| Course | MMHA 6111 Leadership and Organizational Change |
|---|---|
| Week | Week 7 |
| Paper type | Change communication calendar |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Master of Healthcare Administration (MHA) |
| Updated | October 2026 |
Free sample paper for MMHA 6111 Week 7
Communication Cadence: A Calendar From Announcement to the First Month at the Combined Site
Student Name
Walden University
MMHA 6111: Leadership and Organizational Change
Instructor Name
Month Day, Year
Communication Cadence: A Calendar From Announcement to the First Month at the Combined Site
Introduction
Communication sections in change plans often describe a launch announcement and then fall silent, which leaves people to fill the silence with rumor during the months when the change is actually happening. This calendar spans the whole consolidation of the composite Westside Imaging Center into the hospital imaging department, from announcement in January to the first month at the combined site in July. It sets a recurring rhythm for each audience, names a guiding coalition member who carries each channel and includes a listening route that sends staff questions back to the people deciding. Kotter argues that change efforts typically under-communicate their vision by a wide margin, and that a vision is communicated more by repeated, consistent messages through many channels than by a single announcement (Kotter, 2012).
The Calendar
Table 1 shows the calendar by audience and period.
Table 1
Communication Calendar by Audience and Period
| Audience | January to March: announce and plan | April to June: prepare and move | July: first month combined |
|---|---|---|---|
| Westside technologists | Monday huddle with their own lead: what is changing, what is not, what you will lose and how we will address it | Monday huddle: what travels to the new site; walk-throughs of the hospital department | Daily huddle at the combined site, led jointly by both leads |
| Hospital technologists | Monday huddle with their lead: how your week will change | Monday huddle: meeting Westside colleagues; the merged on-call rotation | Daily joint huddle |
| Schedulers and front desk | Standing agenda item at the weekly scheduling meeting | Template building sessions with schedulers from both sites | Daily check-in on the merged template |
| Radiologists | Note from the imaging medical director at the monthly section meeting | One worklist go-live date and test | Feedback at the monthly section meeting |
| Referring offices | Letter from the imaging medical director announcing the change and the date | Second letter with the new number and order routing, six weeks before the move; follow-up call to each office | Reminder letter and a check on misrouted orders |
| All staff at both sites | Monthly open forum with the manager and medical director | Monthly open forum | Open forum at the end of the first month |
The Guiding Coalition
Six people carry the channels, chosen so that each audience hears from someone it already trusts. The Westside lead technologist reaches Westside technologists and is the person they turn to now. The hospital lead technologist reaches hospital technologists. A Westside front desk staff member and a central scheduling supervisor jointly reach schedulers and front desk staff, and will co-lead the template building. The imaging medical director reaches radiologists and referring offices, whose physicians respond to a physician. The imaging manager hosts the monthly forum and answers for decisions. Kotter describes a guiding coalition as a group with enough position power, expertise, credibility and leadership to drive the change (Kotter, 2012). This coalition is chosen mainly for credibility with each audience, because the manager alone does not have it with every group.
What Each Message Must Carry
Each cell in the calendar carries one message, not a list. Changes produce more information than any audience can absorb, and a message that tries to say everything says little. For Westside technologists in the first months, the message is acknowledgment of what they are losing and a commitment to address it, because the impact grid identified desire as their weakest point. For hospital technologists, the message is how their own week will change, because awareness is their gap. For referring offices, it is the new number and date, repeated three times, because an office that misses it will send a patient to a closed site.
The Listening Route
Communication that only flows down does not reach the people deciding. The calendar includes a listening route. Questions raised at any huddle are written down by the lead and sent to the manager by the end of the day. Staff can also submit questions anonymously through a box at each site and an online form, which matters because, as Edmondson found, team members raise concerns more readily when they feel psychologically safe (Edmondson, 1999), and not everyone feels safe asking in front of colleagues. The manager answers every question within a week, in writing, at the next huddle, and posts the answers on a shared page. Questions that reveal a problem with the plan, such as the parking concern Westside staff raised for older patients, are taken to the coalition, and the response is reported back. The route is judged by one measure: the share of questions answered within a week.
Matching Channel to Audience
Each channel was chosen for how its audience already receives information. Technologists at both sites start the week with a Monday huddle, so the calendar uses it rather than adding a meeting they would have to leave patients to attend. Schedulers meet weekly already, so the consolidation becomes a standing item there. Radiologists attend a monthly section meeting and read notes from their medical director, so that is the route. Referring offices are small practices with busy front desks; a letter alone is easily lost, so the calendar pairs each letter with a phone call from the medical director's office to the office manager. The monthly open forum is the one new channel, created because some questions cut across groups and deserve a common answer heard by everyone at the same time. Matching channels to existing habits also reduces the burden of the change itself, which is already asking a great deal of everyone's time.
Silence and Repetition
The calendar deliberately continues into the first month at the combined site, when most communication plans have ended. That month is when the change is most real to staff, when problems surface and when the temptation to recreate old routines is strongest. Bridges and Bridges describe the period after a change as a neutral zone, in which old ways are gone and new ones not yet established, and argue that it needs more communication, not less (Bridges & Bridges, 2016). The daily joint huddle and the end-of-month forum are there to keep the conversation going until the new routines settle.
References
Bridges, W., & Bridges, S. (2016). Managing transitions: Making the most of change (4th ed.). Da Capo Lifelong Books.
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Kotter, J. P. (2012). Leading change. Harvard Business Review Press.
The Walden MMHA 6111 Week 7 instructions
Communication plans for a change usually ask how the change will be explained to those affected. Build a calendar that spans the whole change, including the period after it takes effect. For each audience, name who speaks, through which channel and the single message that period must carry. Choose speakers for their credibility with each audience, and explain the choices in a coalition roster. Match channels to how each audience already receives information. Include a listening route that sends questions back to decision makers and answers them within a set time, with an anonymous option. Explain why communication continues after the change date. Avoid a plan that ends with the announcement or relies on one channel for everyone.
How this MMHA 6111 Week 7 example is built
The introduction explains why the calendar spans January to July, citing Kotter on under-communication. Table 1 shows six audiences across three periods, with speaker, channel and message. The coalition section names six members chosen for credibility with each audience. A section explains the one-message rule, tying each message to the impact grid's gaps. A section explains channel choices. The listening section describes the route from huddles and an anonymous box to written answers within a week, citing Edmondson on psychological safety. The closing explains why communication continues into the first month, citing Bridges and Bridges on the neutral zone.
Where the marks sit in the MMHA 6111 Week 7 rubric
Communication plans are judged on whether they would keep people informed through the whole change. A plan describing an announcement and a few updates earns little credit. A calendar that spans the change, with speakers, channels and messages for each audience, earns the first share. A coalition chosen for credibility, with reasons, earns the next. Single, targeted messages tied to each group's gap show discipline. A listening route with answers and a time limit carries a large share, because communication that only flows down misses problems. Continuing after the change date shows understanding of transitions. Citations should support specific design choices. A plan using one channel for all audiences loses credit.
MMHA 6111 Week 7 help from the desk
Communication plans often describe a town hall, an email and a newsletter, with the same message for everyone. Begin instead by listing each audience and asking whom they already trust and where they already hear news. Then decide the one thing each audience needs to hear in each period. Build a calendar from those answers. Add a way for questions to travel back up, and promise a time limit for answers. Finally, extend the calendar past the change date, because that is when people need it most. We can build a communication calendar for your change with audiences, speakers, messages and a listening route. A calendar that keeps going after launch is rare and valuable.
Get a MMHA 6111 Week 7 example written to your instructions
Audiences named in your earlier installments shape this one, so list them with the Week 7 prompt and rubric; the calendar and its coalition roster follow within 24-48 hours, first one free. Sections that want drafted message text as well can ask for a short appendix of messages alongside the grid.
More MMHA 6111 papers and MHA samples
- MMHA 6111 Week 1: Leadership Practices Baseline Post
- MMHA 6111 Week 2: Self-Assessment Reflection
- MMHA 6111 Week 3: Change Model Contrast Post
- MMHA 6111 Week 4: Change Urgency Case Paper
- MMHA 6111 Week 5: Resistance as Information Post
- MMHA 6111 Week 6: Change Impact Grid Paper
- MMHA 6111 Week 8: Change Implementation Workplan
- MMHA 6111 Week 9: Change Evaluation Scorecard
- MMHA 6111 Week 10: Change Anchoring Plan Paper
- MMHA 6111 Week 11: Organizational Change Plan Paper
- MMHA 6050 Week 7: International System Comparison
- MMHA 5500 Week 7: Performance Appraisal Design Paper
- MMHA 6400 Week 5: Financial Analysis
MMHA 6111 Week 7 questions, answered
Where can I find a free MMHA 6111 Week 7 sample paper?
Read the communication calendar and coalition roster here free.
What period does the MMHA 6111 Week 7 calendar cover?
From the January announcement to the end of the first month at the combined site in July.
Who carries the messages?
A six-member guiding coalition chosen for credibility with each audience, including both lead technologists and the imaging medical director.
How do questions reach decision makers?
Through huddle notes sent daily and an anonymous box, with written answers within a week.
Why does communication continue after the move?
The first month is the neutral zone, when problems surface and people need more communication, not less.