| Course | WMBA 6615 Building Organizational Culture: Leaders as Architects |
|---|---|
| Week | Week 4 |
| Paper type | Culture audit |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Master of Business Administration (MBA) |
| Updated | October 2026 |
Free sample paper for WMBA 6615 Week 4
A Competing Values Audit of Cedar Fork Engineering: Market Strong, Hierarchy Strong, Clan Weak and Adhocracy Nearly Absent, Each Rating Defended From a Policy, a Meeting or a Dashboard
Student Name
Walden University
WMBA 6615: Building Organizational Culture: Leaders as Architects
Instructor Name
Month Day, Year
A Competing Values Audit of Cedar Fork Engineering: Market Strong, Hierarchy Strong, Clan Weak and Adhocracy Nearly Absent, Each Rating Defended From a Policy, a Meeting or a Dashboard
The Model and the Method
This audit applies the competing values framework, which Cameron and Quinn (2011) developed to describe organizational cultures along two dimensions: whether an organization emphasizes flexibility or stability, and whether it focuses inward or outward. The two dimensions produce four culture types: clan, focused inward and flexible, valuing collaboration and development; adhocracy, focused outward and flexible, valuing innovation; market, focused outward and stable, valuing competition and results; and hierarchy, focused inward and stable, valuing control and efficiency.
The organization is Cedar Fork Engineering, a composite civil engineering firm of 340 people in six North Carolina offices, where I manage transportation projects. Evidence comes from documents I can access, meetings I attend and dashboards I use. Each dimension is rated strong, moderate, weak or absent, based on how much the firm's practices reinforce it.
Market: Competition and Results
What is tested: whether the firm organizes itself around winning work and hitting measurable targets.
Evidence. First, the utilization dashboard: every group's billable percentage is shown on monitors on each floor, updated daily, against a firm target of 82 percent. Second, the Monday staff meeting opens every week with signed backlog, the dollar value of contracts won but not yet performed. Third, the project manager bonus formula: 50 percent depends on project profit margin, 30 percent on new work won and 20 percent on client satisfaction.
Rating: strong. Every major routine, daily, weekly and annual, measures results against targets. The client satisfaction element shows an outward focus, but it is weighted lightly beside profit and new work, and it, too, is a scored target.
Hierarchy: Control and Efficiency
What is tested: whether the firm emphasizes procedures, approvals and predictable operations.
Evidence. First, the quality control manual requires a licensed engineer's review and stamp on every deliverable, with a checklist of 46 items for roadway plans. Second, contract approvals: any proposal above $250,000 needs a principal's signature, and above $1 million, the executive committee's. Third, the timesheet system, which rejects entries to projects without an approved budget and flags any project over 90 percent of budget for review.
Rating: strong. Much of this is required by the profession and by public clients, which demand licensed review and cost control. But the firm goes beyond requirements: the 90 percent budget flag triggers a meeting with the group leader, and project managers describe spending more time explaining variances than solving design problems.
Clan: Collaboration and Development
What is tested: whether the firm invests in its people, teamwork and a sense of belonging.
Evidence. First, the mentoring program: the handbook promises every new engineer a mentor within a month, but only 9 of 31 engineers hired in 2025 received one. Second, onboarding: new hires receive an eight-hour nonbillable code and are expected on a project by midweek. Third, the employee engagement survey, run every two years, last showed 48 percent agreeing that "my development is a priority here," and no action plan followed its release.
Rating: weak. Collaboration happens inside project teams, where engineers help each other under deadline pressure, and survey crews show strong loyalty to each other. But the firm's systems do not fund development: mentoring has no time code, onboarding is capped and survey results produce no visible response.
Adhocracy: Innovation and Risk-Taking
What is tested: whether the firm encourages new approaches, experiments and creative risk.
Evidence. First, the firm has no budget for research or internal development projects; all time must be charged to a client or to a capped overhead code. Second, design competitions, which once showcased innovative work, were dropped in 2020 to cut nonbillable time. Third, when a group in the Charlotte office proposed piloting new modeling software in 2025, the proposal required a business case showing payback within one year and was declined.
Rating: nearly absent. Innovation at Cedar Fork happens when a client requests and pays for it, as with the drone surveys the firm now offers because a state agency required them. The firm adopts new methods once they are paid for, but does not create space to try them.
The Profile and What It Predicts
Table 1
Competing Values Profile, Cedar Fork Engineering
| Dimension | Rating | Strongest evidence | |
|---|---|---|
| Market | Strong | Utilization dashboard, backlog-first meeting, profit-weighted bonus | |
| Hierarchy | Strong | Licensed review, approval thresholds, budget flags | |
| Clan | Weak | 9 of 31 new engineers mentored; eight-hour onboarding cap | |
| Adhocracy | Nearly absent | No development budget; competitions dropped; software pilot declined | |
Ratings are the author's judgment from the evidence listed; the firm is composite.
Cedar Fork's profile is weighted toward stability and results, the market and hierarchy quadrants. Hartnell et al. (2011) pooled studies that used the framework and found clan cultures tied most closely to how employees feel about their work, while market cultures tied more closely to operating and financial results. That fits what Cedar Fork shows: it is profitable and well controlled, and it struggles to keep young engineers, and about 18 percent of its engineers in their first five years walk out the door annually.
The profile also suggests where change is cheapest. Adding clan practices requires mainly time, which the firm can grant through its timesheet rules, while building an adhocracy dimension requires tolerance for projects that may fail, a larger cultural shift for a firm so focused on control. That difference should shape the order of any change plan.
Limits of the Audit
The audit relies on one employee's access and observation, mostly at headquarters. Cameron and Quinn (2011) recommend a survey instrument completed by many members, which would test whether others see the same profile. The ratings also simplify: survey crews show a strong clan culture within their own group, which the firm-wide rating hides. Schein and Schein (2017) warn that culture audits capture artifacts and espoused values more easily than underlying assumptions, and the assumption that seems to drive Cedar Fork, that only billable time has value, would need interviews to confirm.
References
Cameron, K. S., & Quinn, R. E. (2011). Diagnosing and changing organizational culture: Based on the competing values framework (3rd ed.). Jossey-Bass.
Hartnell, C. A., Ou, A. Y., & Kinicki, A. (2011). Organizational culture and organizational effectiveness: A meta-analytic investigation of the competing values framework's theoretical suppositions. Journal of Applied Psychology, 96(4), 677-694. https://doi.org/10.1037/a0021987
Schein, E. H., & Schein, P. A. (2017). Organizational culture and leadership (5th ed.). Wiley.
Reading the WMBA 6615 Week 4 instructions
The culture audit applies a recognized model to an organization and rates it on the model's dimensions. Instructors expect headings taken from the model itself, so a competing values audit carries four dimension headings while one built on Schein's levels carries three. Each section should open with a line stating what is being tested, present two or three pieces of documentary or observed evidence, such as a policy clause, a meeting cadence or a dashboard metric, and close with a rating and a sentence defending it. A summary of the overall profile and what it predicts usually follows. A limits section addresses the evidence base and the model's blind spots.
Inside the WMBA 6615 Week 4 example
The paper explains the competing values framework and its four culture types, then describes the evidence sources. The market section cites the utilization dashboard, the backlog-first meeting and the bonus formula and rates market strong. The hierarchy section cites licensed review, approval thresholds and budget flags and rates it strong. The clan section cites mentoring records, the onboarding cap and an ignored engagement survey and rates it weak. The adhocracy section cites the absence of a development budget, dropped competitions and a declined pilot and rates it nearly absent. A table summarizes the profile, and Hartnell and colleagues connect it to outcomes. A limits section notes the single observer and cites Schein and Schein. Margin comments flag the model headings and the ratings.
WMBA 6615 Week 4 rubric: what earns full marks
Graders reward an audit that follows the model's structure and supports each rating with specific evidence. Opening each section with what is tested, and closing with a defended rating, shows discipline. Evidence that is documentary or observed, rather than impressionistic, carries significant weight. A summary profile linked to research on outcomes demonstrates depth. A limits section that acknowledges the observer's position and the model's constraints shows maturity. Clear headings, a summary table and correct citations complete the expectations. Strong audits also note where a subgroup departs from the firm-wide rating, since a single score can hide important variation.
WMBA 6615 Week 4 help: mistakes that cost marks
Choose a model your course covers and use its dimensions as headings. For each dimension, write one line stating what you are testing, then gather two or three pieces of evidence you can point to, such as a document, a meeting or a metric. Decide a rating and write one sentence defending it. Students often lose marks by rating without evidence, by mixing dimensions or by relying on feelings about the workplace. Another common gap is skipping the limits of a single observer's view. Say what a survey of many members might show differently. If you would like a custom sample culture audit for your organization, send us the evidence you have gathered.
Get a WMBA 6615 Week 4 example written to your instructions
Send the audit prompt with the rubric, and say which culture model the section requires or whether that pick is open. A full audit with summary table, rated dimensions and methods note arrives in 24 to 48 hours, the first one free. Where a page ceiling applies, the evidence is trimmed and the ratings stay.
More WMBA 6615 papers and MBA samples
- WMBA 6615 Week 1: Culture First Impression Post
- WMBA 6615 Week 2: Culture Artifact Inventory
- WMBA 6615 Week 3: Espoused Values Comparison
- WMBA 6615 Week 5: Culture Interview Writeup
- WMBA 6615 Week 6: Culture Analysis Peer Replies
- WMBA 6615 Week 7: Field Crew Subculture Analysis
- WMBA 6615 Week 8: New Engineer Onboarding Design
- WMBA 6615 Week 9: Promotion Rule Reward Brief
- WMBA 6615 Week 10: Culture Investment Brief
- WMBA 6615 Week 11: Organizational Culture Change Plan
- WMBA 6620 Week 4: Work Breakdown Structure
- WMBA 6608 Week 4: Break-Even Decision Memo
- WMBA 6623 Week 4: Qualitative Risk Scoring Matrix
- WMBA 6605 Week 4: Personal Values Paper
WMBA 6615 Week 4 questions, answered
Where can I find a free WMBA 6615 Week 4 sample paper?
The competing values culture audit of a composite engineering firm is reproduced in full below.
Which model does the audit use?
Cameron and Quinn's competing values framework.
How is each dimension rated?
Market strong, hierarchy strong, clan weak and adhocracy nearly absent.
What evidence supports the market rating?
A daily utilization dashboard, a backlog-first weekly meeting and a profit-weighted bonus.
What does the profile predict?
Strong financial results but weaker commitment, consistent with high early-career attrition.