Free sample paper for WMBA 6501 Week 4
Target $422, Walk Away Above $431, Alternative Near $437 Landed: A Negotiation Plan for a Fastener Distributor's Bolt Renewal, With the Supplier's Likely Limits Estimated in the Same Units
Student Name
Walden University
WMBA 6501: Conflict Management and Negotiation
Instructor Name
Month Day, Year
Target $422, Walk Away Above $431, Alternative Near $437 Landed: A Negotiation Plan for a Fastener Distributor's Bolt Renewal, With the Supplier's Likely Limits Estimated in the Same Units
The Negotiation in Numbers
Linden Fastener Supply, the fictional Michigan distributor whose renewal this course follows, buys about 6,500 thousand-piece units of structural bolts a year from Calumet Bolt Works, its main domestic supplier. The blended price last year was $412 per thousand. Calumet has opened the renewal with a 6 percent increase, to about $437, citing wire rod costs. Week 3 argued for an integrative approach that trades volume commitment, smoother monthly orders and faster payment for shorter lead times and a smaller increase. This plan sets the numbers Linden will carry into the room.
Each dollar per thousand is worth about $6,500 a year to Linden. The gap between Calumet's opening and last year's price is worth about $160,700 a year.
What Linden Wants
Linden's target is an increase of 2.5 percent, to about $422 per thousand, together with a two-week lead time on its top twenty part numbers. At that price the increase costs Linden about $67,000 a year. The target is ambitious but grounded: wire rod prices, according to Calumet's own explanation, rose about 9 percent, and wire rod is roughly a third of the cost of a finished bolt, which implies a cost increase of about 3 percent for Calumet. A 2.5 percent increase combined with the volume and payment concessions from Week 3 leaves Calumet better off than a 3 percent increase alone would.
What Linden Will Accept
Linden's reservation price, the worst deal it will accept, is an increase of 4.5 percent, about $431 per thousand, and only if the two-week lead time is included. Without the lead time, the reservation falls to 3.5 percent, about $426, because Linden would then have to keep holding the safety stock that the shorter lead time would release, worth about $18,000 a year in carrying cost.
What Linden Does If Talks Fail
Linden's best alternative to a negotiated agreement is to move part of its volume to an importer in Ohio that has quoted $428 per thousand delivered to its warehouse, plus about $9 in freight to Linden's second location, for an effective $437. The importer's lead time is six weeks and its quality record with Linden is short: two lots in the past year, one with a thread gauge rejection. Adjusting for the longer lead time and the risk of rejected lots, the alternative costs Linden roughly $440 to $445 per thousand in practice. Fisher et al. (2011) argued that knowing one's best alternative protects a negotiator from accepting a worse deal and from rejecting a better one, and here the alternative is clearly worse than any increase up to about 6 percent. That is useful to know and dangerous to reveal.
What Calumet Is Likely Carrying
Calumet's position can be estimated from what the case shows. Calumet's lines are only about four-fifths full, so losing Linden's volume would hurt more than it would in a tight market. Its other distributor customers pay roughly $425 per thousand for similar bolts, according to two of Linden's customers who buy from them. Its alternative to a deal with Linden is to sell the freed capacity to those distributors, probably at lower volume and with more selling cost.
Table 1
Estimated Positions, Dollars per Thousand Pieces
| Position | Linden | Calumet (estimated) | |
|---|---|---|
| Opening | About $418 (+1.5%) | About $437 (+6%) | |
| Target | About $422 (+2.5%) with two-week lead time | About $430 (+4.4%) | |
| Reservation | About $431 (+4.5%) with lead time; about $426 without | About $420 (+2%) | |
| Best alternative | Ohio importer, effective $440 to $445 after risk | Sell capacity to other distributors near $425, at lower volume | |
Calumet's figures are estimates from the case; the firms and figures are composite.
If the estimates are right, the zone of possible agreement runs from about $420, Calumet's estimated floor, to about $431, Linden's ceiling. Thompson (2020) describes this overlap between the parties' reservation points as the bargaining zone, and the negotiation's job is to settle as near Linden's target as possible while the integrative trades enlarge what both sides gain.
Opening Move
Linden should open first, at about $418, a 1.5 percent increase, paired with the volume commitment and payment terms. Galinsky and Mussweiler (2001) showed experimentally that whoever names the first number tends to draw the settlement toward it, though the pull shrank when the receiving side thought about the opener's alternatives or limits. Opening first with a figure supported by Calumet's own cost explanation sets the anchor before Calumet's 6 percent becomes the reference point.
Concession Plan
Linden will concede in decreasing steps, from $418 to about $421, then $423, then $424.50, signaling that it is approaching its limit, and will tie each step to a gain: the lead time first, then a cap on next year's increase. It will not move above $426 without the lead time.
Information to Gather in the Room
Several of the estimates above can be tested before Linden makes any concession. The purchasing manager will ask three questions early: which of Calumet's costs rose this year besides wire rod, which issues in the agreement matter most to Calumet this year and how full its heading and threading lines are expected to run next spring. The answers bear directly on Calumet's floor and on the value of the volume and order band offers. Fisher et al. (2011) treat this kind of questioning as the core of interest-based negotiation, and it costs nothing to ask. Linden will not disclose its own reservation price or the importer's effective cost in return, though it may confirm that it has a working alternative.
What Could Go Wrong
The plan's weakest estimate is Calumet's reservation price. If Calumet's costs rose more than its explanation suggests, its floor may be higher than $420, and the bargaining zone may be narrow. If Calumet holds above $431 with the lead time included, Linden should test a partial shift of volume to the Ohio importer on a trial basis rather than accept a price above its limit.
References
Fisher, R., Ury, W., & Patton, B. (2011). Getting to yes: Negotiating agreement without giving in (3rd ed.). Penguin Books.
Galinsky, A. D., & Mussweiler, T. (2001). First offers as anchors: The role of perspective-taking and negotiator focus. Journal of Personality and Social Psychology, 81(4), 657-669. https://doi.org/10.1037/0022-3514.81.4.657
Thompson, L. L. (2020). The mind and heart of the negotiator (7th ed.). Pearson.
What the WMBA 6501 Week 4 instructions ask for
The mid-term plan states what the writer's side wants, what it will accept, what it will do if talks collapse and what the other party is likely carrying into the room, in numbers wherever the case allows. Instructors expect a target, a reservation point and a best alternative for each side, with the other side's estimated from evidence in the case rather than guessed. A plan that converts everything into one unit lets the reader see the bargaining zone. Opening and concession strategy should follow from the numbers. Grounding the alternative in a real option, priced after risks, separates a usable plan from a wish list. A short section on the weakest estimate and what to do if it is wrong shows the plan was tested before the meeting.
How this WMBA 6501 Week 4 example is built
The plan opens with volume, last year's price and the supplier's opening, and converts the gap into annual dollars. Sections set the distributor's target, justified from the supplier's own cost explanation, and its reservation price with and without the lead time. The best alternative is priced after lead time and quality risk, citing Fisher and colleagues on knowing one's alternative. A section estimates the supplier's position from its capacity use and what other distributors pay. A table sets both sides' openings, targets, reservations and alternatives side by side, and the text draws the bargaining zone with Thompson. An opening move cites Galinsky and Mussweiler, a concession schedule follows, and a closing section names the weakest estimate. Margin comments flag the alternative, the estimated position and the opening.
WMBA 6501 Week 4 rubric: what earns full marks
Graders reward numbers for every element of the plan, on both sides, expressed in one unit. Estimating the other party's limits from evidence in the case, rather than assuming them, carries the most weight. Pricing the alternative after its risks shows realism about walking away. Drawing the bargaining zone and planning an opening and concessions consistent with it demonstrates strategic thinking. Citing research on anchoring or alternatives adds depth. Identifying the weakest estimate, and what to do if it is wrong, shows the plan anticipates surprises. Instructors also check internal consistency between targets, limits and concessions. A readable table and correctly formatted references finish the expectations.
WMBA 6501 Week 4 help from the desk
Choose one unit for every issue, ideally the one the parties will argue in. Set your target from evidence, your reservation point from your alternative and your alternative from a real option priced after its risks. Then do the same for the other side using everything the case reveals. Draw the zone where both sides' limits overlap. Plan who opens, at what figure and how you will concede. Students often lose marks by describing goals in adjectives, by leaving the other side's position blank or by quoting an alternative at face value. Another common gap is a concession plan that gives away the issue you value most. Name the estimate you trust least. If you would like a custom sample negotiation plan for a case you have been assigned, send us the case.
Get a WMBA 6501 Week 4 example written to your instructions
The planning document runs on scenario figures, so include the confidential instructions your section issued alongside the Week 4 brief and its marking sheet. A finished plan returns within 24 to 48 hours at no cost the first time. Say whether fixed headings are prescribed, because the sample is built to that structure.
More WMBA 6501 papers and MBA samples
- WMBA 6501 Week 1: Productive Conflict Verdict Post
- WMBA 6501 Week 2: Conflict Style Diagnosis
- WMBA 6501 Week 3: Integrative or Distributive Choice
- WMBA 6501 Week 5: Bargaining Power Analysis
- WMBA 6501 Week 6: Third-Party Referral Memo
- WMBA 6501 Week 7: Role-Play Negotiation Debrief
- WMBA 6501 Week 8: Handling Disagreement Synthesis
- WMBA 6602 Week 4: Site-Neutral Payment Trace
- WMBA 6401 Week 4: Recruiting Pipeline Memo
- WMBA 6201 Week 4: Rating Form Critique
- WMBA 6070 Week 4: Hurdle Rate Memo
WMBA 6501 Week 4 questions, answered
Where can I find a free WMBA 6501 Week 4 sample paper?
The complete bolt renewal negotiation plan, with both sides' limits, is reproduced below.
What is the distributor's target?
About $422 per thousand pieces, a 2.5 percent increase, with a two-week lead time.
What is its walk-away point?
About $431 with the shorter lead time, or about $426 without it.
What is its alternative?
An Ohio importer at an effective $440 to $445 once lead time and quality risk are counted.
Who should open first?
The distributor, at about $418, to anchor the talks before the 6 percent figure takes hold.