Free sample paper for WMBA 6040 Week 4
Coating Defects Top the Pareto Chart, but the Waiting Causes Them: A Pareto Analysis of 1,170 Remakes at an Optical Lab, Stratified by How Long Lenses Sat Before Coating
Student Name
Walden University
WMBA 6040: Improving Business Performance
Instructor Name
Month Day, Year
Coating Defects Top the Pareto Chart, but the Waiting Causes Them: A Pareto Analysis of 1,170 Remakes at an Optical Lab, Stratified by How Long Lenses Sat Before Coating
The Problem and the Tool
Final inspection at Clearwater, the invented lens lab this course follows, rejects about 9 percent of jobs, and every rejected job is remade from the beginning, adding about six business days to its turnaround. Week 3 proposed first-pass yield as a weekly measure. This paper applies one quality tool, the Pareto chart, to four weeks of reject records to find where remakes come from, and then stratifies the largest category to see what lies beneath it.
The Pareto principle, named by Juran after the economist Vilfredo Pareto, holds that most occurrences of a problem tend to trace back to a handful of causes, so ranking causes by frequency shows where effort will pay most (Juran & De Feo, 2010). The chart itself is simple: categories in descending order of frequency, with a cumulative percentage. Its value depends on the categories being defined consistently, which the lab's reason codes allow.
The Data
Over four weeks, final inspection examined about 13,000 jobs for the first time and rejected 1,170, a first-pass yield of 91 percent. Each reject carries one reason code entered by the inspector.
Table 1
Remakes by Reason Code, Four Weeks
| Reason | Remakes | Percent | Cumulative percent | |
|---|---|---|---|
| Coating defect (spots, crazing, peeling) | 398 | 34.0 | 34.0 | |
| Axis error at edging | 257 | 22.0 | 56.0 | |
| Power outside tolerance | 176 | 15.0 | 71.0 | |
| Scratch in handling | 140 | 12.0 | 83.0 | |
| Frame damaged or wrong size | 94 | 8.0 | 91.0 | |
| Other | 105 | 9.0 | 100.0 | |
| Total | 1,170 | 100.0 | Not applicable | |
Counts are composite figures for a four-week period.
Figure 1
Remakes by Reason Code, Four Weeks
Bars are ordered by frequency, with Other placed last by convention.
What the Chart Shows at the Surface
The chart shows the expected concentration. Coating defects and axis errors together account for 56 percent of remakes, and the top three categories for 71 percent. A manager reading only the chart would conclude that the coating department has a quality problem and the edging department a calibration problem, and would direct attention to those two departments.
That conclusion is partly right and partly misleading, which is why the largest category needs a second look.
Beneath the Largest Category
Coating defects can arise inside the chamber, from a contaminated chamber or a bad batch of material, or before it, from lenses that are not perfectly clean when they enter. Polishing compound that dries on a lens surface is hard to remove completely, and lenses that wait longer between surfacing and coating have more time for residue to harden. The Week 2 map showed that coated lenses wait an average of 2.4 business days for a run of their formulation. If waiting causes defects, defect rates should rise with waiting time.
The lab's scans record when each lens left surfacing and when it entered coating, so the coating rejects can be stratified by that interval.
Table 2
Coating Defect Rate by Hours Waiting Between Surfacing and Coating
| Hours waiting | Coated jobs inspected | Coating defects | Defect rate | |
|---|---|---|---|
| Under 12 | 1,820 | 44 | 2.4 percent | |
| 12 to 36 | 2,950 | 116 | 3.9 percent | |
| Over 36 | 3,030 | 238 | 7.9 percent | |
| All coated jobs | 7,800 | 398 | 5.1 percent | |
Jobs are grouped by the interval recorded in tray scans; composite figures.
The pattern is strong. Lenses that waited more than 36 hours had a coating defect rate more than three times that of lenses coated within 12 hours. Waiting over 36 hours accounts for 39 percent of coated jobs but 60 percent of coating defects.
This does not prove that waiting causes defects. Lenses that wait longer may differ in other ways; for example, a formulation used mainly for high-index lenses, which are harder to coat, might also be the one run least often. A check by formulation would be the next step. But the stratification changes the likely remedy. If waiting drives defects, the fix is not mainly inside the coating department's process; it is the coating schedule, the same constraint the Week 2 map identified for turnaround.
A Brief Look at the Second Category
Axis errors were also stratified, by edger and shift. Seventy percent came from one of the lab's four edgers, and most of those from the night shift, when the machine's calibration is checked least often. That category appears to have a simpler cause, a single machine's calibration, which the edging lead can test with a daily calibration check.
What the Analysis Finds
The surface finding is that coating defects are the largest source of remakes. The finding underneath is that coating defects concentrate among lenses that wait longest before coating, which links the lab's largest quality problem to its largest flow problem. Shortening the wait at coating could therefore improve yield and turnaround together, and it would shrink the stock of unfinished trays as well, since work in process rises with time in the system (Little, 1961). Ishikawa (1985) taught that quality problems should be traced from their visible effects back to their process causes, and the stratification is a small instance of that discipline.
Limits
Four weeks of data may not capture seasonal changes in mix. Reason codes depend on inspectors' judgment, and "Other" holds 9 percent of remakes that deserve a closer look. Most important, the waiting-time link is a correlation; a small test, coating one formulation more often for two weeks, would show whether defects fall when waits shrink.
What the Lab Should Do Next
The analysis points to two next steps. The first is a short test of the waiting link: for two weeks, the lab should run one coating formulation four times a day instead of once every day and a half, and compare that formulation's defect rate with the other two. If its defect rate falls toward the rate seen for short waits, the case for changing the whole coating schedule becomes much stronger. The second is a daily calibration check on the edger that produced most axis errors, a ten-minute task at the start of each shift. Both steps are cheap, both can begin within a week and both produce data the lab can read within a month. Neither requires new equipment.
References
Ishikawa, K. (1985). What is total quality control? The Japanese way (D. J. Lu, Trans.). Prentice-Hall.
Juran, J. M., & De Feo, J. A. (2010). Juran's quality handbook: The complete guide to performance excellence (6th ed.). McGraw-Hill.
Little, J. D. C. (1961). A proof for the queuing formula: L = λW. Operations Research, 9(3), 383-387. https://doi.org/10.1287/opre.9.3.383
What the WMBA 6040 Week 4 instructions ask for
Quality method assignments ask students to apply one named tool, such as a Pareto chart, fishbone diagram, control chart or five whys, to a real or scenario problem from their chosen operation. Prompts require the tool's output reproduced in the paper and a finding that distinguishes what appears at the surface from what produces it underneath. Instructors expect the tool to be used, not summarized, and the data behind it to be shown. Expect a table, a figure and around four or five pages. Students should explain why they chose the tool and how the data were categorized. A second step, such as stratifying the largest category, often turns a routine chart into a real finding. Ending with what the data cannot prove is a mark of a careful analyst.
How the WMBA 6040 Week 4 example is put together
The paper states the problem, remakes at 9 percent of jobs, and introduces the Pareto principle with Juran and De Feo. A data section reports four weeks of first inspections and rejects. A table lists six reason codes with counts, percentages and cumulative percentages, and a bar chart reproduces them. A section describes what the chart suggests at the surface. A section then explains how waiting could cause coating defects and stratifies the category by hours between surfacing and coating, in a second table. The paper notes the pattern and its limits, including the possibility that formulation explains it. A short section traces axis errors to one edger. The findings link quality and flow and cite Ishikawa on tracing effects to process causes and Little on work in process. Annotations single out the data, the split by waiting time and the limits.
WMBA 6040 Week 4 rubric: what earns full marks
Graders reward a tool actually applied to data, with its output reproduced and readable. Accurate categories and arithmetic, including percentages and cumulative totals, show care. Moving beyond the chart's surface, for example by stratifying the largest category, often earns the most credit because it reaches a likely cause. Explaining a plausible mechanism, here dried residue on waiting lenses, strengthens the finding. Acknowledging that a pattern is correlational and proposing a test demonstrates analytic maturity. Connecting the finding to earlier work on the same operation shows coherence. Graders also want the paper to say plainly what the chart revealed and where its reach ended. A labeled figure, consistent tables and accurate APA citations complete the expectations for the week.
WMBA 6040 Week 4 help: mistakes that cost marks
Choose one tool your course covers and one problem with data you can categorize. Define your categories before counting, and check that each record fits one. Build the table first, then the chart from it. Ask whether the largest category could have more than one cause, and split it by a factor such as time, shift or machine. Students often lose marks by describing several tools briefly instead of applying one, or by presenting a chart without the data behind it. Another frequent gap is treating the largest bar as the answer without asking what produces it. State plainly whether your finding is a cause or a pattern. Keep the chart readable and labeled. If you want a custom sample quality tool paper using your own data, send us the records.
Get a WMBA 6040 Week 4 example written to your instructions
Send the prompt with the rubric and note which quality method your section assigned, since the draft is constructed around that one instrument rather than a survey of them all. Turnaround runs 24-48 hours and a first request carries no cost. Scenario data can stand in when a workplace supplies none.
More WMBA 6040 papers and MBA samples
- WMBA 6040 Week 1: Operation as a System Post
- WMBA 6040 Week 2: Swimlane Process Map
- WMBA 6040 Week 3: Performance Measures Defense
- WMBA 6040 Week 5: Lean Waste Analysis
- WMBA 6040 Week 6: Constraint Intervention Brief
- WMBA 6040 Week 7: Improvement Plan Draft
- WMBA 6040 Week 8: Final Plan and Sustain Reflection
- WMBA 6030 Week 4: Online Channel Unit Economics
- WMBA 6020 Week 4: Better Place Failure Analysis
- WMBA 6010 Week 4: Difficult Conversation Plan
- WMBA 6000 Week 4: Follower Style Map
WMBA 6040 Week 4 questions, answered
Where can I find a free WMBA 6040 Week 4 sample paper?
The complete Pareto analysis of 1,170 remakes, with its table and chart, is posted here.
Which reason codes lead the chart?
Coating defects at 34 percent and axis errors at 22 percent of remakes.
What did stratification show?
Lenses waiting over 36 hours before coating had a defect rate of 7.9 percent, against 2.4 percent under 12 hours.
What causes most axis errors?
One of four edgers, mostly on the night shift, when calibration is checked least.
Is waiting proven to cause coating defects?
No; the link is a correlation, and a trial running one formulation more often would test it.