Approve $86,000 by July 15 to Redraw Ridgeline's Thirty-One Routes With the Drivers and Run Them on Route-Planning Software: A Persuasive Proposal That Starts With the Ask and Answers the 2019 Objection Before It Is Raised
Student Name
Walden University
WMBA 6695: Communication for Leaders and Managers
Instructor Name
Month Day, Year
Approve $86,000 by July 15 to Redraw Ridgeline's Thirty-One Routes With the Drivers and Run Them on Route-Planning Software: A Persuasive Proposal That Starts With the Ask and Answers the 2019 Objection Before It Is Raised
The Decision Requested
I ask the president to approve $86,000 in first-year spending, at the July 15 budget review, to redraw Ridgeline Uniform Services' thirty-one delivery routes with the drivers who run them and to schedule the redrawn routes on route-planning software from August 4. On approval, the route supervisors and I begin driver ride-alongs the following week, and every route is running on its new sequence by September 12, before the restaurant season and the October hospital contract renewals.
The spending covers a software subscription of $38,000 a year, setup and data cleanup of $22,000 and $26,000 for the drivers' and supervisors' time on the redesign. After the first year, the cost is the $38,000 subscription.
If the request is not approved, route overtime continues near last year's level of 9,860 hours, about $340,000, and the seven longest routes keep running past ten hours a day.
The Problem in Our Own Numbers
Every figure below comes from the weekly route profit and loss report.
Table 1
Route Workload From the Weekly Route Report, Last Twelve Months
| Measure | Figure | |
|---|---|
| Driver overtime hours | 9,860 (roughly $340,000 in overtime pay) | |
| Routes averaging more than ten hours a day | 7 of 31 | |
| Routes averaging under eight hours a day | 6 of 31 | |
| Longest average route day | 11.4 hours, Route 22 | |
| Shortest average route day | 7.1 hours, Route 9 | |
| Average miles per route day | 142 miles | |
| Stops delivered after the customer's window | 3.8 percent | |
Ridgeline Uniform Services and its figures are composite.
The table shows a balance problem more than a volume problem. The company does not have too much work for thirty-one routes; it has work divided unevenly among them. Route 22 runs four hours longer than Route 9 every day, and most overtime comes from the seven longest routes. Those routes grew one customer at a time over a decade, as new accounts were added to whichever driver was nearest when the sale closed. Nobody designed the current routes; they accumulated.
The late-delivery figure matters for revenue as well as cost. Late deliveries appear in the lost-customer list as a reason for leaving in four of the eleven restaurant accounts that left last year.
What We Propose
The proposal has two parts, in this order. First, the routes are redrawn with the drivers. Each route supervisor rides with each of their drivers for one day in August, marking stops that are hard to service, customer time windows and the sequence the driver actually uses. The supervisors and I then rebalance stops among neighboring routes so that no route averages more than nine and a half hours, and each driver keeps all but at most four of today's stops. Drivers review the draft of their own route before it is final, and pay stays whole during the transition.
Second, the redrawn routes are scheduled on route-planning software, which sequences each day's stops and adjusts for added or canceled stops. Route-planning methods have been studied for half a century, and Laporte (2009) traces how the algorithms behind such tools became capable of handling realistic problems. The software is not the new idea here. The new idea is redrawing the routes with the drivers first.
The 2019 Trial, and What Is Different
In 2019 Ridgeline licensed a routing program for three months. The program generated new sequences, the drivers kept their own and the license was dropped after one quarter. That trial cost money and goodwill, and a reasonable reader would expect the same result again.
Two things are different. In 2019, the program was given the old routes and asked to sequence them; the imbalance between routes was never addressed, so drivers on long routes saw no relief. In 2019, the sequences came from the program and were handed to drivers; drivers had good reasons for their own order, such as a hospital loading dock that is only open before seven, which the program did not know. This time the drivers' knowledge goes into the routes before the software is used, and drivers review their own routes before they take effect.
O'Keefe (1999) found that persuasive messages which raise an opposing argument and then refute it outperform messages that ignore it, while messages that raise the argument without refuting it do worse. Allen (1991) reached a similar conclusion. The 2019 trial is therefore named here rather than left for the reader to supply.
What It Costs and What It Should Return
Table 2
First-Year Cost and Expected Return
| Item | Low estimate | High estimate | |
|---|---|---|
| First-year cost | $86,000 | $86,000 | |
| Overtime reduction, 20 to 35 percent | $68,000 | $119,000 | |
| Fuel reduction, 6 to 10 percent of miles | $28,000 | $46,000 | |
| Net first-year result | $10,000 | $79,000 | |
Fuel savings assume about 1.1 million route miles a year at nine miles per gallon and $3.80 per gallon.
The estimate is a range because the actual saving depends on how much rebalancing the drivers' reviews allow. Even at the low end, the project pays for itself in the first year, and the second year costs only the subscription. The estimate does not count retained restaurant accounts, which would add to the return.
How We Will Know, and When to Stop
The proposal includes a stopping rule. After ninety days, if overtime on the seven longest routes has not fallen by at least 10 percent compared with the same weeks last year, I will recommend ending the subscription at the first renewal date, which the vendor has agreed to set at twelve months with a ninety-day notice. The redrawn routes would stay, because they cost nothing to keep. I will report overtime by route in the weekly route report, so the president sees the result in the same place he sees the problem.
The Drivers' View
I have discussed the plan with the three most senior drivers. Two support it, and one, who runs Route 4, opposes any change to his stops; his route averages 8.6 hours and would change only slightly. The president will likely speak to all three, and their views are stated here so nothing he hears comes as a surprise.
Decision
I request approval of $86,000 at the July 15 budget review, with work starting August 4 and the ninety-day review on November 3.
References
Allen, M. (1991). Meta-analysis comparing the persuasiveness of one-sided and two-sided messages. Western Journal of Speech Communication, 55(4), 390-404. https://doi.org/10.1080/10570319109374395
Laporte, G. (2009). Fifty years of vehicle routing. Transportation Science, 43(4), 408-416. https://doi.org/10.1287/trsc.1090.0301
O'Keefe, D. J. (1999). How to handle opposing arguments in persuasive messages: A meta-analytic review of the effects of one-sided and two-sided messages. Annals of the International Communication Association, 22(1), 209-249. https://doi.org/10.1080/23808985.1999.11678963
Reading the WMBA 6695 Week 6 instructions
Week 6 asks students to write a proposal addressed to someone with the authority to say no. The decision requested belongs on the first page with an amount, a date, the approver and what happens on approval. Evidence should come from sources the approver already trusts, often the organization's own reports, with outside research used to explain why the solution should work. The proposal must name the objection that reader would actually raise and answer it, and conceding a genuine limitation early tends to make the rest more credible. Costs and expected returns are usually shown in a table, with a range where certainty is not possible. A stated way of judging success, and of stopping if it fails, completes most strong proposals. Expect a document of four to six APA-formatted pages.
How this WMBA 6695 Week 6 example is built
The proposal opens with a decision section: approval of $86,000 at the July 15 review, work starting August 4, all routes changed by September 12, and the overtime cost of doing nothing. A table drawn from the weekly route report shows the imbalance between routes, and a paragraph explains that the routes accumulated rather than being designed. The proposal section puts route redesign with drivers before software, citing Laporte on routing methods. The 2019 section admits the earlier failure, then gives two reasons this attempt differs, with O'Keefe and Allen on two-sided messages. A cost table shows a first-year net of $10,000 to $79,000. A stopping rule ties renewal to a 10 percent overtime drop on the longest routes. The senior drivers' views, including one objection, close the case.
WMBA 6695 Week 6 rubric: what earns full marks
Approval-ready proposals score highest. A grader looks for the request on page one, worded so the approver could say yes or no after reading that page alone. Evidence is weighed by its fit with the audience: the approver's own figures carry more weight than general statistics. The counterargument section is judged on whether it addresses the refusal the reader would really send, not a convenient straw man, and whether the concession is real. Cost and return should be transparent, with assumptions stated. A plan for measuring success, including a point at which the writer would recommend stopping, signals honesty and often lifts a proposal into the top band. Readings should support the mechanism or the persuasive strategy, not decorate the introduction.
Common WMBA 6695 Week 6 mistakes, and how to avoid them
Write the ask first, in one or two sentences, and test it by asking whether the approver could say yes to exactly that. Gather evidence from the reports your reader already reads. Then write the refusal you fear most, as an email from the approver, and answer it directly in the proposal. Concede what is true about past failures or costs before making your strongest point. Weak proposals build slowly to a request on the last page, rely on outside statistics the reader may dispute or answer an objection nobody would raise. Others promise one precise saving with no range. Add a stopping rule; it reassures more than optimism does. If you would like a model proposal for a decision you need approved, describe the request, the approver and the numbers you have.
Get a WMBA 6695 Week 6 example written to your instructions
Hand over the Week 6 prompt, the rubric and the scenario or workplace situation, and a full proposal arrives within 24 to 48 hours, without a fee the first time. Saying who holds the approval and what they usually refuse changes the counterargument section more than any other detail supplied.
More WMBA 6695 papers and MBA samples
- WMBA 6695 Week 1: Misfired Message Discussion Post
- WMBA 6695 Week 2: Single-Reader Audience Analysis
- WMBA 6695 Week 3: Routine Change Informative Memo
- WMBA 6695 Week 4: Bad News Letter to a Customer
- WMBA 6695 Week 5: Rewritten Opening Peer Replies
- WMBA 6695 Week 7: Talking Points for a Leader
- WMBA 6695 Week 8: Ninety-Day Review Slide Deck
- WMBA 6695 Week 9: Crisis Statement and Matrix
- WMBA 6695 Week 10: Failed Notice Case Analysis
- WMBA 6695 Week 11: Change Communication Plan
- WMBA 6633 Week 6: Coaching Questions Practice
- WMBA 6627 Week 6: Workplace Conflict Case Analysis
- WMBA 6623 Week 6: Quantitative Risk Analysis
- WMBA 6620 Week 6: Bottom-Up Project Cost Estimate
WMBA 6695 Week 6 questions, answered
Where can I find a free WMBA 6695 Week 6 sample paper?
The whole route redesign proposal, tables and stopping rule included, sits below the facts table on this page and is free.
What does the WMBA 6695 Week 6 proposal ask for?
Approval of $86,000 in first-year spending to redraw thirty-one delivery routes with the drivers and schedule them on route-planning software.
Where does the evidence come from?
From the company's weekly route profit and loss report, which the president reads every Monday, so the figures arrive without an argument about method.
How does the proposal handle the failed 2019 trial?
It names the trial before the reader can, admits it failed, and explains that this time routes are redrawn with drivers before any software is used.
What is the stopping rule?
If overtime on the seven longest routes has not fallen at least 10 percent after ninety days, the writer will recommend ending the subscription.