This PUBH 6641 Week 6 stakeholder map example places ten parties that a two-neighborhood cream-testing effort relies on, from the state laboratory that lends the analyzer to the shop owners whose products may be tested, on a power and interest grid, then adds the column that makes the map useful: what cooperation would cost each. Walden PUBH 6641 asks students to identify the people their project needs, and the brief uses public-sector stakeholder analysis to show why a laboratory's cost is scheduling, a community association's is reputation and a shop owner's may be lost sales. It explains two changes the map makes to the plan, co-signed invitations and an early meeting with shop owners, and names parties deliberately left off. MPH students can see how a cost column turns a grid into a strategy.

CoursePUBH 6641 Applied Project in Public Health
WeekWeek 6
Paper typeStakeholder map brief
LengthAbout 760 words, 5 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Public Health (MPH)
UpdatedOctober 2026

Free sample paper for PUBH 6641 Week 6

1

Ten Parties and What Cooperation Would Cost Each: A Stakeholder Map Placing the People a Cream-Testing Program in Two Neighborhoods Depends On by Power and Interest, Then Adding the Column That Makes the Map Useful

Student Name

Walden University

PUBH 6641: Applied Project in Public Health

Instructor Name

Month Day, Year

What this page is doingThe title promises a column beyond power and interest, because knowing what cooperation would cost a party says more about how to approach it than its place on a grid.
2

Ten Parties and What Cooperation Would Cost Each: A Stakeholder Map Placing the People a Cream-Testing Program in Two Neighborhoods Depends On by Power and Interest, Then Adding the Column That Makes the Map Useful

Why Map Stakeholders

The skin cream mercury screening project in Marlow County, a composite county, runs on cooperation from people the health department does not employ: the laboratory that lends the analyzer, the sites that host events, the community leaders whose word brings women in, and even the shopkeepers whose products may be tested. Bryson (2004) argues that public projects succeed when planners identify who has a stake, how much power and interest each holds and what each needs, rather than assuming support. This map places ten parties on a power and interest grid, then adds a column for the cost cooperation would impose on each.

What this page is doingGrounding the map in a planning source shows it is a tool for action rather than a list of names.
3

The Map

Table 1

Stakeholders by Power, Interest and Cost of Cooperation

StakeholderPower over projectInterest in projectCost of cooperating |
State public health laboratoryHigh: lends analyzer, confirms resultsModerateStaff time; analyzer unavailable for other uses for two weeks at a time |
County health officerHigh: approves project and reportsModeratePolitical risk if findings upset local businesses |
Community health centerMedium: hosts events, accepts referralsHighClinic space on event days; clinician time for referred women |
Somali community associationMedium: trusted voiceHighLeaders' credibility if the project feels like blame |
Mexican consulate health windowMedium: reaches recent arrivalsModerateStaff time; diplomatic caution about products from Mexico |
Filipino and Nigerian church groupsMedium: trusted gathering placesModerateHall space; concern about stigma |
Beauty supply shop ownersMedium: can help or undermineLow to negativePossible loss of sales if their products test positive |
Women who use creamsHigh: project exists for themVariableTime, privacy, possible loss of a valued product |
State health department regulatorsHigh over sellers, low over projectModerateInvestigation workload if brands are reported |
Local mediaMedium: shape public framingLow until a findingNone directly; risk to the project if coverage stigmatizes |

Note. Placements are the student's judgment from meetings and the setting profile; the county and groups are composite.

Reading the Grid

High-power, moderate-interest parties, such as the laboratory and the health officer, must be kept satisfied: they can stop the project, but it is not their main concern. High-interest, medium-power groups, such as the community health center and community associations, should be closely involved, since they bring the women the project serves. Shop owners have medium power and low or negative interest, which makes them the hardest group.

Why the Cost Column Matters

The cost column changes how each party is approached. The state laboratory's cost is mostly scheduling, so the project will book the analyzer months ahead and share results in a format the laboratory can use. The community associations' cost is reputational: if the project feels like criticism of women's choices, leaders lose standing. Every material will frame the issue as product safety, and leaders will review materials before use. For shop owners, the cost could be real lost sales, so the project will not test products on shelves or name shops publicly; it will report brands to regulators, who have the authority to act (21 C.F.R. § 700.13). For women, the cost is a valued product, which is why a replacement moisturizer is offered.

Parties Left Off the Map

Two groups were considered and left off: online sellers, who supply some creams but cannot be engaged locally, and the regional poison center, which receives calls but has no role in screening. Both may matter later. If many contaminated creams turn out to have been bought online, the state health department, not the county, is the right party to approach the platforms, and the project's brand reports will give it the evidence to do so. The poison center will receive a copy of the final report so its staff know the project exists.

What the Map Changes in the Plan

Two changes follow. First, community leaders will co-sign invitations, since their trust is what brings women in. Second, the project will meet with a small group of shop owners before the first event to explain what it will and will not do, reducing the chance that they warn customers away. The contamination found in international testing, 6% of products above 1,000 parts per million in one study (Hamann et al., 2014), is reason enough to proceed; the map shows how to proceed without making enemies of people the project needs.

References

Bryson, J. M. (2004). What to do when stakeholders matter: Stakeholder identification and analysis techniques. Public Management Review, 6(1), 21-53. https://doi.org/10.1080/14719030410001675722

Hamann, C. R., Boonchai, W., Wen, L., Sakanashi, E. N., Chu, C.-Y., Hamann, K., Hamann, C. P., Sinniah, K., & Hamann, D. (2014). Spectrometric analysis of mercury content in 549 skin-lightening products: Is mercury toxicity a hidden global health hazard? Journal of the American Academy of Dermatology, 70(2), 281-287. https://doi.org/10.1016/j.jaad.2013.09.050

Use of Mercury Compounds in Cosmetics, 21 C.F.R. § 700.13 (2024).

PUBH 6641 Week 6 instructions, in plain terms

Stakeholder mapping assignments ask students to identify the individuals and organizations that can affect or are affected by their project, and to analyze their positions. Prompts usually require a list of stakeholders, a classification such as power and interest, a description of each party's concerns and a plan for engaging them. Some instructors require a grid or diagram; others prefer a table. Expect two to three pages. Instructors reward maps that go beyond placement on a grid to explain what each party needs or risks, and plans that change because of the analysis. Recognizing parties who may oppose the project, and planning for them, usually distinguishes strong submissions.

Inside the PUBH 6641 Week 6 example

The brief opens with why the project needs cooperation from people the department does not employ, citing stakeholder analysis research. A table lists ten parties with power, interest and the cost of cooperating. A section reads the grid by quadrant. The core section explains how the cost column changes the approach to the laboratory, community associations, shop owners and women themselves. A section names two parties left off and why. The brief ends with two concrete changes to the project plan that follow from the map. The grid reading groups parties by quadrant before the cost column is discussed.

PUBH 6641 Week 6 rubric: what earns full marks

Stakeholder maps are graded on completeness, accuracy of placement, depth of analysis and use in planning. Completeness means key parties, including potential opponents, are included. Placement should be justified. Depth comes from analyzing each party's concerns or costs, not only their position. Use in planning is shown when the map changes what the project will do. Citation of a stakeholder analysis source strengthens the work. Maps that list supporters only, or that never affect the plan, tend to score lower. Maps that include parties likely to resist, such as sellers whose products may be tested, and plan specifically for them, show realistic thinking. Credit also goes to approaches tailored to each party's cost, rather than a single outreach plan for everyone. Naming parties left off, with reasons, shows the map was built deliberately. A map that leads to at least one concrete change in the plan earns the most.

PUBH 6641 Week 6 help from the desk

Students often list only friendly partners. Include anyone who could slow or stop the project. For each party, ask what cooperation would cost them, in time, money or reputation. Use that cost to decide how to approach them. Plan at least one change to your project because of the map. Say who you left off and why. A stakeholder map for your project can be prepared if you list the parties involved. For each stakeholder, write the one thing that would make them say no. Then decide what the project can do about it. Revisit the map after the first events, since positions change.

Get a PUBH 6641 Week 6 example written to your instructions

Share the Week 6 prompt and rubric and your logic model, and every party the activities depend on is placed and costed. Real partners' names, contacts and agreements stay with you; the sample's library system, clinics and realtor association are invented. A first map is free and returns inside 24-48h.

More PUBH 6641 papers and MPH samples

PUBH 6641 Week 6 questions, answered

Where can I find a free PUBH 6641 Week 6 sample paper?

Find the Week 6 stakeholder map above, placing ten parties in a skin cream mercury screening project.

What is a power and interest grid?

A chart sorting each party by its ability to help or block the work and by how much the work matters to it.

Why add a cost-of-cooperation column?

Knowing what cooperation would cost each party shows how to approach them, beyond where they sit on the grid.

Why meet shop owners before the first event?

Their products may be tested, so telling them plainly that shelves will not be tested lowers the chance they warn customers away.

Who was left off the map and why?

Online sellers and the poison center, because the project cannot engage the first locally and the second has no role in screening.