WMBA 6615 Week 11 Organizational Culture Change Plan Example

Building Organizational Culture: Leaders as Architects Walden University Free custom sample in 24 to 48h

This WMBA 6615 Week 11 organizational culture change plan example opens with a target state written as behavior, from every new engineer having a named mentor before day one to survey crew chiefs speaking at the Monday meeting. Four mechanisms follow in sequence, a development time code, a structured first week, leadership judgment before utilization in promotions and the field brought to the center, each with its change, owner by role, start point, cost and six-month evidence. Walden WMBA 6615 asks what stops, and the plan ends the onboarding cap, an unkept handbook promise and an unanswered survey. MBA students see Cameron and Quinn, Chatman and O'Reilly, O'Reilly and colleagues and Schein and Schein cited, with risks and two-year measures.

CourseWMBA 6615 Building Organizational Culture: Leaders as Architects
WeekWeek 11
Paper typeCulture plan
LengthAbout 1,350 words, 7 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for WMBA 6615 Week 11

1

A Culture Plan for Cedar Fork Engineering: Four Mechanisms in Sequence, From a Development Time Code to a Crew Chief at the Monday Meeting, What Stops to Make Room for Them and How Each Would Show at Six Months

Student Name

Walden University

WMBA 6615: Building Organizational Culture: Leaders as Architects

Instructor Name

Month Day, Year

What this page is doingThe title presents the plan as a sequence of mechanisms with a removal list and a six-month test, the structure the final assignment asks for.
2

A Culture Plan for Cedar Fork Engineering: Four Mechanisms in Sequence, From a Development Time Code to a Crew Chief at the Monday Meeting, What Stops to Make Room for Them and How Each Would Show at Six Months

The Target State

In two years, the following should be true at Cedar Fork Engineering, the composite firm whose culture this course has examined. Every new engineer has a named mentor before their first day, and mentors log their time to a code that does not count against them. Promotion committees write their judgment of each candidate's technical leadership before they look at utilization. A survey crew chief addresses the Monday meeting monthly, and design engineers spend a day in the field in their first week. Engineers propose new methods through a funded pilot process, and at least two pilots run each year.

These behaviors address the pattern this term's analysis found. Cedar Fork's culture rewards billable time and controls cost well, but it does not fund development, it keeps its field crews outside its center and it leaves almost no room for trying new approaches. The firm's competing values profile was strong in market and hierarchy, weak in clan and nearly absent in adhocracy (Cameron & Quinn, 2011). The plan does not aim to weaken the market and hierarchy strengths, which keep the firm profitable and its work safe. It aims to add the missing quadrants through mechanisms, not slogans.

What this page is doingThe target is written as behavior someone could observe, not as a value.
3

Why Mechanisms Rather Than Messages

Cedar Fork already publishes values that promise development and technical excellence. The values comparison showed that only the values tied to near-term revenue survive. Schein and Schein (2017) name a handful of primary embedding mechanisms, among them what leaders watch and measure, their reactions to crises and their choices about who is hired, rewarded and promoted. Chatman and O'Reilly (2016) argue that culture is best treated as shared norms reinforced by the organization. A new values statement would change nothing. Each mechanism below changes what is measured, rewarded or scheduled.

Mechanism 1: The Development Time Code

The change. Create a development code on the timesheet covering mentoring, design reviews held inside the firm, agency workshops and approved pilots, capped at 10 percent of an engineer's hours with group leader approval, and exclude it from both group utilization and individual promotion utilization.

Owner. The chief financial officer, because utilization calculations sit in finance.

Start. January 1, the start of the fiscal year, so that dashboards and targets reset cleanly.

Cost. The work is largely being done already, unbilled or at the expense of individual utilization. The new cost is the additional mentoring and reviews the code will encourage, estimated at about $161,000 a year in forgone billing for mentoring and perhaps $100,000 more for reviews and pilots.

Visible at six months. Development hours appear on the dashboard as a separate line; every new engineer hired since January has logged mentoring hours with a named mentor; group utilization targets are unchanged and met.

Mechanism 2: The Structured First Week

The change. Replace the current first week, a laptop, an eight-hour code and a project by Wednesday, with the five-day design: a mentor on day one, a field day alongside a survey crew, a quality review, open training on how the firm earns money and a first assignment by Friday.

Owner. Each group leader, with human resources maintaining the schedule template.

Start. The first new hire after the time code is in place, so that the week's nonbillable hours do not penalize the group.

Cost. About $2,900 per new engineer, roughly $90,000 a year at current hiring.

Visible at six months. All new engineers have completed the full week; 90-day survey answers show that newcomers know whom to ask about their work.

Mechanism 3: Leadership Judgment Before the Number

The change. Revise the promotion procedure so the committee writes a paragraph on each candidate's technical leadership, citing evidence such as mentoring, reviews and client recognition, before it reviews utilization. Promotion utilization is calculated on billable plus development hours.

Owner. The executive committee, which runs promotions.

Start. The 2027 promotion round, announced in advance so candidates know how they will be judged.

Cost. A few hours of committee time per round.

Visible at six months. The revised criteria are published, and engineers who mentor report, in a short survey, that mentoring no longer harms their prospects. The real test comes at the first promotion round, when at least one candidate with strong development work and moderate billable utilization should be judged on the whole record.

Mechanism 4: The Field in the Center

The change. Give a survey crew chief a standing monthly slot at the Monday meeting to report on field conditions, safety and redos, and add the crews' two measures, injuries and redos, to the firm's dashboard beside utilization. Speed up the field change request process so that a request can be approved by phone and recorded the same day.

Owner. The Raleigh office director, who chairs the Monday meeting, with the operations manager for the field change process.

Start. The second quarter, after the first two mechanisms are running, so that the change is not lost among others.

Cost. Ten minutes of a monthly meeting and a modest change to the project management system, estimated at $15,000.

Visible at six months. Crew chiefs have spoken at six meetings; redos and injuries appear on the dashboard; field change requests are filed on the day of the change rather than after it.

What Stops

Capacity for new practices has to come from somewhere. The plan ends four things. The eight-hour nonbillable onboarding cap ends, replaced by the first-week code. The handbook's mentoring promise is rewritten to describe what the firm actually does, because a written promise that is not kept teaches newcomers that written promises do not matter. The Monday meeting's opening item, backlog, moves to second place behind safety and field conditions, shortening the backlog discussion by about five minutes. And the biennial engagement survey stops until the firm commits to publishing an action plan within sixty days of each survey, since a survey with no response teaches employees that their views are collected and ignored.

What this page is doingThe removal section names what ends, because a new practice needs room that an old one is occupying.
4

The Sequence

The order matters. The time code comes first because every other mechanism depends on it: without it, the first week and mentoring lower group utilization, and group leaders will quietly undo them. The first week follows, once newcomers' time can be recorded without penalty. The promotion change comes next, timed to the next promotion round. The field mechanism comes last because it changes a long-standing ritual, and the firm should first see that the earlier changes do not hurt its numbers. O'Reilly et al. (2014) found that culture is shaped by those at the top and is linked to firm performance, which is why the sequence starts with changes leaders control directly and aligns the firm's design step by step rather than all at once.

Risks

The largest risk is that utilization falls and leaders reverse the plan. The development code is capped at 10 percent for that reason, and the plan should be judged on the firm's billable utilization, which should stay near its 82 percent target. A second risk is that group leaders comply on paper while continuing to signal that billable time is all that counts. The six-month survey questions are designed to detect that. A third risk is that the crews see the invitation to the Monday meeting as a gesture. Giving them a standing slot and putting their measures on the dashboard is meant to make the change structural rather than symbolic.

How the Plan Will Be Judged

At two years, the plan should show three results the firm already measures or can easily measure: early-career engineer attrition down from 18 percent to about 12 percent; median time to professional engineer licensure shortened; and at least two pilots of new methods completed, one of them adopted. If attrition does not fall after two years, the plan's theory, that development and connection keep young engineers, is wrong for Cedar Fork, and the firm should look elsewhere for the cause.

References

Cameron, K. S., & Quinn, R. E. (2011). Diagnosing and changing organizational culture: Based on the competing values framework (3rd ed.). Jossey-Bass.

Chatman, J. A., & O'Reilly, C. A. (2016). Paradigm lost: Reinvigorating the study of organizational culture. Research in Organizational Behavior, 36, 199-224. https://doi.org/10.1016/j.riob.2016.11.004

O'Reilly, C. A., Caldwell, D. F., Chatman, J. A., & Doerr, B. (2014). The promise and problems of organizational culture: CEO personality, culture, and firm performance. Group & Organization Management, 39(6), 595-625. https://doi.org/10.1177/1059601114550713

Schein, E. H., & Schein, P. A. (2017). Organizational culture and leadership (5th ed.). Wiley.

WMBA 6615 Week 11 instructions, in plain terms

The final culture plan asks students to design a sequence of changes that would move an organization toward a target culture. Instructors expect fifteen hundred to two thousand words organized around a sequence rather than a list. The plan opens with a short statement of the target state written as observable behavior, not as values. Three to five mechanisms follow, each with the change, the owner by role, the start point, the cost and how it would be visible six months in. A removal section names what stops, since new rituals need capacity. The plan closes with the sequencing logic, risks and the measures by which it will be judged.

Inside the WMBA 6615 Week 11 example

The plan states five target behaviors and links them to the earlier audit's profile, citing Cameron and Quinn. A section explains why mechanisms beat messages, citing Schein and Schein and Chatman and O'Reilly. Four mechanism sections each give the change, owner, start, cost and six-month evidence: the development code, the first week, the promotion procedure and the field crews' inclusion. A removal section ends the onboarding cap, rewrites the mentoring promise, reorders the meeting agenda and suspends the survey until it has a response plan. A sequence section explains the order, citing O'Reilly and colleagues. Risks and two-year measures close the plan. Margin comments flag the target state and the removal section. Each mechanism section follows the same five-part pattern so the plan can be compared at a glance.

WMBA 6615 Week 11 rubric: what earns full marks

Graders reward a target state written as behavior and a plan built on mechanisms that change what is measured, rewarded or scheduled. Each mechanism should carry an owner, a start point, a cost and visible evidence, which demonstrates feasibility. A removal section shows realism about capacity. Sequencing logic that explains dependencies between steps carries significant weight. Addressing risks and stating how the plan will be judged show accountability. Research support and integration of earlier assignments complete the expectations. Plans that show how earlier assignments shaped each mechanism demonstrate integration across the course.

WMBA 6615 Week 11 help from the desk

Write what people will be doing differently in two years, in terms someone could observe. Then choose three to five mechanisms that would produce those behaviors, and for each name the owner, start date, cost and six-month sign of progress. Decide what must stop to make room. Put the mechanisms in an order where each one makes the next possible. Students often lose marks by listing values or initiatives, by naming no owners or costs or by ignoring what must end. Plans also falter when they name no measure of success, so state how you will know. If you need a custom sample culture change plan for your organization, send us your earlier culture assignments.

Get a WMBA 6615 Week 11 example written to your instructions

The final prompt and its rubric start the work, plus the earlier weeks' findings where the plan is meant to build on them. A sequenced plan with owners, removals, risks and indicators returns within 24 to 48 hours, the first one free. Nothing drawn from an employer's internal documents is reconstructed at this desk.

More WMBA 6615 papers and MBA samples

WMBA 6615 Week 11 questions, answered

Where can I find a free WMBA 6615 Week 11 sample paper?

The organizational culture change plan is posted in full on this page.

How is the target state written?

As observable behaviors, such as mentors named before day one and crew chiefs speaking at the Monday meeting.

What are the four mechanisms?

A development time code, a structured first week, leadership judgment in promotions and the field brought to the center.

What stops?

The onboarding cap, the unkept mentoring promise, the backlog-first agenda and the unanswered engagement survey.

How will the plan be judged?

By early-career attrition, time to licensure and completed pilots of new methods.