Free sample paper for BUSI 3010 Week 11
Fourteen Days Becomes Ten When the CNC Is Treated as the Constraint: An Operations Report on a Stone Fabrication Shop That Draws the Term's Map, Capacity, Bottleneck, Quality, Inventory, Forecast and Layout Work Into One Recommendation
Student Name
Walden University
BUSI 3010: Operations Management
Instructor Name
Month Day, Year
Fourteen Days Becomes Ten When the CNC Is Treated as the Constraint: An Operations Report on a Stone Fabrication Shop That Draws the Term's Map, Capacity, Bottleneck, Quality, Inventory, Forecast and Layout Work Into One Recommendation
The Claim
Red River Stone & Surface, the composite stone shop followed through this course, promises to install a kitchen countertop ten working days after templating and has averaged fourteen. The shop believes the cause is templating. This report argues that the cause is the CNC edging machine, that the machine loses about a fifth of its time to work that does not need to happen while it is stopped, and that three inexpensive changes, made in a set order, should bring lead time back to ten days through the 2029 summer peak without buying equipment.
The Evidence
Where Jobs Wait
The process map built early in the term followed four jobs through twenty-one steps and seven lanes. The longest wait between fabrication steps was in front of the CNC, nine to twenty-two working hours, while no other processing wait exceeded three hours. The week-long wait for a templating visit happens before the job reaches the shop floor and is caused by how visits are booked, not by how long templating takes.
How Much the Machine Can Do
The capacity calculation put the CNC's design capacity at 20 jobs a week and its effective capacity at 17, with actual output of 15.2. Utilization was 76.0 percent and efficiency 89.4 percent. Demand in May and June ran at 17 to 18 jobs a week, above effective capacity, which explains why the queue grew in summer.
Which Station Limits Output
Timing 29 jobs at seven stations confirmed the CNC as the constraint. Its measured time of 3.3 hours per job gives 15.2 jobs a week, exactly the shop's actual output. Templating, at 0.8 effective hours per job, could handle 62. Installation, at 25 jobs a week, is the next constraint after the CNC.
Defects That Pass Through the Constraint Twice
The quality analysis found edge chips on 6.0 percent of pieces, rising to 14.8 percent where dark quartz ran at the standard granite speed. Chipped pieces that must be remade go through the CNC a second time, so quality losses also consume constraint hours. The causes were a feed rate set for granite and bit changes tied to the calendar rather than to use.
Supporting Analyses
Three other analyses matter less to the claim but shape the plan. The inventory analysis showed that slab supply is not the problem: an order size of 33 slabs with a reorder point of 18 keeps the best-selling color in stock, and a quantity discount justifies ordering 60 once a second rack is installed. The forecast comparison found that a three-month moving average fits monthly demand better than exponential smoothing, but both run low in spring, so summer capacity should be planned above the forecast. The layout study measured 280 meters of material travel per job and found that moving the polishing benches next to the CNC would cut it to about 212 for $3,500.
Table 1
Findings and What Each Contributes to the Claim
| Analysis | Key figure | Contribution | |
|---|---|---|
| Process map | 9 to 22 hours waiting before the CNC | Shows where time is lost | |
| Capacity | Effective capacity 17 jobs a week; summer demand 17 to 18 | Shows why the queue grows in summer | |
| Bottleneck | CNC 3.3 hours per job, 15.2 jobs a week | Identifies the constraint | |
| Quality | 14.8 percent chips on dark quartz | Rework consumes constraint time | |
| Inventory | Order 33, reorder at 18; 60 with discount | Rules out slab supply as the cause | |
| Forecast | Moving average error 12 percent, biased low | Summer must be planned above forecast | |
| Layout | 280 meters per job; 212 after a partial move | Reduces handling near the constraint | |
Red River Stone & Surface and all figures are composite.
Recommendation
Make three changes, in this order.
First, stage the next slab and verify its program while the CNC is still cutting, using a part-time material handler and a second monitor, at about $22,000 a year. This targets the 0.6 hours per job lost to crane waits and program checks and should raise CNC capacity to about 18.5 jobs a week.
Second, give each stone type its own cutting speed in the machine's settings and replace bits by distance cut. This costs about $1,800 a year in bits and should cut chips on dark quartz from 14.8 percent toward the 3 percent seen on light quartz, freeing CNC time now spent on remakes.
Third, move the polishing benches to the west wall beside the CNC for about $3,500, reducing handling and the chance of cracking pieces between the CNC and polishing.
The order matters. Goldratt and Cox (2004) argued that improvement should start at the constraint and that gains elsewhere are illusory until the constraint is addressed. The first two changes work directly on the CNC. The third reduces handling after it. Templating changes, a second CNC and the full layout redesign should wait, because none raises output until the CNC's lost time is recovered.
Measures and Dates
Each month the shop will report three figures: CNC hours per job, with a target of 2.8 by March 2029; the dark quartz chip rate, with a target below 5 percent by February 2029; and average working days from templating to installation, with a target of ten or fewer through June 2029. If CNC hours per job fall but lead time does not, the next constraint, installation, should be examined.
Limits of the Analysis
The analyses rest on composite records and short histories: six months of production data, two weeks of timing and eighteen months of sales. Schmenner and Swink (1998) argued that operations performance improves as material moves through a process more swiftly and evenly; the evidence here supports that view for this shop, but the size of the gain should be confirmed by the measures above rather than assumed. Little (1961) showed that waiting time falls when work in process falls at a given output rate, so the count of jobs on carts in front of the CNC is the earliest sign of whether the plan is working.
References
Goldratt, E. M., & Cox, J. (2004). The goal: A process of ongoing improvement (3rd rev. ed.). North River Press.
Little, J. D. C. (1961). A proof for the queuing formula: L = λW. Operations Research, 9(3), 383-387. https://doi.org/10.1287/opre.9.3.383
Schmenner, R. W., & Swink, M. L. (1998). On theory in operations management. Journal of Operations Management, 17(1), 97-113. https://doi.org/10.1016/S0272-6963(98)00028-X
Reading the BUSI 3010 Week 11 instructions
The final assignment brings the term's analysis of one process into a single report. Open with a claim about the operation, then support it with the specific findings from earlier weeks: the process map, the capacity and constraint analysis, the quality findings, and any inventory, forecasting or layout work that bears on it. Earlier calculations should appear as evidence for the claim rather than as a summary of what was completed. The report should end with a recommendation, often a sequence of changes, along with the measures that will show success and the dates by which they should be reached. A brief section on limits is expected. Most sections set five to eight pages, and a summary table linking findings to the claim helps.
How the BUSI 3010 Week 11 example is put together
The report opens with the claim that the CNC, not templating, explains the fourteen-day lead time. Evidence sections follow: the process map's nine to twenty-two hours of waiting in front of the CNC, capacity figures showing summer demand above effective capacity, timing that confirms 15.2 jobs a week at the constraint and chipped dark quartz that sends pieces back through the CNC. A supporting section rules out slab supply, notes the forecast's low bias and cites the layout study. Seven rows of a summary table tie the findings to the claim. The recommendation sequences three changes, staging and program checks, feed rates and bit changes, and moving polishing benches, citing Goldratt and Cox. Measures with dates and a limits section citing Schmenner and Swink and Little close it.
Where the marks sit in the BUSI 3010 Week 11 rubric
The report is scored on integration. A tour of the term's assignments in order, without a claim tying them together, earns far less than a report that uses selected findings as evidence. Graders look for a clear claim near the start and for each section to show how its finding supports or qualifies it. Findings that do not bear on the claim should be brief or left out. Recommendations ought to grow out of the evidence, and when changes depend on each other, their order needs a reason. Measures need targets and dates. Accuracy matters: figures repeated from earlier weeks must match. A limits section that acknowledges short histories or composite data shows maturity. Readings should support the logic of the recommendation, such as starting at the constraint.
Common BUSI 3010 Week 11 mistakes, and how to avoid them
Write your claim in one or two sentences before drafting anything else. Then go through every earlier assignment and ask what each finding says about that claim; keep the ones that support or challenge it and set aside the rest. Order the evidence so the strongest comes first. Turn your earlier improvement ideas into a sequence and explain why the order matters. Set measures with dates. Check every number against your earlier work. Weak reports summarize each week in turn, leave the claim implicit or recommend everything at once. Others introduce new analysis at the last minute. A summary table linking findings to the claim helps both you and the grader. If you need a model operations report for a process you studied this term, share your earlier findings.
Get a BUSI 3010 Week 11 example written to your instructions
Send the Week 11 prompt, the rubric, and the earlier analysis from the term, and a BUSI 3010 report built on that material returns inside 24-48 hours, first sample free. A closing report is assembled out of real work. What arrives draws on the material you send and introduces no finding that was never studied.
More BUSI 3010 papers and BS in Business Administration samples
- BUSI 3010 Week 1: Real Operation Discussion Post
- BUSI 3010 Week 2: Swimlane Process Map
- BUSI 3010 Week 3: CNC Capacity Calculation
- BUSI 3010 Week 4: Bottleneck Analysis
- BUSI 3010 Week 5: Calculation Check Peer Replies
- BUSI 3010 Week 6: Quality Defect Memo
- BUSI 3010 Week 7: EOQ and Reorder Point Analysis
- BUSI 3010 Week 8: Forecast Method Comparison
- BUSI 3010 Week 9: Shop Floor Layout Proposal
- BUSI 3010 Week 10: Process Improvement Proposal
BUSI 3010 Week 11 questions, answered
Where can I find a free BUSI 3010 Week 11 sample paper?
The complete operations report on the stone fabrication shop, findings table and recommendation included, is free on this page.
What is the claim of the BUSI 3010 Week 11 report?
That lead time slipped from ten to fourteen working days because the CNC is the constraint and loses time to avoidable setup and rework.
Which findings support the claim?
The wait in front of the CNC, capacity below summer demand, a measured throughput of 15.2 jobs and chips that send pieces back through the CNC.
What does the report recommend?
Three changes in order: staging and program checks at the CNC, material-specific feed rates with bit changes by footage, and moving the polishing benches.
How will success be measured?
By CNC hours per job, the dark quartz chip rate and working days from templating to installation, each with a target date.