BUSI 3010 Week 9 Shop Floor Layout Proposal Example

Operations Management Walden University Free custom sample in 24 to 48h

This BUSI 3010 Week 9 shop floor layout proposal example measures how far countertop pieces travel at a composite stone fabrication shop, 280 meters and eleven lifts per kitchen job, and proposes a U-shaped line that cuts travel to 104 meters and seven lifts. Walden BUSI 3010 judges a layout proposal on whether the gain is quantified, so the sample shows two layouts in tables measured the same way, then converts the 63 percent reduction into handling minutes, avoided cracks and recovered CNC time. Moving the CNC would cost about $44,000 with downtime, so the proposal also prices a $3,500 partial move of the polishing benches and recommends it now, with the full line deferred to the CNC's replacement. Muther's systematic layout planning grounds the design; the pricing of two options is the part BS in Business Administration students most often skip.

CourseBUSI 3010 Operations Management
WeekWeek 9
Paper typeLayout proposal
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramBS in Business Administration
UpdatedOctober 2026

Free sample paper for BUSI 3010 Week 9

1

Cutting Material Travel From 280 to 104 Meters per Job: A Layout Proposal That Puts a Stone Shop's Saw, CNC and Polishing Stations in One U-Shaped Line, Priced Against a Cheaper Partial Move

Student Name

Walden University

BUSI 3010: Operations Management

Instructor Name

Month Day, Year

What this page is doingThe title gives the measured and proposed distances first, because a layout proposal is judged on the figure connecting the two arrangements.
2

Cutting Material Travel From 280 to 104 Meters per Job: A Layout Proposal That Puts a Stone Shop's Saw, CNC and Polishing Stations in One U-Shaped Line, Priced Against a Cheaper Partial Move

The Current Arrangement

The Fargo countertop shop studied in this course (a composite) grew into its building one machine at a time. The slab yard sits outside the north door. The bridge saw stands along the east wall, near the yard. The CNC edging machine, bought later, went along the west wall because that was where the water recycling tank fit. The two polishing stations were placed back near the saw, where the original hand-finishing benches had been. Quality inspection happens in the middle of the floor, and finished pieces are staged at the south loading dock.

To measure travel, I followed twelve jobs from slab to staging in August 2028 and recorded every movement with a measuring wheel, counting each lift with the vacuum lifter as a handling move. Pieces from one job travel together on A-frame carts, but a typical kitchen needs two cart trips per segment because the pieces will not fit on one cart.

Table 1

Material Travel per Job, Current Layout

SegmentDistance per tripTrips per jobDistance per jobLifts per job |
Yard to bridge saw24 meters248 meters2 |
Saw to CNC, across the shop38 meters276 meters3 |
CNC back to polishing34 meters268 meters3 |
Polishing to inspection16 meters232 meters1 |
Inspection to staging dock28 meters256 meters2 |
Total140 meters2 per segment280 meters11 |

Averages of twelve jobs; Red River Stone & Surface and its building are composite.

What this page is doingThe current layout is described by the movement that actually happens across it, measured rather than estimated.
3

The two longest segments are the trip across the shop from the saw to the CNC and the trip back from the CNC to polishing. Together they account for 144 of the 280 meters. Those two segments also require six of the eleven lifts, because pieces must come off the saw table onto a cart, off the cart onto the CNC, and back again.

The Proposed Arrangement

The proposal reorganizes the four processing stations into a U-shaped line along the north and west walls. The bridge saw stays where it is, nearest the yard. The CNC moves to the north wall beside the saw, under the same gantry crane, so pieces can be lifted directly from the saw table to the CNC table. The polishing stations move to the west wall immediately after the CNC, and inspection sits at the end of the U, closest to the dock.

Table 2

Material Travel per Job, Proposed Layout

SegmentDistance per tripTrips per jobDistance per jobLifts per job |
Yard to bridge saw18 meters236 meters2 |
Saw to CNC, by gantry crane8 meters216 meters1 |
CNC to polishing6 meters212 meters2 |
Polishing to inspection8 meters216 meters1 |
Inspection to staging dock12 meters224 meters1 |
Total52 meters2 per segment104 meters7 |

Distances measured on a scaled floor plan; the yard door moves six meters east as part of the change.

What this page is doingThe revised layout is described by the same measures, so the improvement can be read as one number.
4

Travel per job falls from 280 meters to 104, a reduction of 63 percent, and handling moves fall from eleven to seven. Muther (1973) built systematic layout planning on the idea that activities with heavy flow between them should sit next to each other, and the saw-to-CNC and CNC-to-polishing pairs carry the heaviest flow in this shop.

What the Gain Is Worth

At the walking pace recorded with loaded carts, about 0.6 meters per second, the 176 meters saved per job equal about five minutes. Each lift with the vacuum lifter takes about three minutes, so four fewer lifts save about twelve minutes. Together that is roughly seventeen minutes of handling labor per job, or about 4.5 hours a week at the current 16 jobs.

Handling time is only part of the value. Fewer lifts mean fewer chances to crack a piece; the shop recorded eight pieces cracked in handling in the first half of 2028, each remade at about $1,450. And because the CNC is the shop's constraint, the crane waits that cost it about an hour a week would mostly disappear when pieces come straight from the saw under the same crane.

What the Move Costs

Moving the CNC is expensive. It needs a new concrete pad, a new water line to the recycling tank and three days of downtime, which at the constraint means about nine lost jobs that must be made up with overtime. The contractor's estimate is $38,000 for the pad, plumbing and electrical work, plus about $6,000 in overtime to recover the lost output.

Against that, the yearly gain is roughly $7,200 in handling labor at $32 an hour, perhaps $11,600 in avoided remakes if handling cracks fall by half, and about 50 hours of recovered CNC time. On those direct savings, payback on $44,000 is a little over two years: reasonable, but not urgent for a shop that expects to replace its CNC within three years.

A Cheaper Partial Move

Moving only the polishing stations to the west wall, next to the CNC where it stands now, costs about $3,500 for new benches, water and air lines. That shortens the trip back from the CNC to a few meters and saves one lift, cutting travel per job from 280 to about 212 meters and lifts from eleven to ten. It captures about 39 percent of the distance gain, 68 of 176 meters, for less than a tenth of the cost.

Recommendation

Move the polishing stations now. Plan the full U-shaped line for the day the CNC is replaced, expected within three years, when the new machine will need a pad and plumbing anyway and the move costs little extra. Meller and Gau (1996) described how layout decisions increasingly have to account for future change rather than a single fixed design; tying the full move to the CNC's replacement treats this layout as a sequence rather than a one-time choice. Stevenson (2021) notes that process layouts often suffer from long, irregular material flows as volume grows, which is the condition this shop has reached.

References

Meller, R. D., & Gau, K.-Y. (1996). The facility layout problem: Recent and emerging trends and perspectives. Journal of Manufacturing Systems, 15(5), 351-366. https://doi.org/10.1016/0278-6125(96)84198-7

Muther, R. (1973). Systematic layout planning (2nd ed.). Cahners Books.

Stevenson, W. J. (2021). Operations management (14th ed.). McGraw Hill.

Reading the BUSI 3010 Week 9 instructions

Week 9 asks you to propose a change to the physical arrangement of a space or line and to quantify the improvement. Measure the current layout by the movement that actually happens across it, such as distance traveled per unit or handoffs per unit, rather than estimating by eye. Present the revised layout with the same measures, so one figure connects the two. Then translate the improvement into value: labor time, damage avoided or capacity recovered. A strong proposal also counts the cost of moving equipment and any downtime, and compares at least one cheaper alternative. If drawings are not possible, tables of segments, distances and moves work well. Three to five pages is typical, with readings on layout planning.

How the BUSI 3010 Week 9 example is put together

The paper describes how the shop grew one machine at a time and explains how twelve jobs were followed with a measuring wheel. A table breaks the current 280 meters per job into five segments with trips and lifts, showing that the two cross-shop trips account for 144 meters. A second table measures the proposed U-shaped line at 104 meters and seven lifts, citing Muther on placing high-flow activities together. The value section converts savings into about seventeen minutes per job, fewer cracked pieces and recovered crane time at the constraint. A cost section prices the CNC move at $38,000 plus overtime. A partial move of the polishing benches is priced at $3,500, and the recommendation phases the full layout to the CNC's replacement, citing Meller and Gau and Stevenson.

BUSI 3010 Week 9 rubric: what earns full marks

The proposal earns credit for measurement. A current layout described only in words, or distances estimated by eye, cannot support a quantified gain, and graders look for a figure that links the two layouts. Measures should be the same for both arrangements so the comparison is fair. The value of the gain must be stated in terms an approver understands, such as hours, dollars or capacity, and the cost of the change must include downtime. Comparing a cheaper alternative and choosing between them shows judgment. Papers that recommend the most ambitious layout without pricing it tend to score lower than those that phase the change sensibly. Readings should support the layout logic, such as adjacency of high-flow steps.

Common BUSI 3010 Week 9 mistakes, and how to avoid them

Walk the process with a measuring wheel or a floor plan and record every movement of the product between stations, including how many trips and lifts each takes. Add them into a total per unit. Then sketch a better arrangement and measure it the same way. Convert the difference into time and money, and get a realistic estimate of what moving equipment would cost, including lost production. Look for a partial change that captures part of the gain cheaply. Weak proposals show a new layout without measuring the old one, report improvement as a feeling, or ignore the cost of the move. Others forget that moving a constraint machine stops output. If you need a model layout proposal for a space you work in, share its stations and the paths materials take.

Get a BUSI 3010 Week 9 example written to your instructions

Send the Week 9 prompt, the rubric, the current layout or a sketch of it, and any fixed constraints in the space, and a BUSI 3010 layout example returns inside 24-48 hours, first sample free. Floor plans are not interchangeable. What arrives is worked against the space you describe, with the fixed services and structure you name treated as immovable.

More BUSI 3010 papers and BS in Business Administration samples

BUSI 3010 Week 9 questions, answered

Where can I find a free BUSI 3010 Week 9 sample paper?

The complete layout proposal, both distance tables and the cost comparison, is open to read on this page.

How much travel does the BUSI 3010 Week 9 proposal save?

It cuts material travel from 280 to 104 meters per job, about 63 percent, and lifts from eleven to seven.

How were distances measured?

By following twelve jobs with a measuring wheel and counting every cart trip and lift between stations.

Why not move the CNC right away?

The move would cost about $44,000 with downtime, a payback of a little over two years for a machine due for replacement within three.

What does the proposal recommend now?

Moving the polishing benches beside the CNC for about $3,500, which captures 39 percent of the distance gain.