NURS 8600 Week 7 DNP project run chart analysis example

DNP Field Experience Walden University Free custom sample in 24 to 48h

This NURS 8600 Week 7 run chart analysis example turns nine months of a composite rural clinic's DNP project data into three charts a practice leader can read at a glance. Walden NURS 8600 asks DNP students to analyze change over time, and every chart here carries the baseline median and four annotations: launch, the first improvement cycle and its spread, the second cycle and the course correction. The rules are stated and applied in a fixed order: shift, trend, runs and outlying points. Screening shows both a shift and a trend. Brief intervention improves after the course correction, but two points are not called a shift. Referral offers are plotted as counts because the numbers are too small, and a one-minute rise in rooming time is reported plainly.

CourseNURS 8600 DNP Field Experience
WeekWeek 7
Paper typeRun chart analysis
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramDoctor of Nursing Practice (DNP)
UpdatedSeptember 2026

Free sample paper for NURS 8600 Week 7

1

Reading the Months: A Run Chart Analysis of Screening, Brief Intervention and Referral Offers Across Launch, Two Improvement Cycles and a Course Correction

Student Name

College of Nursing, Walden University

NURS 8600: DNP Field Experience

Instructor Name

Month Day, Year

What this page is doingThe title names the three measures and the four events annotated on the charts, which is what a reader needs to interpret them.
2

Reading the Months: A Run Chart Analysis of Screening, Brief Intervention and Referral Offers Across Launch, Two Improvement Cycles and a Course Correction

Purpose and Method

This analysis presents the project's three process measures as run charts from the baseline months through September and interprets them with the run chart rules. Plotting one measure month by month against its median line, as a run chart does, allows a small set of probability-based rules to separate signals of real change from random variation without requiring the larger datasets that control charts need (Perla et al., 2011). Statistical process control methods, of which run charts are the simplest form, are well suited to improvement work because they show change over time rather than a single before and after comparison (Benneyan et al., 2003).

Each chart plots monthly proportions. A horizontal line marks the baseline median, calculated from the three sampled baseline months. Vertical annotations mark four events: launch on April 1, the first improvement cycle in mid-May and its spread in June, the second improvement cycle in early August and the course correction on September 1. The rules were applied in a fixed order (Provost & Murray, 2011). A shift needs at least six months in a row that sit together above the median or together below it. A trend needs at least five months in a row that each move the same way, up or down. The count of runs is then compared with the number expected by chance, and finally any single month far out of line with the rest is noted. All figures are illustrative values made up for a composite clinic.

What this page is doingStating the rules and their order before any chart is read prevents the analysis from choosing a rule to fit a hoped-for result.
3

Chart 1: Screening Documentation

Table 1 gives the values plotted on the first chart.

Table 1

Screening Documentation by Month

MonthPercent of annual visits with screening documented
Baseline month 122
Baseline month 225
Baseline month 326
April (launch)69
May (first cycle)76
June (cycle 1 spread)81
July84
August (second cycle)85
September (course correction)86

Shift. All six post-launch points lie above the baseline median of 25 percent, meeting the rule for a shift. Trend. The six post-launch points rise every month, meeting the rule for a trend. Interpretation. Screening documentation changed at launch and has continued to rise, although the monthly gains have narrowed since June, suggesting the measure is approaching a plateau in the mid-80s. The change in data source at launch, from a sampled review to a full count, is a caution: part of the jump may reflect better measurement. But a jump from about a quarter to over two thirds of visits is too large to be explained by the change in method alone.

Chart 2: Brief Intervention Documentation

Table 2 gives the values plotted on the second chart.

Table 2

Brief Intervention Documentation for Positive Screens by Month

MonthPositive screensPercent with brief intervention documented
Baseline month 1250
Baseline month 220
Baseline month 3333
April (launch)1850
May (first cycle)2055
June (cycle 1 spread)2152
July2255
August (second cycle)2370
September (course correction)2479

Shift. All six post-launch points lie above the baseline median of 33 percent. The baseline rests on only seven positive screens, however, so this shift says little. A more useful comparison. Using the median of the first four post-launch months, 53.5 percent, as a working reference, the August and September points both lie above it. Two points do not meet any rule, and it would be premature to claim that the second cycle and the course correction produced a shift. Interpretation. The pattern is consistent with the midpoint finding that brief intervention stalled at about half and with the course correction improving it, but confirmation will need at least four more months above the reference line.

What this page is doingRefusing to call two high points a shift, even though they support the project's story, is what makes the analysis trustworthy.
4

Chart 3: Referral Offers

Referral-eligible visits numbered four or five each month after launch and one or none each baseline month. With so few eligible visits, one patient more or less swings a month's percentage by a fifth or a quarter, and the run chart rules lose their meaning. The chart therefore plots counts, offers made beside eligible visits, rather than proportions: 1 of 4 in April, 2 of 5 in May, 4 of 5 in June, 3 of 4 in July, 3 of 5 in August and 3 of 4 in September. Offers have been made for more than half of eligible visits every month since the first cycle spread, compared with none at baseline. The pattern is encouraging but inconclusive, and the final report will say so.

Balancing Measure: Rooming Time

Median rooming time was 11 minutes at baseline and has been 12 minutes every month since launch. This small increase is real and consistent, and it should be reported rather than explained away. Staff have not described it as a burden, and visit length overall has not changed noticeably, but the clinic should know that the screen costs about a minute per visit. If rooming time rises further, particularly after the course correction adds provider time on phone-coverage days, it would be a signal to revisit the workflow.

Summary for Clinic Leaders

Screening documentation has clearly changed and continues to improve slowly. Brief intervention documentation improved at launch, stalled and may be improving again after the course correction; more months are needed. Referral offers have improved in count but are too few to analyze with run chart rules. Rooming time has risen by one minute. The charts will be updated monthly, with the course correction annotated, and the reference line for brief intervention will be recalculated once six post-correction months are available. The charts will also be shared at the monthly staff meeting, printed large with the annotations, since staff who made the changes should see what followed them. Staff at the August meeting asked why screening kept rising after launch, and the discussion suggested that the declined option and the medical assistants' growing comfort both contributed. Such explanations cannot be proven from the chart, but recording them beside it helps the next team understand the pattern. Keeping the annotations on every chart matters: without them, a reader could not link changes in the measures to the actions taken, and the charts would show only that something changed, not what.

References

Benneyan, J. C., Lloyd, R. C., & Plsek, P. E. (2003). Statistical process control as a tool for research and healthcare improvement. Quality and Safety in Health Care, 12(6), 458-464. https://doi.org/10.1136/qhc.12.6.458

Perla, R. J., Provost, L. P., & Murray, S. K. (2011). The run chart: A simple analytical tool for learning from variation in healthcare processes. BMJ Quality and Safety, 20(1), 46-51. https://doi.org/10.1136/bmjqs.2009.037895

Provost, L. P., & Murray, S. K. (2011). The health care data guide: Learning from data for improvement. Jossey-Bass.

What the NURS 8600 Week 7 instructions ask for

Run chart assignments in Week 7 usually ask you to display your project's process measures over time and interpret them with the standard rules. Analyses often run five to six pages, with one chart per measure. Plot monthly values from baseline onward with the baseline median as a horizontal line. Annotate every intervention event so readers can connect changes to actions. State the rules and apply them in the same order on every chart. Say plainly when a pattern does not meet a rule, even if it supports your project. Treat very small denominators with caution, perhaps plotting counts. Report the balancing measure honestly, including any worsening, and summarize the findings in terms a clinic leader can use.

How this NURS 8600 Week 7 example is built

A method section cites Perla and colleagues on run charts, Benneyan and colleagues on statistical process control and Provost and Murray for the order of rules, and lists the four annotated events. Chart 1 presents screening in a table by month and finds a shift and a trend, noting the change in data source. Chart 2 presents brief intervention, finds a weak baseline shift and declines to call the post-correction rise a shift. Chart 3 reports referral offers as counts. A balancing measure section reports the one-minute rise in rooming time. A summary for clinic leaders explains how the charts will be shared and updated.

Reading the NURS 8600 Week 7 rubric

Run chart analyses are generally weighed on correct construction, correct application of rules, honest interpretation and usefulness to decision makers. Construction earns credit for medians, consistent time units and annotations. Rule application is scored on stating rules and applying them consistently. Honest interpretation is often the largest share, rewarded when writers refuse to over-read short patterns. Handling small denominators thoughtfully shows statistical judgment. The balancing measure should be reported as a finding. A summary written for leaders shows the analysis serves practice. Clear figures or tables and APA references to run chart sources complete the criteria. A chart that shows a stall honestly can score as well as one that shows steady gains.

NURS 8600 Week 7 help from the desk

Run chart analyses lose marks when they call two or three high points a shift because they fit the project's story. Another common loss is leaving annotations off, so no one can link a change to what caused it. Some analyses use the mean instead of the median, or change rules from chart to chart. Others hide a worsening balancing measure. Draw the baseline median, annotate every event, state the rules and apply them in order, call only what the rules support, handle small numbers carefully and report the balancing measure plainly. The desk can draft an analysis of your own project's data. Recalculate reference lines only when you say so in advance.

Get a NURS 8600 Week 7 example written to your instructions

Share the data analysis prompt and rubric, with your measure definitions and a description of the data you hold, and a rule-based run chart analysis written to that brief comes back in 24-48h, free the first time. No real clinic produced the shifts described; your analysis reports only what your own data show.

More NURS 8600 papers and DNP samples

NURS 8600 Week 7 questions, answered

Why use the baseline median rather than the mean?

Run chart rules are built around the median, which a few unusual months disturb less than they would a mean. The example draws the baseline median on each chart and applies the rules relative to it. Statistical process control charts, which use different limits, may also be acceptable to your faculty, but if you choose run charts, the median is the reference the rules assume.

What if the run charts show no shift at all?

Report it. The example's referral chart shows a signal too short to call, and the analysis says so plainly. A project that produced no detectable change can still be a strong DNP project when the analysis is honest and the discussion explains why. The reasoning is what gets judged, not whether the numbers moved in the direction you hoped.

How should the balancing measure be reported if it worsened?

Plainly, on its own page, as the example does. A balancing measure exists to catch costs, and a worsening signal is exactly the information it was chosen to provide. Your analysis would then connect it to the workflow change it may reflect and say what the clinic might do about it, rather than treating it as a footnote to good process results.

Where can I find a free NURS 8600 Week 7 sample paper?

The full analysis, three charts in table form, rule applications, the balancing measure and the leaders' summary, is provided here at no cost. An analysis of your project's data can be requested.

Why are referral offers plotted as counts in the NURS 8600 Week 7 analysis?

Because only four or five visits a month qualified, so one patient swings the percentage by a fifth or a quarter and the run chart rules lose their meaning.