| Course | WMBA 6401 Human Resource Analytics |
|---|---|
| Week | Week 5 |
| Paper type | Survey readout |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Master of Business Administration (MBA) |
| Updated | October 2026 |
Free sample paper for WMBA 6401 Week 5
Ten Survey Items, Two to Act On by Monday: An Engagement Readout for a Library System That Ranks Low Scores Against Their Link to Intent to Stay and Spends Its Recommendations Where the Two Overlap
Student Name
Walden University
WMBA 6401: Human Resource Analytics
Instructor Name
Month Day, Year
Ten Survey Items, Two to Act On by Monday: An Engagement Readout for a Library System That Ranks Low Scores Against Their Link to Intent to Stay and Spends Its Recommendations Where the Two Overlap
The Survey and the Question
In September, Elk River County Library, the made-up county system in this course, surveyed all employees; 236 of about 310 responded, a 76 percent response rate. The survey asked forty items, and the standard report lists every one with its score. The management team does not need forty findings. It needs to know what to do on Monday. This readout ranks the items using two pieces of information for each: how poorly it scored and how strongly it is linked to something the library cares about, here employees' stated intention to stay another two years. Recommendations go where the two overlap.
Two Ways to Rank
Ranking by score alone directs attention to whatever people complain about most, which may not affect whether they stay. Ranking by link alone points to things that matter but may already be going well. The overlap identifies items that are both weak and consequential. Harter et al. (2002), in a meta-analysis across many organizations, found that engagement measured at the unit level was related to outcomes including turnover and customer satisfaction, which is why a link to intent to stay is a reasonable way to judge which items matter.
Table 1
Ten Items Ranked by Score and by Link to Intent to Stay
| Item | Percent favorable | Correlation with intent to stay | Score rank (lowest first) | Link rank (strongest first) | |
|---|---|---|---|---|
| My work schedule is posted far enough ahead to plan my life | 38% | 0.46 | 2 | 1 | |
| I feel safe leaving the building at closing | 49% | 0.35 | 4 | 2 | |
| My manager recognizes good work | 61% | 0.31 | 7 | 3 | |
| I have the training I need to do my job well | 55% | 0.28 | 5 | 4 | |
| I can see a path to advance here | 41% | 0.27 | 3 | 5 | |
| I have the equipment I need | 58% | 0.20 | 6 | 6 | |
| My pay is fair for the work I do | 34% | 0.18 | 1 | 7 | |
| Communication from administration is clear | 63% | 0.15 | 8 | 8 | |
| I am proud to work for the library | 84% | 0.14 | 10 | 9 | |
| My coworkers help each other | 79% | 0.12 | 9 | 10 | |
Correlations are between each item and the item "I expect to be working here in two years," across 236 respondents; all ten are drawn from the forty-item survey. Composite figures.
Where the Overlap Falls
Two items sit near the top of both rankings. Schedule notice scores second lowest and has the strongest link to intent to stay. Safety at closing scores fourth lowest and has the second strongest link. Both concern evening work, and both repeat what the turnover analysis in Week 3 found: assistants who work mostly evenings, with schedules changed at short notice, leave at twice the rate of others.
Two items are low but weakly linked. Pay fairness scores lowest of all, at 34 percent favorable, but its correlation with intent to stay is modest. That does not mean pay is unimportant; it means that, at Elk River, pay perceptions vary less with who plans to stay than schedule and safety perceptions do. Allen et al. (2010) noted that managers often overestimate the role of pay in turnover, and the survey supports that caution here. Advancement scores low and is moderately linked; it deserves attention in the workforce plan but not Monday's actions.
One item is well linked but already scores reasonably. Manager recognition is third in link but seventh in score, so most employees already feel recognized. Protecting it matters more than fixing it.
What to Do on Monday
Two recommendations follow from the overlap. First, adopt the scheduling rule proposed in Week 3: schedules posted three weeks ahead, with branch manager approval required for any change inside seven days. Second, address safety at closing at the four late branches: two staff members on duty at every closing, exterior lighting checked by facilities this month and a standing arrangement for staff to be escorted to their cars. Each can start inside a week and be read again in the March pulse survey.
The readout does not recommend action on pay before the county's next scale review, because the library cannot change the scale on its own and because the data suggest pay is not the main driver of intent to leave. It does recommend reporting the pay finding to the county board, since a score of 34 percent should not go unmentioned.
Sharing the Results With Staff
Employees who took the survey will want to know what it found and what will change. The readout recommends a short message from the director within two weeks, naming the two priority findings, schedule notice and safety at closing, the actions taken on each and the date of the March pulse survey. The message should also acknowledge the pay finding honestly: the library heard it, cannot change the county scale on its own and has reported it to the county board. Saying nothing about the lowest-scoring item would suggest it was ignored. Branch managers will discuss the results at their next staff meetings, using a one-page summary for their branch, so that evening staff hear directly that their concerns shaped the response.
Items Not Shown
Thirty of the forty items are not shown in the table. Most scored above 65 percent favorable and had weak links to intent to stay, so they would not change the recommendations. Two deserve mention. An item on workload during summer reading programs scored 44 percent but had a link of only 0.11, suggesting staff dislike the summer rush without planning to leave over it. An item on whether branch managers listen to suggestions scored 58 percent with a link of 0.24, close to the threshold for action; it should be watched in March.
Limits
Correlations do not prove causes. Employees who already plan to leave may rate everything lower, which would inflate all the links somewhat; the ranking among items is more reliable than any single correlation. Saks (2006) found that perceived organizational and supervisor support were among the antecedents of engagement, so the safety finding may also reflect how supported evening staff feel. A March pulse survey after the changes will test whether the overlap items improve and whether intent to stay follows.
References
Allen, D. G., Bryant, P. C., & Vardaman, J. M. (2010). Retaining talent: Replacing misconceptions with evidence-based strategies. Academy of Management Perspectives, 24(2), 48-64. https://doi.org/10.5465/amp.24.2.48
Harter, J. K., Schmidt, F. L., & Hayes, T. L. (2002). Business-unit-level relationship between employee satisfaction, employee engagement, and business outcomes: A meta-analysis. Journal of Applied Psychology, 87(2), 268-279. https://doi.org/10.1037/0021-9010.87.2.268
Saks, A. M. (2006). Antecedents and consequences of employee engagement. Journal of Managerial Psychology, 21(7), 600-619. https://doi.org/10.1108/02683940610690169
What the WMBA 6401 Week 5 instructions ask for
Survey analytics assignments supply engagement results and ask what a management team should do on Monday. Prompts reward readouts that rank findings rather than report all of them, setting the worst-scoring items beside those most strongly linked to an outcome the organization cares about and spending recommendations where the two overlap. Instructors expect a table with both rankings, a clear rule for choosing actions and an honest account of items that score badly but are not acted on. Students should note the limits of correlations from a single survey. Proposing a pulse survey to test whether the chosen actions moved the targeted items shows the readout is part of a cycle rather than a one-off report.
Inside the WMBA 6401 Week 5 example
The readout states the response rate and the question the team must answer. A section explains the two rankings and why their overlap matters, citing Harter and colleagues. A table ranks ten items by percent favorable and by correlation with intent to stay. A section identifies the overlap, schedule notice and safety at closing, and connects it to the turnover findings. It explains why pay, though lowest in score, is not first for action, citing Allen and colleagues, and why manager recognition needs protecting rather than fixing. Two Monday actions follow, with a note to report pay to the county. A limits section discusses correlation, rating bias among likely leavers and Saks on support. Margin comments flag the ranking rule, the overlap and the limits.
WMBA 6401 Week 5 rubric: what earns full marks
Graders reward readouts that rank findings with a stated rule rather than listing every item. Combining scores with links to an important outcome, and acting where they overlap, carries the most weight. Explaining why a low-scoring item is not acted on demonstrates judgment and honesty. Recommendations that can begin within days and be measured at a pulse survey show practicality. Acknowledging limits of single-survey correlations shows statistical maturity. Connecting survey findings to earlier analyses adds coherence. Instructors also check that the table and text agree. The item table and the written ranking must agree item for item. The two rankings should be explained before the overlap is used.
WMBA 6401 Week 5 help from the desk
Choose an outcome the organization cares about that the survey also measures, such as intent to stay. For each item, record its score and its correlation with that outcome. Rank items both ways and look for those near the top of both lists. Recommend actions only for those, and say why other low-scoring items wait. Students often lose marks by reporting every item, by acting on whatever scored lowest or by treating correlations as causes. Another frequent gap is actions too vague to start on Monday. Plan a short pulse survey to check the effect. If you need a custom sample readout of your organization's survey, send us the item scores and any outcome measure.
Get a WMBA 6401 Week 5 example written to your instructions
The survey exhibit is the one indispensable file, so it goes alongside the Week 5 brief and whatever standard your classroom published. A finished readout arrives in 24 to 48 hours, free to start. If a prior-year comparison sits in the data, include it, because the ranking changes once movement over time becomes visible.
More WMBA 6401 papers and MBA samples
- WMBA 6401 Week 1: Workforce Measure Boundary Post
- WMBA 6401 Week 2: Measurement Rationale
- WMBA 6401 Week 3: Turnover Table Breakdown
- WMBA 6401 Week 4: Recruiting Pipeline Memo
- WMBA 6401 Week 6: Pay Compression Analysis
- WMBA 6401 Week 7: Assistant Workforce Plan
- WMBA 6401 Week 8: Final Workforce Plan Reflection
- WMBA 6201 Week 5: Measure Collection Replies
- WMBA 6070 Week 5: Capital Project Memo
- WMBA 6060 Week 5: Product and Pricing Analysis
- WMBA 6050 Week 5: Flexible Budget Variance Report
WMBA 6401 Week 5 questions, answered
Where can I find a free WMBA 6401 Week 5 sample paper?
The engagement survey readout for a library system appears below in full.
How are the items ranked?
Twice, by percent favorable and by correlation with intent to stay two years.
Which items overlap?
Schedule notice and safety leaving the building at closing.
Why is pay not acted on first?
It scores lowest but has only a modest link to intent to stay, and the county controls the scale.
How will the actions be tested?
With a pulse survey in March checking the targeted items and intent to stay.