L., Axline, S., Petrie, D., & Tanis, C. (2000). Learning from adopters' experiences with ERP: Problems encountered and success achieved. Journal of Information Technology, 15(4), 245-265. https://doi.org/10.1080/02683960010008944
WMBA 6030 Week 8 instructions, in plain terms
Final assignments in a business information systems course usually ask students to return their recommendation finished, with instructor feedback answered and cost tables tightened, and to reflect on managing technology as an ongoing business commitment. Prompts often ask students to name decisions they have already made at work and what they now see differently. Instructors expect revisions tied clearly to feedback and reflection grounded in specific past decisions, not general lessons. Expect the final submission to reach five or six pages. The reflection is often weighted heavily, so students should give it real space. Explaining each revision in a sentence or two lets the instructor see the response quickly, and a fallback plan for the riskiest step shows the recommendation was tested against failure.
How this WMBA 6030 Week 8 example is built
An opening section lists three feedback points. A revised cost table adds staff time for migration checks and training, job codes and a contingency, with a paragraph on why counting staff time matters. A fallback section sets a mid-March test deadline and describes keeping the old system for a season, with its cost. A measures section names data sources for two baselines. A short section confirms what is unchanged. The reflection examines three past decisions: a website treated as a finished project, with Gerow and colleagues on alignment; a server replaced one repair at a time; and tablets bought without changing check-in, with Davenport on changing work around systems. It closes by linking all three to Markus and colleagues' finding about early and later success. Side notes flag the cost revision, the fallback and the reflection.
WMBA 6030 Week 8 rubric: what earns full marks
Graders reward revisions that answer each feedback point visibly and specifically. A complete cost picture, including staff time and contingency, shows financial maturity. A fallback set in advance for the riskiest step demonstrates judgment under uncertainty. Baselines with named sources make the measures credible. The reflection carries significant weight: naming specific past decisions, explaining what went wrong and connecting them to course readings distinguishes strong papers from general reflections on learning. Showing how the reflection shaped the final recommendation ties the two halves together. Instructors also expect the final proposal to stand alone. Consistent figures, professional formatting and correctly cited APA sources complete the expectations for the course.
WMBA 6030 Week 8 help from the desk
List each feedback point and the change you made for it. Recheck every figure after revising, since added costs change totals. Write down, before you start, the fallback for the step most likely to fail. For the reflection, choose two or three decisions you made or supported at work and ask what each looks like now: who owned it afterward, what it was supposed to change and whether it did. Students often lose marks by reflecting on the course instead of on their own decisions, or by revising cosmetic details while leaving the main comments unanswered. Connect each past decision to a reading. Show how the reflection changed the plan. Share your draft and the comments on it if you want a custom sample of the finished proposal and reflection.
Get a WMBA 6030 Week 8 example written to your instructions
Two Week 8 items go together: the final brief instructions plus whatever the reflection asks for, with your rubric and any draft comments. Matched samples return in 24-48h and the first request costs nothing. Note whether a revision summary has to be attached. The reflection stands as a model only, since the decisions you have watched go wrong are not on file here.
More WMBA 6030 papers and MBA samples
- WMBA 6030 Week 1: Systems and Strategy Post
- WMBA 6030 Week 2: Enterprise Platform Evaluation
- WMBA 6030 Week 3: Data Investment Memo
- WMBA 6030 Week 4: Online Channel Unit Economics
- WMBA 6030 Week 5: Security Board Brief
- WMBA 6030 Week 6: RFID Hype Evaluation
- WMBA 6030 Week 7: Rental Platform Proposal
- WMBA 6040 Week 8: Final Plan and Sustain Reflection
- WMBA 6020 Week 8: Final Proposal and Reflection
- WMBA 6010 Week 8: Final Collaboration Plan
- WMBA 6000 Week 8: Scaling Leadership Proposal
WMBA 6030 Week 8 questions, answered
Where can I find a free WMBA 6030 Week 8 sample paper?
The finished platform proposal and its reflection appear in full on this page.
How did the cost change?
Adding staff time, job codes and a 10 percent contingency raised year one to about $196,600.
What happens if the migration test fails?
The company keeps the old system one more season, replaces the server and restarts the switch the next January.
What three past decisions does the writer reflect on?
A website with no owner, a server repaired one patch at a time and tablets bought without changing check-in.
What is the common thread?
Each was treated as a purchase with a delivery date rather than a commitment with an owner.