DBAX 9101 Week 3 Problem Evidence Paper Example

Business Research Project Stage 1 Walden University Free custom sample in 24 to 48h

This DBAX 9101 Week 3 problem evidence example sets aside twelve years of experience and asks what published research shows about late payment to small subcontractors. Walden DBAX 9101 requires evidence that stands without the author, so the paper gathers studies showing the problem exists, from Peters and colleagues, Arditi and Chotibhongs and Ramachandra and Rotimi, and studies showing it harms small firms. A table rates each source's strength. The strongest causal evidence comes from outside construction: Murfin and Njoroge on small suppliers cutting investment and Barrot on payment caps reducing small trucking firm failures. Three gaps are named, including the absence of research on what owners do. Petersen and Rajan support one belief from practice, another stays unsupported, and two local sources are proposed to firm up the picture. The result shapes what a Doctor of Business Administration (DBA) problem statement may claim.

CourseDBAX 9101 Business Research Project Stage 1
WeekWeek 3
Paper typeProblem evidence
LengthAbout 760 words, 5 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramDoctor of Business Administration (DBA)
UpdatedOctober 2026

Free sample paper for DBAX 9101 Week 3

1

Beyond What Twelve Years Taught Me: Assembling Published Evidence That Late Payment Harms Small Specialty Subcontractors, and Separating What the Research Shows From What Practice Only Suggests

Student Name

Walden University

DBAX 9101: Business Research Project Stage 1

Instructor Name

Month Day, Year

What this page is doingThe title sets the author's experience aside on purpose, because the week asks for evidence that stands without it.
2

Beyond What Twelve Years Taught Me: Assembling Published Evidence That Late Payment Harms Small Specialty Subcontractors, and Separating What the Research Shows From What Practice Only Suggests

Experience Is Not Evidence Here

Twelve years as an estimator taught me that small subcontractors wait too long to be paid. None of those years counts as evidence in a doctoral study. A committee will ask whether the problem exists beyond one firm in central Ohio, whether it harms firms in ways that can be described and whether anyone has studied it. This paper gathers the published evidence on each question and marks where the evidence stops.

What this page is doingThe paper begins by setting aside the author's experience, which is the step the week is built around.
3

Evidence That the Problem Exists

Peters et al. (2019) reviewed late payment and nonpayment in U.S. construction and described it as widespread, with causes ranging from owners' funding problems to contract clauses that let general contractors withhold payment until they themselves are paid. Arditi and Chotibhongs (2005) surveyed general contractors and subcontractors in the United States and found that payment practices, including slow payment and retainage, were among the most frequently cited problems in their relationships. Ramachandra and Rotimi (2015) found a similar pattern in New Zealand, where payment problems began with clients and moved down the contracting chain. Across countries and methods, the problem appears to be common.

Evidence That It Causes Harm

Table 1

Published Evidence of Harm From Late Payment

SourceSettingFindingStrength for this study |
Murfin and Njoroge (2015)U.S. suppliers to large firmsSmall suppliers paid slowly by large customers reduced their own investmentStrong design; not construction-specific |
Barrot (2016)French trucking firmsA reform capping payment terms reduced small firms' default risk and increased entryStrong design; shows payment terms affect survival; different industry |
Peters et al. (2019)U.S. constructionLate payment strains subcontractors' cash flow and can lead to failureReview; describes harm without measuring it |
Arditi and Chotibhongs (2005)U.S. constructionPayment issues among top sources of frictionSurvey of perceptions |

Strength judged by design and closeness to small specialty subcontractors.

What the Evidence Shows

The strongest evidence of harm comes from outside construction. Murfin and Njoroge (2015) showed that when large firms pay slowly, small suppliers effectively lend to them and cut their own investment. Barrot (2016), using a reform that capped payment terms in French trucking, found that shorter terms reduced the chance that small firms would fail. Both studies use designs that support causal claims, and both concern small firms dependent on larger customers, which resembles the position of small subcontractors. The construction-specific evidence is descriptive: reviews and surveys show the problem is common and seen as harmful, but do not measure its effect on survival.

What this page is doingThe paper separates findings from strong designs from those that only describe, since a committee will weigh them differently.
4

What the Evidence Does Not Show

Three things are missing. First, no study I found measures how often small specialty subcontractors in the United States fail because of late payment. Second, the research describes the problem from the outside; it says little about what owners do to manage it. Third, the evidence does not show whether some small firms manage late payment better than others, which is the gap my study would address.

Where Practice Still Leads

Some of what I know from practice remains unsupported by published research. I believe that firms with strong banking relationships survive delays better, and Petersen and Rajan (1997) offer indirect support, finding that firms with more access to credit extend more trade credit. I also believe that some owners negotiate payment terms before signing, while others accept whatever is offered. I have no published evidence for that belief, and it will need to come from the study itself.

Evidence I Could Gather Early

Before the study begins, two sources could firm up the local picture. The regional contractors' association publishes an annual member survey that includes average days to payment, which would show whether central Ohio resembles the national descriptions. And with permission, a few owners could share anonymized accounts receivable aging reports, which record how long each invoice has been outstanding. Neither source would answer the research question on its own, but both would let the problem statement describe local conditions with figures rather than anecdotes.

Implications for the Problem Statement

The problem statement can claim, with published support, that late payment is common in construction and that slow payment harms small firms dependent on larger customers. It cannot claim, from published evidence alone, that owners lack strategies; that is what the study will examine. The general problem will rest on the literature, and the specific problem will be framed as the gap the study fills.

References

Arditi, D., & Chotibhongs, R. (2005). Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), 866-876. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:8(866)

Barrot, J.-N. (2016). Trade credit and industry dynamics: Evidence from trucking firms. Journal of Finance, 71(5), 1975-2016. https://doi.org/10.1111/jofi.12371

Murfin, J., & Njoroge, K. (2015). The implicit costs of trade credit borrowing by large firms. Review of Financial Studies, 28(1), 112-145. https://doi.org/10.1093/rfs/hhu051

Peters, E., Subar, K., & Martin, H. (2019). Late payment and nonpayment within the construction industry: Causes, effects, and solutions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(3), Article 04519013. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000314

Petersen, M. A., & Rajan, R. G. (1997). Trade credit: Theories and evidence. Review of Financial Studies, 10(3), 661-691. https://doi.org/10.1093/rfs/10.3.661

Ramachandra, T., & Rotimi, J. O. B. (2015). Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1), 43-55. https://doi.org/10.5130/AJCEB.v15i1.4214

What the DBAX 9101 Week 3 instructions ask for

Week 3 asks you to assemble published evidence for your business problem. Begin by explaining why your own experience does not count as evidence for a committee. Gather sources showing that the problem exists beyond one organization and sources showing that it causes harm. Present the harm evidence in a table that rates each source by design and closeness to your population. Explain what the strongest evidence shows and how near it comes to your setting. Name what the evidence does not show. Separate beliefs from practice that research supports from those it does not. Propose any local evidence you could gather early. Close by stating what your problem statement can and cannot claim on the basis of this evidence.

How the DBAX 9101 Week 3 example is put together

The paper opens by declaring that twelve years as an estimator count for nothing as evidence. A section cites three sources showing late payment is common across countries. A table rates four sources of harm evidence by setting, finding and strength. A section explains that the strongest designs, Murfin and Njoroge and Barrot, concern small firms outside construction. A section names three gaps. A section notes that Petersen and Rajan indirectly support the author's belief about banking relationships, while a belief about negotiating terms remains unsupported. A section proposes an association survey and aging reports. A closing section divides the general problem, supported by literature, from the specific problem, framed as the study's gap.

Where the marks sit in the DBAX 9101 Week 3 rubric

The central skill rewarded here is separating evidence from experience. Sources showing the problem exists beyond one firm are expected; sources showing harm, rated by design, carry more weight. Honest discussion of how close the strongest evidence comes to the author's population shows maturity. Naming what the evidence fails to show is valued, because it defines the study's contribution. Distinguishing supported from unsupported beliefs from practice demonstrates self-awareness. Proposing local evidence shows initiative. A closing statement on what the problem statement may claim ties the work forward. Papers that cite sources only for the topic's existence, treat surveys of opinion as proof of harm or rely on the author's anecdotes are scored below the expected level.

DBAX 9101 Week 3 help from the desk

Start by listing what you believe about your problem, then search for a published source behind each belief. Sort what you find into two piles: evidence that the problem exists and evidence that it causes harm. For harm, note the design; an experiment or natural experiment outranks a survey of opinions. Ask how close each study's setting is to yours. Beliefs that find no source are not wrong, but they cannot go in the problem statement; the study may test them. Many students cite articles that discuss a topic without showing it costs anyone anything. Others treat industry trade press as research. A short table rating sources keeps you honest, and our writers can help you sort and rate what you have found.

Get a DBAX 9101 Week 3 example written to your instructions

Send the Week 3 prompt with its rubric and a sentence describing the problem you carried out of Week 2. A claim-by-claim evidence matrix built around a different problem, sources typed and dated, is ready in 24-48h, and your first request is free. Every source in it can be looked up, though matching sources to your own problem remains your work.

More DBAX 9101 papers and DBA samples

DBAX 9101 Week 3 questions, answered

Where can I find a free DBAX 9101 Week 3 sample paper?

The evidence paper and its source-strength table are posted below, free of cost.

Why does the DBAX 9101 Week 3 paper set aside experience?

Because a committee needs evidence that the problem exists beyond one firm.

Where is the strongest evidence of harm?

In studies of small suppliers and small trucking firms outside construction.

What does the evidence not show?

What owners of small subcontractors do to manage late payment.

What can the problem statement claim?

That late payment is common and harms small firms dependent on larger customers.