WMBA 6070 Week 7 Capital Budget Allocation Example

Managerial Finance Walden University Free custom sample in 24 to 48h

This WMBA 6070 Week 7 capital budget allocation example spends a $5 million ceiling at a composite crane company across four proposals: a telematics system, the 250-ton crane from Week 5, yard paving and a wind turbine maintenance venture. Each has a positive net present value, but together they cost $6.66 million. Walden WMBA 6070 asks students to rank, fund as many as the ceiling allows and stress the order, and the report checks every combination rather than relying on the profitability index alone. Telematics, the crane and paving produce about $713,000 of value and leave $1.54 million unspent. MBA students then see a stress test, rates two points higher and flat rental prices, under which the funded projects stay positive and the wind venture turns negative, plus conditions for revisiting it.

CourseWMBA 6070 Managerial Finance
WeekWeek 7
Paper typeCapital budget report
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Business Administration (MBA)
UpdatedOctober 2026

Free sample paper for WMBA 6070 Week 7

1

Spending a $5 Million Capital Budget on Four Proposals: Fund Telematics, the 250-Ton Crane and Yard Paving, Hold the Wind Venture, and Watch the Order Survive a Higher Rate and Flat Prices

Student Name

Walden University

WMBA 6070: Managerial Finance

Instructor Name

Month Day, Year

What this page is doingThe title gives the funded list, the deferred project and the stress test, which together are the report's answer.
2

Spending a $5 Million Capital Budget on Four Proposals: Fund Telematics, the 250-Ton Crane and Yard Paving, Hold the Wind Venture, and Watch the Order Survive a Higher Rate and Flat Prices

The Budget and the Proposals

Brightwater's owners, in this invented crane rental case, have set a capital budget of $5 million for the coming year, the most they are willing to commit given the acquisition financing approved in Week 6. Four proposals compete for it. This report ranks them, funds as many as the ceiling allows and tests whether the ranking holds when the discount rate and the growth assumption are pushed the unfavorable way.

Table 1

The Four Proposals at Their Base Cases

ProposalInvestmentDiscount rateNet present valueProfitability index |
Telematics and fleet management system$0.40 million10.5%$140,0001.35 |
250-ton all-terrain crane$2.46 million10.5%$478,0001.19 |
Paving the equipment yard$0.60 million10.5%$95,0001.16 |
Wind turbine maintenance venture$3.20 million13.0%$350,0001.11 |

The crane figures come from the Week 5 memo and the rates from Week 4; the other figures are the proposers' estimates, reviewed by finance. Composite figures.

What this page is doingThe constraint is stated before the proposals, because ranking only matters when money runs out.
3

Each proposal is worth doing on its own: every net present value is positive at its own discount rate. Together they would cost $6.66 million, so at least one must wait.

Ranking Under a Budget Limit

When capital is limited, the aim is to choose the set of projects with the greatest total net present value that fits within the budget. The profitability index, present value per dollar invested, is a useful guide because it shows which projects produce the most value for each scarce dollar, though it can mislead when projects are lumpy and leave money unspent (Brealey et al., 2023). The report therefore checks every combination that fits.

Table 2

Combinations That Fit the $5 Million Budget

CombinationTotal investmentTotal net present value |
Telematics, crane and paving$3.46 million$713,000 |
Telematics, wind venture and paving$4.20 million$585,000 |
Telematics and wind venture$3.60 million$490,000 |
Crane and wind venture$5.66 millionOver budget |

Composite figures.

What this page is doingChecking every combination, not only the index ranking, avoids the trap of lumpy projects.
4

Telematics, the crane and paving together produce the most value, about $713,000, and leave about $1.54 million unspent. The wind venture alone cannot be added without dropping the crane, and the combination with the wind venture produces less value even though it uses more of the budget. The unspent $1.54 million should not be forced into a weaker project; it can reduce the bank line or wait for next year.

The Stress Test

The ranking rests on two assumptions that could move against the firm: the cost of capital and the growth in rental rates. The stress test raises every discount rate by two percentage points and assumes rental rates stay flat for five years instead of rising about 2 percent a year.

Table 3

Net Present Value Under the Unfavorable Case

ProposalBase caseRate +2 points, flat rental rates |
Telematics$140,000About $95,000 |
250-ton crane$478,000About $120,000 |
Yard paving$95,000About $40,000 |
Wind venture$350,000About -$60,000 |

Stress values are estimates from each proposal's cash flow model; composite figures.

What this page is doingPushing both assumptions the unfavorable way shows which project's value was fragile.
5

The funded projects remain positive under stress, though the crane's margin shrinks sharply because its value depends heavily on rental income. The wind venture turns negative, because it is the most sensitive to both assumptions: its customers are few, its equipment is specialized and its revenue grows only if turbine construction does. The stress test therefore strengthens the decision to hold it.

Order of Spending

Telematics should come first, because it pays back fastest and its data on engine hours and idle time will improve the scheduling of every crane, including the new one. The crane comes second, timed for spring delivery. Paving comes third, in late summer when the yard is least busy.

The Wind Venture

Holding the wind venture is not rejecting it. Its base-case value is real, and the market may grow. The report recommends revisiting it next year with two pieces of evidence: a signed service agreement with at least one turbine operator, which would reduce customer risk, and a used specialized crane at a lower price, which would reduce the investment. Graham and Harvey (2001) found that many firms adjust for project risk informally rather than through separate rates; Brightwater's use of a higher rate for this venture made its weakness visible before money was committed.

What this page is doingHolding a project with conditions for revisiting it is more useful than a flat rejection.
6

What Happens to the Unspent $1.54 Million

The unspent budget should not sit idle, and it should not be pushed into a weaker project to use it up. The best use is to reduce the bank line of credit, which costs 7 percent. Paying down $1.54 million saves about $108,000 a year in interest and restores borrowing room for the next season, when the wind venture may return with better terms. If a project with a clearly positive value appears during the year, the line can be drawn again. In effect, the unspent money earns a safe 7 percent while the firm waits for a better use, a return that compares well with the riskier projects on the list.

How the Proposals Were Reviewed

Each proposal came from the manager who would run it, and finance reviewed each for three things: whether the cash flows followed the firm's standard assumptions on taxes and depreciation, whether the discount rate matched the project's risk and whether the sensitivity analysis tested the assumption most likely to be wrong. The wind venture's proposal used the firm's ordinary 10.5 percent rate; finance applied 13 percent, which reduced its value from about $560,000 to about $350,000 and changed its rank.

None of the four proposals was rejected for lack of value; the budget limit, not the analysis, forced the choice.

What the Owners Are Approving

The owners are asked to approve $3.46 million for telematics, the crane and paving, to keep $1.54 million uncommitted and to schedule a review of the wind venture next autumn. Ross et al. (2022) note that capital rationing imposed by owners is often a way of controlling growth and risk, and in this case the budget limit has done its job by forcing the riskiest project to prove itself first.

References

Brealey, R. A., Myers, S. C., & Allen, F. (2023). Principles of corporate finance (14th ed.). McGraw Hill.

Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7

Ross, S. A., Westerfield, R. W., Jaffe, J., & Jordan, B. D. (2022). Corporate finance (13th ed.). McGraw Hill.

The Walden WMBA 6070 Week 7 instructions

Capital rationing assignments in managerial finance usually bring the term's pieces together into one report that spends a fixed budget across competing proposals. Prompts require students to rank the proposals, fund as many as the ceiling allows and show what happens to the order when the discount rate and growth assumptions are pushed the unfavorable way. Instructors expect students to recognize the limits of the profitability index when projects are lumpy and to compare feasible combinations directly. Explaining what will happen to unspent funds, and under what conditions a deferred project would be reconsidered, shows judgment beyond the arithmetic and prepares the owners for next year's cycle.

How this WMBA 6070 Week 7 example is built

The report states the budget and why it is fixed. A table lists four proposals with investment, discount rate, net present value and profitability index. A section explains capital rationing and the limits of the index, citing Brealey and colleagues, and a second table compares combinations that fit the budget. The best combination is named and the unspent amount addressed. A stress test raises rates by two points and holds rental prices flat, and a third table shows each proposal's value under that case. A section orders spending through the year. A section explains holding the wind venture with conditions for revisiting it, citing Graham and Harvey on risk adjustment. The approval request closes with Ross and colleagues on owner-imposed capital limits. Margin comments flag the combination table, the stress test and the deferred project.

Where the marks sit in the WMBA 6070 Week 7 rubric

Graders reward a report that finds the combination with the most total value within the budget, rather than funding in index order without checking. Recognizing that lumpy projects can make the index misleading demonstrates understanding. The stress test carries significant weight: pushing both assumptions the unfavorable way and showing which projects survive tests the robustness of the plan. Explaining what happens to unspent funds, and setting conditions for revisiting a deferred project, shows practical judgment. Ordering the funded projects through the year adds realism. Instructors also check consistency with earlier weeks' figures. Clear tables and accurate references to finance research settle the remaining credit.

WMBA 6070 Week 7 help from the desk

List every proposal with its investment, discount rate and net present value, and compute the profitability index. Then list every combination that fits the budget and total its value; do not rely on the index alone. Choose the combination with the most value, even if it leaves money unspent. Push the discount rate and the growth assumption the unfavorable way and see which projects survive. Students often lose marks by forcing the whole budget into projects, by ranking only by internal rate of return or by skipping the stress test. Say what happens to unspent money and when a deferred project will be reconsidered. Keep figures consistent with earlier work. If you would like a custom sample capital budget report for your organization's proposals, send us their figures.

Get a WMBA 6070 Week 7 example written to your instructions

Upload the Week 7 instructions with the rubric and every proposal exhibit the case includes, plus the budget ceiling if it appears separately, and a finished report arrives in 24 to 48 hours, free the first time. Note the page ceiling that applies, because a report built for eight pages does not compress cleanly into five.

More WMBA 6070 papers and MBA samples

WMBA 6070 Week 7 questions, answered

Where can I find a free WMBA 6070 Week 7 sample paper?

The capital budget allocation report for a crane company appears in full below.

Which projects are funded?

The telematics system, the 250-ton crane and yard paving, for $3.46 million.

Why not the wind venture?

It cannot fit with the crane, its combination yields less value and it turns negative under stress.

What happens to the unspent $1.54 million?

It reduces the bank line or waits for next year rather than funding a weaker project.

What does the stress test change?

Rates two points higher and flat rental prices keep the funded projects positive but sink the wind venture.