WMBA 6010 Week 8 Final Collaboration Plan Example

Managing People and Promoting Collaboration Walden University Free custom sample in 24 to 48h

This WMBA 6010 Week 8 final collaboration plan example revises the Week 7 draft for a composite localization agency's seven project managers and their colleagues in Lisbon and Manila. Feedback said the draft was too long to carry out, carried no costs and left out the two site leads. The final version keeps four practices, a monthly project review chaired by rotation, a quarterly development assignment, written feedback on large projects and a quarterly three-site review with the Lisbon and Manila leads, and prices them at about 25 hours a month. Walden WMBA 6010 asks for fixed measures, and a table sets baselines and twelve-month targets for each. MBA students also see a reflection post that names three mistakes in the draft and explains why the final plan relies on structures rather than willpower.

CourseWMBA 6010 Managing People and Promoting Collaboration
WeekWeek 8
Paper typeFinal plan and reflection
LengthAbout 1,230 words, 7 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for WMBA 6010 Week 8

1

Four Practices Instead of Seven, Each Priced in Hours: The Final Collaboration Plan for a Three-Site Localization Team, With Fixed Measures and a Reflection on What the Draft Got Wrong

Student Name

Walden University

WMBA 6010: Managing People and Promoting Collaboration

Instructor Name

Month Day, Year

What this page is doingThe title reports the main revision, fewer practices with costs attached, so a reader comparing it with the draft sees the change at once.
2

Four Practices Instead of Seven, Each Priced in Hours: The Final Collaboration Plan for a Three-Site Localization Team, With Fixed Measures and a Reflection on What the Draft Got Wrong

Summary

This is the final collaboration plan for my seven project managers at Larkspur, the course's invented localization firm, and for the Lisbon translators and Manila typesetters who work alongside them. The Week 7 draft proposed seven separate practices. Feedback on the draft said it was too long to carry out, carried no costs and left out the two site leads whose cooperation it needed. The final plan keeps four practices, prices each in hours of people's time and my attention, brings the Lisbon and Manila leads into one of them and fixes four measures with baselines and targets. Its total cost is about 25 hours a month across the team, roughly one percent of the team's working time.

What this page is doingThe summary leads with what changed since the draft, because the reader has already seen the earlier version.
3

What Was Cut and Why

Three practices from the draft are gone. Cross-site feedback twice a year is folded into the quarterly three-site review described below, which gathers the same views with less paperwork. The team's self-chosen annual goal is dropped for now; the project managers said in discussion that they would rather choose it after the first quarter of monthly reviews, once they have worked together on something. Individual written notes after every project are limited to projects above 40,000 words, because at the team's current volume notes on every project would have taken eight hours of my time each month. Pairing for the two new hires continues, but as part of standard onboarding owned by the experienced project managers, so it is no longer counted as a practice of this plan.

The Four Practices

Table 1

Practices, Owners and Monthly Cost

PracticeOwnerWho takes partMonthly time cost |
Monthly project review, chaired by rotationRotating project managerSeven project managers; team lead attends12 hours (7 people x 1.5 hours, plus 1.5 hours preparation) |
Development assignment each quarterTeam lead, with account directorOne project manager per monthAbout 6 hours of extra project time |
Written feedback on large projectsTeam leadAbout ten projects a month4 hours |
Quarterly three-site reviewTeam lead and both site leadsThree leads, two project managers by rotation3 hours, averaged per month |

Hours are estimates from the past quarter's project volume.

The monthly review is the center of the plan, because it gives seven people who share a manager one piece of shared work, the condition Hackman (2002) treated as the foundation of any real team. Each month a different project manager chooses one completed project, presents what went well and badly, and the group settles on a single shared change in practice. I attend, ask at most one question and do not chair.

Each month one project manager receives a stretch project, chosen together and routed through the scheduler's complex-project setting. The account director has agreed to honor the flag for one project a month on a trial basis for two quarters. The cost is extra hours on the stretch project, since a less experienced manager on a complex project takes longer, which I estimate at six hours a month.

Written feedback follows the rule from the draft: two things that worked and one to change, with examples, sent within a week of the project closing.

The quarterly three-site review is new. The Lisbon lead linguist, the Manila layout lead and I meet for ninety minutes each quarter, with two project managers by rotation, to go over the three-site working arrangement from Week 6: the decision table, the handoff times and the query log. Each lead brings the hours their site lost to waiting. Cummings et al. (2009) reported that coordination delays in globally spread projects rise as more time zones separate the people involved, which means the arrangement needs regular tuning rather than a single design.

Costs in Attention

Hours are not the only cost. Each practice also asks for attention from someone who is already busy. The monthly review is the most demanding, because the chairing project manager prepares it in the same week as client deadlines. To protect it, the review is scheduled in the second week of each month, when deliveries are lightest, and the chair's project load that week is reduced by one small project. My own attention is the other scarce resource: the plan asks me to write ten feedback notes, attend the review in silence and hold one quarterly meeting. That is less than the draft asked and, I think, about what I can sustain.

What this page is doingCounting attention as well as hours shows the plan was tested against the people who must carry it out.
4

Fixed Measures

Table 2

Measures, Baselines and Twelve-Month Targets

MeasureBaselineTarget |
Working days lost to cross-site waiting per ten-week projectAbout 4 (farm equipment manual team)2 or fewer |
Escalations resolved without the team lead taking over5 of 9 in the past six months8 of 10 |
Process suggestions from project managers per quarter16 across the team |
Team's agreement that the lead lets them finish describing problems (1 to 5)Not yet measuredMeasured in month 1; target a rise of 1 point |

Baselines come from project records and my notes; the case is composite.

What this page is doingBaselines and targets are set before the plan starts, so success cannot be defined after the results are in.
5

The measures are fixed now so that the results cannot be chosen after the fact. Each is linked to a problem identified earlier in the term: cross-site delays from Week 6, my habit of taking work back from Week 1, lost discretionary effort from Week 2 and my habit of jumping to fixes from Week 1.

Risks

The plan faces two main threats. One is a busy quarter in which the monthly review is canceled once and never restarted; the rule is that a canceled review is rescheduled within two weeks, never skipped. The second is that I return to old habits under pressure. The plan's response is structural rather than a matter of willpower: I do not chair the review, and escalation rules agreed in advance decide when I may step in. Deci et al. (2017) describe autonomy support as something managers provide through structures as well as attitudes, and the plan relies on the structures.

Reflection Post

Looking back at my Week 7 draft, I think I made three mistakes. First, I treated every weakness I found as needing its own practice, and the result was a plan no busy team could carry out. I now think a plan that people will actually follow is better than a complete one. Second, I left out cost entirely, which made the draft easy to approve and impossible to fund. Pricing each practice in hours showed me that individual notes on every project were costing me more than the rest of the plan combined. Third, I wrote a collaboration plan for three sites and included only one of them. The Lisbon and Manila leads were described in the draft but had no role in it, which repeated, in a small way, the headquarters habit the Week 6 arrangement was meant to correct.

The draft's reflection also relied on my changing my own habits by trying harder. I no longer believe that will work under pressure. The final plan builds rules around my habits instead, and I suspect that is the most useful thing I learned this term.

Did anyone else find that their final plan got shorter rather than longer?

What this page is doingThe reflection names specific errors in the draft and explains what caused them, which is what the final post is graded on.
6

References

Cummings, J. N., Espinosa, J. A., & Pickering, C. K. (2009). Crossing spatial and temporal boundaries in globally distributed projects: A relational model of coordination delay. Information Systems Research, 20(3), 420-439. https://doi.org/10.1287/isre.1090.0239

Deci, E. L., Olafsen, A. H., & Ryan, R. M. (2017). Self-determination theory in work organizations: The state of a science. Annual Review of Organizational Psychology and Organizational Behavior, 4, 19-43. https://doi.org/10.1146/annurev-orgpsych-032516-113108

Hackman, J. R. (2002). Leading teams: Setting the stage for great performances. Harvard Business School Press.

What the WMBA 6010 Week 8 instructions ask for

Final assignments in a people management course usually ask students to revise their draft plan into a finished version and reflect on what changed. Prompts commonly ask for the practices the plan will use, their costs in time and resources, fixed measures and an account of how feedback shaped the revision. A reflection, often in the form of a post, asks what the student now thinks was wrong in the earlier version. Instructors expect visible revision rather than light editing, and costs that make the plan's demands clear. Final plans usually run five to six pages. The reflection should be honest and specific; naming one real mistake and its cause is worth more than a general statement that the student learned a great deal this term.

How this WMBA 6010 Week 8 example is built

A summary states what changed since the draft and the plan's total monthly cost. A section explains what was cut: cross-site feedback folded into a quarterly review, the annual goal postponed and individual notes limited to large projects. A table lists four practices with owners, participants and monthly hours. Paragraphs describe each practice, citing Hackman on real teams and Cummings and colleagues on coordination delay. A section on costs in attention explains how the review is protected during busy weeks. A measures table fixes baselines and targets tied to problems from earlier weeks. A risks section relies on structures, citing Deci and colleagues on autonomy support. The reflection post names three mistakes in the draft, too many practices, no costs and no role for the site leads, and asks classmates a question. Margin notes mark the costs and measures.

Where the marks sit in the WMBA 6010 Week 8 rubric

Graders reward visible revision in response to feedback, with cuts explained as well as additions. Pricing each practice in hours shows business judgment and makes the plan fundable. Measures with baselines and targets, fixed before results arrive, earn credit because they make success testable. Linking each measure to a problem identified earlier in the term shows the plan is coherent. A risks section that addresses how the plan could fail, and builds structures to prevent it, demonstrates realism. The reflection is often graded separately and rewards specific errors with their causes. The finished plan should also make sense to someone who never read the draft. Professional formatting and accurate APA citations complete the requirements.

WMBA 6010 Week 8 help: mistakes that cost marks

Reread the feedback on your draft and list every point it made. Decide which practices to keep by asking which ones address the most serious problems, and cut the rest. Price what remains in hours, even roughly. Set baselines from records you already have and targets that are ambitious but believable. Students often lose marks by adding to the draft instead of improving it, or by writing a reflection that praises their own growth without naming a mistake. Another gap is measures that cannot be collected; choose ones your records already support. Make sure the final plan explains itself without the draft. If you need a custom sample final plan and reflection built from your own draft, send it to us with the feedback you received.

Get a WMBA 6010 Week 8 example written to your instructions

Send both Week 8 pieces, the final plan prompt and the reflection instructions, with your rubric and the instructor comments on the draft, and matched samples come back in 24-48h, free on a first request. Tell it whether an executive summary is required. The reflection can only be a pattern for you; what changed in your draft is nobody else's to supply.

More WMBA 6010 papers and MBA samples

WMBA 6010 Week 8 questions, answered

Where can I find a free WMBA 6010 Week 8 sample paper?

You will find the finished collaboration plan and its reflection post in full on this page.

What changed from the draft?

Seven practices became four, each was priced in hours and the Lisbon and Manila leads were given a role.

What does the plan cost?

About 25 hours a month across the team, roughly one percent of its working time.

What are the four practices?

A rotating monthly review, a quarterly development assignment, written feedback on large projects and a quarterly three-site review.

What mistakes does the reflection name?

Too many practices, no costs and no role for the site leads whose cooperation the plan depended on.