A Regional Fleet Pool That Lasted Five Months: Reconstructing a Nine-Branch Equipment Rental Company's Failed Pooling Initiative and Arguing That the Missing Move Was a Bonus Plan Nobody Rewrote
Student Name
Walden University
WMBA 6882: Initiating and Managing Change
Instructor Name
Month Day, Year
A Regional Fleet Pool That Lasted Five Months: Reconstructing a Nine-Branch Equipment Rental Company's Failed Pooling Initiative and Arguing That the Missing Move Was a Bonus Plan Nobody Rewrote
What Happened, Without Interpretation
Summit Fork Equipment Rental, a composite company with nine branches across middle and east Tennessee, rents about 2,400 units of construction equipment: aerial lifts, skid steers, mini excavators, compaction equipment and generators. Until February 2025, each branch owned its own fleet. Branch managers decided which units to buy, which to send for repair and whom to rent to, and each manager's annual bonus was 12 percent of the branch's rental revenue above its target.
On February 3, 2025, the company pooled the fleet. All units became available to any branch through a central dispatch desk, and branch counters could reserve any unit within a sixty-mile radius. On June 30, 2025, the company reversed the change and returned each unit to its home branch. In those five months, the share of reservation requests turned away for lack of equipment barely moved, from 31 percent in the fourth quarter of 2024 to 29 percent in April 2025, and 38 percent of transfer requests between branches went unfilled.
The Trigger
A fleet review in the summer of 2024 found that three branches regularly turned away customers while other branches within an hour's drive had the same type of unit sitting idle. Time utilization across the fleet averaged 58 percent, against the company's own target of 65 percent. The review recommended pooling with central dispatch, and the board approved it in October 2024.
The Sequence
Table 1
Moves in the Pooling Initiative, October 2024 to June 2025
| Month | Move | Performed by | |
|---|---|---|
| October 2024 | Board approves regional pooling | Vice president of operations | |
| November 2024 | Dispatch software configured with all 2,400 units | Information technology and vendor | |
| December 2024 | Two central dispatchers hired | Human resources | |
| January 6, 2025 | Pooling announced to branch managers at the quarterly meeting | Vice president of operations | |
| No date | Branch manager bonus plan redesigned to credit units released to other branches | Not done | |
| January 2025 | Counter staff trained on the shared reservation screen | Dispatch lead | |
| January 20, 2025 | Memo asking managers to "think regionally" | Vice president of operations | |
| February 3, 2025 | Pool goes live | Dispatch | |
| No date | Review of first-month transfer data with branch managers | Not done | |
| June 30, 2025 | Pool reversed; units return to home branches | Chief executive officer | |
The company and its records are composite.
What the Data Showed During the Five Months
Within three weeks of going live, a status the dispatch system offered for units awaiting repair, "maintenance hold," began to spread. Across the fleet it covered about 4 percent of units before pooling, which matched the repair backlog. By March it covered 15 percent of units at three branches and stayed near 5 percent at the other six. A unit on hold could not be reserved by another branch. When dispatch later traced held units, 62 percent of them had been rented by their home branch within the same week the hold was placed. Dispatchers also logged forty-one cases in March in which another branch's customer was told no unit was available while the screen showed a matching unit on hold nearby. Those cases, more than any summary figure, persuaded the dispatch lead that repair was not the reason for most holds.
The three branches with the highest hold rates were also the three with the largest bonus exposure: their managers had earned the biggest bonuses in 2024 and stood to lose the most if their units earned revenue for other branches.
The Omitted Move
Several things could have been done better. The announcement came only four weeks before go-live, and nobody reviewed the first month's transfer data with the managers. But the move I argue was load-bearing is the one in the fifth row: rewriting the branch manager bonus so that a manager who released a unit to another branch was credited for the revenue it earned there.
The argument runs through dependency. Pooling only works if managers release units. Releasing a unit, under the old bonus, reduced the releasing manager's pay. Every other move in the sequence, the software, the dispatchers, the training, assumed managers would release units willingly. Kerr (1975) showed how organizations routinely pay for one behavior while asking for another and then express surprise at the behavior they paid for. Summit Fork asked for regional thinking in a January memo and kept paying for branch revenue.
The hold data support this reading. If managers had resisted pooling for operational reasons, such as distrust of how other branches treated equipment, the holds would have spread evenly across branches. They concentrated where bonus exposure was largest. And when the pool was reversed in July, hold rates fell back to about 5 percent within a month, which suggests the holds had little to do with repairs.
What Filled the Slot
The empty row was not left blank in practice. Its place was taken by the January 20 memo asking managers to think regionally. An appeal to shared purpose was used where a change in incentives was needed. Ford et al. (2008) put part of the blame for resistance on change agents themselves, whose choices and omissions shape the reaction they later call resistance. Here, the inaction was the bonus plan, and the resistance it produced was entirely rational.
How the Field Would Read It
In the force-field language Lewin (1947) introduced, the bonus was a restraining force that the pooling effort never reduced; the initiative added driving forces, such as software and dispatchers, without removing the force pulling the other way. A different sequence would have rewritten the bonus in December, before the announcement, and tested it for one quarter with the three highest-revenue branches. Pooling might still have struggled, but the reasons would have been operational ones the company could see and fix.
Conclusion
Summit Fork's initiative did not fail because managers disliked change. It failed because one move that every other move depended on was skipped, and a memo was sent in its place. When the company considers pooling again, the bonus plan should be the first document rewritten, not the last.
References
Ford, J. D., Ford, L. W., & D'Amelio, A. (2008). Resistance to change: The rest of the story. Academy of Management Review, 33(2), 362-377. https://doi.org/10.5465/amr.2008.31193235
Kerr, S. (1975). On the folly of rewarding A, while hoping for B. Academy of Management Journal, 18(4), 769-783. https://doi.org/10.2307/255378
Lewin, K. (1947). Frontiers in group dynamics: Concept, method and reality in social science; social equilibria and social change. Human Relations, 1(1), 5-41. https://doi.org/10.1177/001872674700100103
What the WMBA 6882 Week 2 instructions ask for
Week 2 asks for a failure case built as a reconstruction rather than a story. Begin with what happened, in dates, volumes and named systems, without interpretation, so a reader could check it. Explain the trigger: what the organization was doing before and why it decided to change. Then lay out the sequence of moves as a table with the month and who performed each, leaving visible gaps where expected moves did not happen. From those gaps, choose one omission and argue that the rest of the effort depended on it, using evidence from the case. Say what took its place. The readings should help explain the mechanism. Four to five pages with APA headings is the common expectation, and a short conclusion should state what would have to happen first if the organization tried again.
How this WMBA 6882 Week 2 example is built
The paper opens with Summit Fork's nine branches, its 2,400 units and the old bonus of 12 percent of branch revenue above target, then states the dates of pooling and reversal and two outcome figures. A trigger section reports idle units near turned-away customers and utilization of 58 percent against a 65 percent target. A ten-row table lists the moves from October 2024 to June 2025, with the bonus redesign and a first-month review marked as not done. A data section shows the maintenance hold status rising to 15 percent of fleet at three branches and dispatch logs of refused transfers. The argument ties the omission to the hold pattern, citing Kerr on rewarding one behavior while asking for another. Ford and colleagues and Lewin's force-field idea explain the memo that filled the slot.
Reading the WMBA 6882 Week 2 rubric
Graders reward a reconstruction they could verify. Opening pages that interpret before reporting lose marks, as do cases that blame general reluctance without locating a missing step. The sequence table carries much of the grade: each move needs a date and an owner, and the omissions must be visible against the moves around them. The central claim earns credit when it names one omission and shows, with case evidence, that other moves depended on it. Alternative explanations should be addressed; here the even-or-uneven spread of holds tests whether resistance was operational or financial. Readings should explain the mechanism rather than restate the conclusion. A paper that also identifies what occupied the empty slot, such as an exhortation in place of an incentive change, shows the deeper understanding this week looks for.
Common WMBA 6882 Week 2 mistakes, and how to avoid them
Gather the facts first: dates, volumes, systems, who did what. Write the opening section with no adjectives about success or failure. Build the move table before you decide what went wrong, and leave rows for moves you would have expected but cannot find. Then pick the omission that other moves depended on, not simply the one you dislike most, and look for data that would look different if your explanation were wrong. Weak cases list every mistake equally, rely on anecdotes about attitudes or skip the trigger section. Some never say what filled the gap. If you want a model failure case reconstructed from an initiative you witnessed, share the timeline and any figures you have, and a custom paper can be drafted.
Get a WMBA 6882 Week 2 example written to your instructions
Failure cases differ by page length and by whether a source minimum applies, so pass along the Week 2 instructions and the rubric attached to them; a drafted case returns within 24-48h and the first costs nothing. A public initiative is the default unless a workplace one is supplied, and confidential detail stays with whoever owns it.
More WMBA 6882 papers and MBA samples
- WMBA 6882 Week 1: Abandoned Initiative Post
- WMBA 6882 Week 3: Change Readiness Assessment Memo
- WMBA 6882 Week 4: Change Resistance Register
- WMBA 6882 Week 5: Contrarian Peer Replies
- WMBA 6882 Week 6: Kotter Model Application
- WMBA 6882 Week 7: Timed Change Announcement Sequence
- WMBA 6882 Week 8: Change Implementation Plan
- WMBA 6882 Week 9: District Manager Change Brief
- WMBA 6882 Week 10: Change Sustainment Plan
- WMBA 6882 Week 11: Change Proposal With Rebuttal
- WMBA 6695 Week 2: Single-Reader Audience Analysis
- WMBA 6633 Week 2: Coaching vs Mentoring Comparison
- WMBA 6627 Week 2: Stakeholder Identification Register
- WMBA 6623 Week 2: Project Risk Identification Table
WMBA 6882 Week 2 questions, answered
Where can I find a free WMBA 6882 Week 2 sample paper?
Read the full fleet-pooling case, including the sequence table and the hold data, on this page without any charge.
What initiative does the Week 2 case reconstruct?
A nine-branch equipment rental company's pooling of its fleet under central dispatch, live from February 3 to June 30, 2025.
Which move does the WMBA 6882 Week 2 paper say was omitted?
Rewriting the branch manager bonus so that releasing a unit to another branch no longer cost the releasing manager pay.
What evidence supports that claim?
Units placed on maintenance hold rose sharply only at the three branches with the largest bonus exposure, and most held units were rented by their home branch that week.
What filled the empty slot?
A memo asking managers to think regionally, an appeal used where a change in incentives was needed.