MBAX 6990 Week 8 Staged Implementation Plan Example

Capstone: Sustainable Business Practice and Strategies Walden University Free custom sample in 24 to 48h

This MBAX 6990 Week 8 implementation plan example turns a craft brewery's sustainability recommendation into twelve quarters of work in four stages, each carrying an owner, a deadline and a gate. Walden MBAX 6990 asks for roles, dates and money, so the plan orders stages by dependency and cash: rinse-water recovery first, a taproom and home-state bottle pilot second, Massachusetts accounts third and Vermont fourth, with New Hampshire left in single-use glass. Each gate tests trips per bottle at rising scale, set at six to leave margin above break-even. A table gives every workstream one owner, from the head brewer for the recovery skid to the operations analyst for tracking data, following Kotter's point about owning early wins. A quarterly report tracks the same five figures. Risk responses complete the plan, a staple of Master of Business Administration (MBA) capstones.

CourseMBAX 6990 Capstone: Sustainable Business Practice and Strategies
WeekWeek 8
Paper typeImplementation plan
LengthAbout 870 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for MBAX 6990 Week 8

1

Twelve Quarters, Four Stages: An Implementation Plan for Quarry Hill Brewing That Gives Every Step One Owner, Orders the Work by Dependency and Cash and Sets the Gate the Bottle Program Must Pass

Student Name

Walden University

MBAX 6990: Capstone: Sustainable Business Practice and Strategies

Instructor Name

Month Day, Year

What this page is doingThe title states the plan's length and structure and names its two organizing rules: one owner per step and a gate before expansion.
2

Twelve Quarters, Four Stages: An Implementation Plan for Quarry Hill Brewing That Gives Every Step One Owner, Orders the Work by Dependency and Cash and Sets the Gate the Bottle Program Must Pass

From Recommendation to Plan

A recommendation becomes a plan once roles, dates and money are attached. This plan carries the capstone's recommendation for Quarry Hill Brewing, a composite brewery of about 28,000 barrels a year in western Massachusetts, across twelve quarters in four stages. Order follows dependency and cash: each stage starts only after the one before has delivered, and early savings help fund what follows. All figures are illustrative.

What this page is doingThe plan opens by stating its ordering rule, which every later choice follows.
3

The Four Stages

Table 1

Implementation Stages and Gates, Illustrative

StageQuartersWorkGate to the next stage |
1. Rinse-water recovery1 to 3Select vendor, install recovery skid, train brewers, verify savingsWater use down at least 20 percent for two consecutive months |
2. Taproom and home-state pilot3 to 6Lease a used washer, buy returnable bottle stock, sign up about 40 accounts, track every bottleAverage of six or more trips per bottle projected from return and breakage data; distributor handling time acceptable |
3. Massachusetts accounts7 to 9Buy a new washer, convert the bottling line, extend returns to all Massachusetts retailersReturn rate and breakage within pilot ranges at three times the volume |
4. Vermont accounts10 to 12Add Vermont retailers through the existing distributorProgram-wide trips per bottle at or above six |

Composite organization. New Hampshire remains in single-use glass throughout.

Why This Order

Rinse-water recovery goes first because it is cheap, quick to pay back and entirely within the brewery's control, and its savings, about $45,000 a year, help fund the pilot. It also gives the maintenance team experience with water systems before a bottle washer arrives. That sequence follows the logic of Hart (1995), in which capabilities built through pollution prevention support later product stewardship. The pilot starts in the taproom, where the brewery controls returns directly, and in home-state accounts close to the brewery, where problems can be spotted quickly. Massachusetts comes before Vermont because its deposit system already handles beer bottles at retail and most sales are there. Each gate tests the single uncertainty the financial section identified, how many trips each bottle makes, at increasing scale.

What this page is doingThe plan explains its sequence by dependency and cash, so a reader can see why no stage can move earlier.
4

One Role per Row

Every step has one owner, never a group.

Assigning one owner to each row means that when a gate is reviewed, a specific person reports whether it was met. Kotter (1996) argued that change efforts fail when no one owns the short-term wins that build momentum; the rinse-water savings are the first such win, and the head brewer owns them.

Table 2

Owners of Each Workstream

WorkstreamOwnerFirst milestone |
Rinse-water recovery systemHead brewerVendor selected by end of quarter 1 |
Washer, bottle stock and line conversionPackaging managerUsed washer leased by quarter 3 |
Retailer and distributor agreementsSales directorForty pilot accounts signed by quarter 3 |
Bottle tracking and return dataOperations analystTracking system live at pilot start |
FinancingOwner and chief financial officerEquipment lease terms agreed by quarter 6 |
Customer communicationMarketing managerTaproom deposit signage by pilot start |

Composite organization.

What this page is doingA single owner per row makes each gate someone's responsibility to report.
5

Cash, a Loan and Upside

Stage 1 is paid from cash. Stage 2 uses an equipment lease of about $90,000 over two years, which limits the loss if the pilot fails. Stage 3 requires the main investment, about $1.1 million for a new washer and line conversion, financed through an equipment loan repaid from bottle savings; the financial section showed that at six or more trips the program's net present value is strongly positive. If the gates are met early, Vermont could begin sooner; if the pilot fails its gate, the plan stops after stage 2, and the brewery can reconsider a canning line.

How Progress Will Be Reported

The owners will meet with the brewery's leadership at the end of each quarter, and a one-page report will carry the same five figures every time: monthly water use per barrel of beer, the number of returnable bottles in circulation, the projected average trips per bottle based on returns and breakage so far, the cost per fill compared with single-use glass and the hours distributors report spending on empties. Keeping the figures identical from quarter to quarter lets leadership see trends rather than snapshots. When a stage reaches its gate, the operations analyst will prepare a short memo stating whether the gate was met, with the data, and the owner and chief financial officer will decide whether to proceed. Each decision goes on file with its reasons, leaving a trail that explains why the brewery expanded, paused or stopped.

Risks and Responses

Three risks have named responses. If distributors resist handling empties, the sales director will offer a per-case handling fee, already priced in the financial section. If breakage runs high, the packaging manager will test a heavier bottle or a different crate. If customers do not return bottles, the marketing manager will test a higher taproom deposit and in-store reminders. Elkington (1997) noted that sustainability programs must work commercially to last, and each response is designed to keep the program economic.

References

Elkington, J. (1997). Cannibals with forks: The triple bottom line of 21st century business. Capstone.

Hart, S. L. (1995). A natural-resource-based view of the firm. Academy of Management Review, 20(4), 986-1014. https://doi.org/10.2307/258963

Kotter, J. P. (1996). Leading change. Harvard Business School Press.

Reading the MBAX 6990 Week 8 instructions

Week 8 asks you to turn your recommendation into an implementation plan. Break the work into stages and order them by dependency and cash, explaining why no stage can move earlier. Give each stage a gate: a number to reach before moving on. Assign one owner to every workstream, never a group, with a first milestone. Explain how each stage is financed. Describe how progress will be reported and decisions recorded. Name the main risks and the planned response to each. About four pages with two tables is enough. Keep the reporting figures identical from quarter to quarter.

How the MBAX 6990 Week 8 example is put together

The plan opens with its ordering rule. A table lists four stages with quarters, work and gates. A section explains the sequence, citing Hart on building capabilities. A second table assigns six workstreams to single owners with first milestones, followed by a paragraph citing Kotter. A financing section moves from cash to a lease to a loan and explains what happens if the pilot fails. A reporting section names five figures tracked each quarter and how gate decisions are recorded. A risks section pairs three risks with responses, citing Elkington. Each gate is phrased as a number someone could check. The plan states what happens if the pilot fails its gate, not only what happens if it passes. Owners are named by role, never by department.

MBAX 6990 Week 8 rubric: what earns full marks

Implementation plans earn credit for sequencing, accountability and realism. Stages ordered by dependency and cash, with the reasoning explained, show planning skill. Gates that are measurable and tied to the plan's main uncertainty are weighted heavily. Single owners for every workstream make accountability concrete. Financing should match each stage's risk, with smaller commitments before larger ones. A consistent reporting format and recorded decisions show governance. Named risks with specific responses complete the plan. Plans that list activities without owners, gates or money earn substantially less. Graders reward plans whose gates come straight from the financial section's uncertainty. A named person for every row is expected.

MBAX 6990 Week 8 help: mistakes that cost marks

Write each stage as a block of quarters, then ask what must be true before the next stage starts; that condition is your gate. Make each gate measurable. List the workstreams and give each to one person, with a first milestone date. Match money to risk: pay cash or lease for the uncertain early steps and borrow only once the uncertainty is resolved. Decide what you will report every quarter and keep it the same each time. List the likeliest failures and your response to each. Students often assign tasks to departments rather than people. If you want help designing stage gates, describe your plan's main uncertainty. Match money to risk. Record every gate decision.

Get a MBAX 6990 Week 8 example written to your instructions

Send the implementation plan prompt and rubric with your strategy and financial sections, which fix what must be sequenced and what it costs. A quarter-by-quarter chart with one owner per row, a funding table and a decision gate tied to your own thresholds arrive within 24 to 48 hours, free the first time. The head brewer and colleagues are roles in an imaginary firm.

More MBAX 6990 papers and MBA samples

MBAX 6990 Week 8 questions, answered

Where can I find a free MBAX 6990 Week 8 sample paper?

The staged implementation plan and its two tables are free to read on this page.

What are the four stages in the MBAX 6990 Week 8 plan?

Rinse-water recovery, a taproom and home-state pilot, Massachusetts accounts and then Vermont accounts.

What gate must the bottle program pass?

An average of six or more trips per bottle, measured in the pilot and confirmed at larger scale.

Who owns each step?

A single person per workstream, such as the head brewer for water recovery and the sales director for retailer agreements.

How is the plan financed?

Cash for water recovery, a two-year lease for the pilot washer and an equipment loan for the full program.