This MMHA 6111 Week 10 anchoring plan example draws on Bridges and Bridges' distinction between a change, which happens on a date, and a transition, which happens to people over months, to give a merged imaging team a marked ending, a managed neutral zone and a new beginning people can see. Walden MMHA 6111 asks MHA students to plan beyond the move date, and the paper names what the satellite team loses, its building, its direct patient line, a schedule it controlled, and plans a closing gathering where the team chooses practices to carry forward. Paired technologists, a joint daily huddle and an interim scheduling lead carry the neutral zone. A new name and a ninety-day gathering mark the beginning, Kotter's anchoring step writes practices into procedures and Oreg and colleagues frame the risks.

CourseMMHA 6111 Leadership and Organizational Change
WeekWeek 10
Paper typeChange anchoring plan paper
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Healthcare Administration (MHA)
UpdatedOctober 2026

Free sample paper for MMHA 6111 Week 10

1

Anchoring the Change: Endings, the Neutral Zone and a New Beginning for the Merged Imaging Team

Student Name

Walden University

MMHA 6111: Leadership and Organizational Change

Instructor Name

Month Day, Year

What this page is doingOrganizing the plan by Bridges' three phases signals that the transition happens to people over months, not on the move date.
2

Anchoring the Change: Endings, the Neutral Zone and a New Beginning for the Merged Imaging Team

Introduction

Most sustainability sections assume a change is finished once the move is complete. William Bridges drew a distinction that argues otherwise: a change is situational and happens on a date, while a transition is the psychological process people go through to come to terms with it, and it happens over months (Bridges & Bridges, 2016). The move of Westside's team into the hospital department takes place on June 30. The transition for the merged team will take much longer. This plan gives that team a marked ending, a managed neutral zone and a new beginning people can actually see, using Bridges' three phases rather than a calendar to organize the work.

What this page is doingThe introduction states Bridges' distinction between change and transition, which organizes the plan.
3

Endings

Bridges argues that every transition begins with an ending, and that people who are not helped to let go will carry the old situation into the new one (Bridges & Bridges, 2016). The Westside team's losses are specific. They lose their building, a small site many of them chose. They lose a direct phone line to their patients, who called them by name. They lose a schedule they built and controlled, including the weekend rotation two technologists designed together. And they lose the identity of being a small, capable team that solved problems without asking anyone.

The plan marks these endings in three ways. First, the manager names the losses aloud, at a Westside huddle in May, without minimizing them. Second, the team holds a closing gathering at Westside in the last week, with patients who wish to come, and spends part of it recording which of its practices should travel to the combined department, such as the patient notes about who needs extra time, the habit of calling patients the day before complex exams and the self-designed rotation approach. Third, the list is presented to the combined department's leads, who commit in writing to adopting at least three items. That commitment turns the ending into a contribution.

What this page is doingThe endings section names what the satellite team actually loses and how the loss will be marked.
4

The Neutral Zone

The neutral zone is the unsettled period after the old way has ended and before the new one is established, when people are confused, productivity may dip and old conflicts may resurface (Bridges & Bridges, 2016). For the merged team, it will cover roughly July through September. The plan uses temporary structures to carry people through it. Technologists are paired across the two former teams for their first month, one from Westside and one from the hospital, so that each learns the other's practices and no one works only with people they already know. A short daily huddle, led jointly by the two former leads, surfaces problems before they harden. An interim scheduling lead, one of the Westside front desk staff, works inside central scheduling to carry Westside's patient knowledge into the merged template. These structures are explicitly temporary and are reviewed at the end of September.

What this page is doingThe neutral zone section covers the unsettled weeks with temporary structures.
5

New Beginnings

A new beginning needs a purpose, a picture of what the new situation will be like, a plan for getting there and a part for each person to play (Bridges & Bridges, 2016). The merged team's purpose is outpatient imaging with shorter waits and the kind of personal service Westside was known for. The picture is concrete: one team, one schedule, outpatient MRI waits under a week and a patient call before every complex exam. The plan is the scorecard's measures. Each person's part is visible: Westside technologists bring the practices their closing gathering chose, and hospital technologists bring their experience with the department's range of modalities.

The beginning is marked as deliberately as the ending. At the end of September, when the temporary structures are reviewed, the combined department adopts a new name for its outpatient service, chosen by staff from both former teams, and holds a gathering to recognize the first ninety days, including the first scorecard results.

What this page is doingThe new beginnings section states what the merged team now owns and how people will see it.
6

Anchoring in the Culture

Kotter's final step is anchoring new approaches in the culture, showing people how the new ways have improved performance and making sure the next generation of leaders embodies them (Kotter, 2012). The plan does this in three ways. The practices adopted from Westside are written into the department's procedures, so they survive staff turnover. The paired-technologist approach becomes part of orientation for every new hire. And the scorecard's access and complaint measures are added to the department's ongoing quality review, so that the gains the consolidation promised are watched long after the project ends.

What this page is doingThe plan connects Bridges to Kotter's final step, so the change is anchored rather than merely completed.
7

The Manager's Role in Each Phase

The manager's role changes across the three phases, and each phase draws on a practice the manager's own self-assessment rated as a weakness. In the endings, the manager must recognize what Westside's team has contributed and is giving up, which is the encouraging-the-heart practice the manager ranked lowest at the start of the term. In the neutral zone, the manager must resist stepping in to solve every problem personally, which the self-assessment showed was the manager's habit, and instead support the two leads and the paired technologists in solving problems themselves. In the new beginning, the manager must describe the future the merged team is building, the inspirational motivation the self-assessment rated as moderate. Writing these roles into the plan is a way of holding the manager to the development targets set earlier, at the moments when the consolidation will test them most.

What this page is doingSpelling out what the manager does in each phase ties the plan to the self-assessment that opened the course.
8

Risks to the Transition

The transition can fail in recognizable ways. If Westside staff cluster together and work apart from hospital staff, the consolidation will have moved a team without merging it; the pairing and the daily huddle exist to prevent this, and the manager will watch who works with whom. If the practices Westside chose are adopted in name but not in fact, the team will conclude that its ending was not honored. And if the first months bring more overtime and complaints than gains, staff may decide the change failed before it had a chance to work. The manager's role through the neutral zone is to keep naming what is happening, acknowledge difficulty and point to the gains as they arrive. Research on change recipients suggests that trust in management and a sense of being treated fairly shape how people respond over time (Oreg et al., 2011), and those are built or lost in exactly these months.

What this page is doingNaming risks to the transition shows the plan expects difficulty rather than assuming success.
9

References

Bridges, W., & Bridges, S. (2016). Managing transitions: Making the most of change (4th ed.). Da Capo Lifelong Books.

Kotter, J. P. (2012). Leading change. Harvard Business Review Press.

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

Reading the MMHA 6111 Week 10 instructions

Sustainability plans for a change usually ask how it will last. Use a transition model, such as Bridges', to organize the plan around what people go through rather than a calendar. Name specifically what the affected group loses and how each loss will be acknowledged and marked. Plan temporary structures for the unsettled period after the change, and say when they will end. Describe the new beginning concretely: its purpose, its picture, its plan and each person's part, and how it will be marked. Connect the plan to anchoring the change in procedures and orientation. Spell out the leader's role in each phase. Name the ways the transition could fail and what the leader will watch for. Avoid assuming the change is finished on the move date.

Inside the MMHA 6111 Week 10 example

The introduction distinguishes change from transition, citing Bridges and Bridges. The endings section names four losses and plans a May huddle, a closing gathering that chooses practices to carry forward and a written commitment from the combined leads. The neutral zone section describes paired technologists, a joint huddle and an interim scheduling lead through September. The new beginnings section states purpose, picture, plan and parts, and marks the beginning with a new name. A section uses Kotter's anchoring step. A section ties the manager's role in each phase to earlier self-assessment. The risks section names clustering, token adoption and early discouragement, citing Oreg and colleagues.

Reading the MMHA 6111 Week 10 rubric

Anchoring plans are judged on whether they address the months after the change. A plan that ends with the move and a celebration earns little credit. Naming specific losses and how they will be marked earns the first share. Temporary structures for the neutral zone, with an end date, earn a large share. A concrete new beginning, marked visibly, shows understanding of the model. Connecting to Kotter's anchoring step through procedures and orientation shows durability. Tying the leader's role to earlier self-assessment shows coherence. Naming failure modes shows realism. Accurate use of the transition model and citations complete the assessment.

MMHA 6111 Week 10 help from the desk

Sustainability sections often say the change will be reinforced through ongoing communication and recognition, without saying how or when. Begin with what people will lose, in specific terms, and plan how you will acknowledge each loss before the change. Then think about the weeks after, when old ways are gone and new ones are not yet set, and plan temporary supports for that period. Finally, describe what the new situation will look like and how you will mark its arrival. A plan built this way gives the change a chance to last. We can write an anchoring plan for your change organized around endings, the neutral zone and new beginnings.

Get a MMHA 6111 Week 10 example written to your instructions

Along with the Week 10 prompt and rubric, note which model the plan has leaned on so far. The anchoring plan comes back inside 24-48 hours, nothing charged the first time. Where the section frames sustainability through Kotter's final step rather than Bridges, the phases give way to that framing.

More MMHA 6111 papers and MHA samples

MMHA 6111 Week 10 questions, answered

Where can I find a free MMHA 6111 Week 10 sample paper?

The anchoring plan is reproduced here and free to read.

What distinction organizes the MMHA 6111 Week 10 plan?

Bridges' distinction between a change, which happens on a date, and a transition, which people go through over months.

How is the satellite team's ending marked?

By naming its losses, a closing gathering that chooses practices to carry forward and a written commitment to adopt them.

What supports the neutral zone?

Paired technologists from both teams, a joint daily huddle and an interim scheduling lead, reviewed at the end of September.

How is the new beginning marked?

With a new name for the outpatient service chosen by staff and a gathering recognizing the first ninety days.