MMHA 6111 Week 4 Change Urgency Case Paper Example

Leadership and Organizational Change Walden University Free custom sample in 24 to 48h

This MMHA 6111 Week 4 urgency case example opens the change plan for consolidating a composite satellite imaging center into a hospital imaging department, and builds urgency from evidence staff can verify rather than alarm. Walden MMHA 6111 asks MHA students to make the case for change honestly, and the paper describes duplicated CT, MRI, scheduling, on-call coverage and radiologist worklists in a table, states what keeps happening if nothing changes in terms a technologist would recognize and anchors timing to a lease that ends June 30 with notice due December 31. It says openly what the change is not, no staff reduction, no cut in imaging, no judgment on the satellite team, citing Oreg and colleagues, names what staff will lose, citing Bridges and Bridges, and plans how the case will be tested with lead technologists first, following Kotter.

CourseMMHA 6111 Leadership and Organizational Change
WeekWeek 4
Paper typeChange urgency case paper
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Healthcare Administration (MHA)
UpdatedOctober 2026

Free sample paper for MMHA 6111 Week 4

1

The Case for Consolidating Imaging: A Problem Staff Can Verify, a Date the Organization Set and What the Change Is Not

Student Name

Walden University

MMHA 6111: Leadership and Organizational Change

Instructor Name

Month Day, Year

What this page is doingThe title promises verifiable urgency and an honest limit, which is where change plans most often reach for alarm instead.
2

The Case for Consolidating Imaging: A Problem Staff Can Verify, a Date the Organization Set and What the Change Is Not

Introduction

This installment opens the change plan for consolidating the composite Westside Imaging Center, a satellite outpatient site, into the hospital's imaging department. It makes the case for the change. Kotter places creating a sense of urgency first among his eight steps, and warns that many change efforts fail because complacency is underestimated (Kotter, 2012). But urgency built on alarm, warnings about industry disruption or vague threats to the organization, tends to produce anxiety rather than commitment. This case instead frames the consolidation as a problem staff can verify from their own working week, anchors its timing to a date inside the organization and says openly what the change is not about. All figures are illustrative.

What this page is doingThe introduction places this installment in the change plan and states its approach to urgency.
3

The Problem

The two imaging sites duplicate each other in ways that every technologist, scheduler and radiologist at both sites already knows. Table 1 sets out the duplication.

Table 1

Duplication Between the Two Imaging Sites (Illustrative)

AreaWestside Imaging CenterHospital imaging departmentWhat staff see
CTOne scanner, 11 years old, due for replacementTwo scanners with spare outpatient capacityWestside CT down for repairs four times last year; patients rebooked to the hospital
MRIOne scanner, 4 years oldOne scanner; outpatient wait about 12 business daysLong MRI waits at the hospital while Westside's scanner has open afternoon slots
Front desk and schedulingTwo staff answering referring officesCentral scheduling answering the same officesReferring offices call both sites for the same patient
CoverageSeparate technologist on-call for one siteHospital on-call rotationTwo on-call rotations covering the same patients
Radiologist readingRead remotely by the same radiology groupRead on siteTwo worklists for the same radiologists
What this page is doingThe problem is described as operations rather than strategy, in terms a technologist would recognize.
4

What Happens if Nothing Changes

If nothing changes, the pattern in Table 1 continues. Westside's CT scanner will keep failing until it is replaced, and every failure means rebooking patients to the hospital, which the hospital's schedulers already do several times a year. Replacing it would cost about $1.2 million, illustrative, for a scanner whose volume the hospital's two CT scanners could absorb. Hospital outpatients will keep waiting about twelve business days for MRI while Westside's MRI has open afternoon slots that patients cannot easily reach, because the two sites schedule separately. Referring offices will keep calling two numbers. Technologists at Westside will keep covering a separate on-call rotation for a site with one technologist per modality, which means a sick call often leaves a modality closed for the day. None of this is a crisis, which is precisely why it has continued: each problem is small, and staff have learned to work around it.

What this page is doingThe status quo is stated in terms an ordinary shift would show, not in strategic language.
5

Why Now

The timing rests on a date the organization already faces. Westside's lease ends on June 30, and the lease requires six months' notice of non-renewal, so a decision must be made by December 31. Renewing would mean signing a five-year commitment and replacing the CT scanner, locking in the duplication for at least five more years. Not renewing gives the organization a natural point to combine the sites. This is the urgency: not that the industry is changing, but that a decision is coming due regardless of what the organization wants, and that choosing to renew is also a choice.

What this page is doingTiming rests on a date inside the organization rather than on outside warnings.
6

What the Change Is Not

The consolidation is not a reduction in staff. Every Westside technologist and front desk employee will be offered a position in the hospital department at the same pay and seniority; the combined department will need them, because it will absorb Westside's volume. It is not a reduction in outpatient imaging; the same exams will be available, and MRI capacity for outpatients will increase. And it is not a judgment on Westside's team, whose work has kept a small site running well with limited equipment. Saying these things plainly matters because staff will otherwise fill the silence with the worst interpretation, and research on how employees respond to change finds that perceived threats to job security and trust in management strongly shape their reactions (Oreg et al., 2011).

What this page is doingStating openly what the change is not about is what makes the rest credible.
7

What Staff Will Lose

The case should not pretend the change costs staff nothing. Westside's team will lose a site many of them chose for its size and pace, a direct relationship with regular patients and a schedule they shaped themselves. Some will face a longer commute, and parking at the hospital is harder. These losses are real, and later installments of this plan will address them directly. Bridges and Bridges argue that people need to let go of what they are losing before they can accept what is new (Bridges & Bridges, 2016), and a case for change that ignores the losses will not be believed.

What this page is doingAcknowledging real losses alongside the case keeps the urgency honest.
8

What the Combined Department Gains

The case is not only about ending duplication; it is also about what the combined department makes possible. With Westside's MRI scanner moved into the hospital department, outpatient MRI capacity roughly doubles, which should bring the wait for an outpatient MRI well below its current twelve business days. A single scheduling team means a referring office makes one call. A single on-call rotation means technologists share coverage across a larger team, so a sick call no longer closes a modality for the day. Westside technologists will gain access to the hospital department's education programs and to modalities they have not worked with, such as interventional imaging, if they want them. These gains should be stated as concretely as the problems, because a case that describes only what is wrong gives people nothing to move toward.

What this page is doingStating the gains in the same concrete terms as the problem gives staff something to move toward.
9

How the Case Will Be Shared

The case will be shared first with the lead technologists at both sites, who will be asked to check Table 1 against their own experience and correct anything that is wrong, before it is presented to all staff. That step does two things: it makes the problem statement more accurate, and it begins forming the guiding coalition that Kotter's second step requires (Kotter, 2012). The all-staff presentation will follow, with the lease date, the decision deadline and the commitments in the section above stated in the first five minutes, and with time for questions. The manager will not claim the case is settled until staff have had a chance to test it.

What this page is doingThe installment closes with how urgency will be built with staff, not just announced.
10

References

Bridges, W., & Bridges, S. (2016). Managing transitions: Making the most of change (4th ed.). Da Capo Lifelong Books.

Kotter, J. P. (2012). Leading change. Harvard Business Review Press.

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

What the MMHA 6111 Week 4 instructions ask for

Urgency cases in a change plan usually ask you to explain why a change must happen now. Describe the problem as operations staff can see in their own working week, not as strategy. Label any figures as illustrative if they are. State what will keep happening if nothing changes, in concrete terms. Anchor the timing to a date inside the organization, such as a lease or contract deadline, rather than warnings about the industry. Say openly what the change is not about, especially if staff may fear job losses. Acknowledge what staff will lose, and state what the change makes possible. Close with how the case will be shared and tested with staff before it is announced as settled. Cite sources on urgency and on how people respond to change.

How the MMHA 6111 Week 4 example is put together

The introduction places the case in the plan and contrasts verifiable urgency with alarm, citing Kotter. Table 1 shows duplication in CT, MRI, front desk, coverage and reading. A section describes the status quo: CT failures, long MRI waits, double calls and closed modalities on sick days. A section anchors timing to the lease end and notice date. A section states what the change is not, citing Oreg and colleagues on job security and trust. A section names losses, citing Bridges and Bridges. A section describes gains in MRI capacity, single scheduling and shared coverage. The final section has lead technologists check the table before an all-staff presentation, which begins forming Kotter's guiding coalition.

MMHA 6111 Week 4 rubric: what earns full marks

Urgency cases are judged on whether staff would believe them. A case that warns of industry disruption or financial threat, without problems staff can verify, earns little credit and often backfires. Describing the problem in operational terms staff recognize earns the first share. Anchoring timing to an internal date earns the next. Stating what the change is not about, and acknowledging losses, carries a large share because it builds credibility. Stating concrete gains gives people something to move toward. A plan to test the case with staff before announcing it shows respect for Kotter's coalition step. Labeled illustrative figures and accurate citations complete the assessment.

Common MMHA 6111 Week 4 mistakes, and how to avoid them

Urgency cases often borrow alarming language, such as adapt or fall behind, that staff have heard before and discount. Ask instead what problems your staff already complain about that the change would solve, and describe those. Then find the date that makes the decision unavoidable, such as a contract ending. Write a sentence about what the change is not, especially about jobs, and another about what people will lose. Finally, show the case to a few trusted staff before presenting it widely, and let them correct it. We can write an urgency case for your change plan built on problems staff can verify and a date the organization faces.

Get a MMHA 6111 Week 4 example written to your instructions

Include any change-plan template alongside the Week 4 prompt and rubric; the urgency case comes back within 24-48 hours and the first one is free. When the plan follows a transition at your own organization, describe it in general terms only, so the sample can mirror its shape without internal figures leaving your hands.

More MMHA 6111 papers and MHA samples

MMHA 6111 Week 4 questions, answered

Where can I find a free MMHA 6111 Week 4 sample paper?

The urgency case and its duplication table are posted here free.

What change does the MMHA 6111 Week 4 case support?

Consolidating a satellite imaging center into a hospital imaging department when the satellite's lease ends.

How is urgency created without alarm?

By describing duplication staff see every week and anchoring the timing to a lease date and notice deadline.

What does the case say the change is not?

Not a staff reduction, not a cut in outpatient imaging and not a judgment on the satellite team.

How will the case be shared?

First with lead technologists, who check it against their experience, then at an all-staff presentation with time for questions.