| Course | MHRM 6901 Capstone: Strategic Human Resource Management |
|---|---|
| Week | Week 4 |
| Paper type | Section draft |
| Length | About 760 words, 5 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | MS in Human Resource Management |
| Updated | October 2026 |
Free sample paper for MHRM 6901 Week 4
Workforce Planning Section, First Draft: How Many Maintenance Technicians the Second Restaurant Contract Requires, What Hartwell's Pipeline Can Supply and the Shortfall Each Staffing Option Leaves
Student Name
Walden University
MHRM 6901: Capstone: Strategic Human Resource Management
Instructor Name
Month Day, Year
Workforce Planning Section, First Draft: How Many Maintenance Technicians the Second Restaurant Contract Requires, What Hartwell's Pipeline Can Supply and the Shortfall Each Staffing Option Leaves
What the Section Must Establish
This section estimates how many maintenance technicians Hartwell Baking Company needs to run its second restaurant contract, how many its current sources can supply and how large the gap is under each staffing option. It is drafted before the rewards section, which will test whether pay changes alter these numbers. Figures refer to the organizational profile (F1 to F20).
Demand
The customer wants the new Janesville line at full volume six months after signing. The line requires 14 additional technicians across three shifts (F17), raising the technician workforce from 58 (F5) to 72. Over the same period Hartwell must replace departures. Turnover has averaged about ten technicians a year (F8), and eleven more could retire before the contract's third year (F9). Assuming a third of those retire on schedule, Hartwell should expect about thirteen departures in the first year.
Total demand in the first year is therefore about 27 technician hires: 14 for the new line and 13 to replace departures.
Supply
At current practice, Hartwell can expect about eleven technician hires in year one against a demand of 27, a shortfall of about sixteen.
Table 1
Technician Supply in Year One by Source
| Source | Basis | Expected hires in year one | |
|---|---|---|
| External hiring at current pay | About nine technician hires a year over three years; 16 weeks average to fill (F11) | 9 | |
| External hiring with one added recruiter | Historical rate plus an estimate from the recruiter's prior employer | 12 to 13 | |
| Informal internal learners | Six production workers learning informally (F13); perhaps two ready within a year | 2 | |
| Contract maintenance from an equipment vendor | Vendor quote for two technicians per shift on the new line | 6, temporary | |
Composite organization.
The Shortfall Under Each Option
No option closes the gap in year one on the customer's schedule. Cappelli (2008) argued that firms facing uncertain demand should combine faster external hiring with internal development, so that neither source must carry the whole load. The table shows why: outside hiring alone cannot reach 27 in a year, and an apprenticeship cannot produce qualified technicians quickly enough to help in year one.
Table 2
Year-One Shortfall by Staffing Option
| Option | Supply in year one | Shortfall | |
|---|---|---|
| Current practice | 11 | 16 | |
| Added recruiter | 14 to 15 | 12 to 13 | |
| Added recruiter and vendor contract technicians | 20 to 21, of which 6 temporary | 6 to 7 | |
| Phase the contract to 60 percent volume in year one, needing 8 new-line technicians, and add a recruiter | Demand falls to 21; supply 14 to 15 | 6 to 7 | |
| Phase the contract, add recruiter and start a two-year apprenticeship of eight a year | Year one as above; apprentices begin contributing in year two | 6 to 7 in year one, closing in year two | |
Composite organization. Apprentices are not counted as qualified until the end of their first year.
The Case for Developing Technicians
Lepak and Snell (1999) suggested that skills both valuable and specific to the firm are best developed internally. Technicians on a high-speed line fit that description. Muehlemann and Wolter (2014) found that many firms recover their apprenticeship costs, some during the training period itself, through apprentices' productive work and lower costs of hiring skilled workers later. An apprenticeship would also rebuild the internal pipeline the gap analysis found missing.
Risks in the Estimates
Three assumptions could move these numbers. The first is the retirement rate: if more than a third of the eleven eligible technicians retire in year one, demand rises. Several have said they would retire sooner if night coverage increases, which the new line would require. The second is the external hiring rate. The added recruiter's estimate comes from a larger metropolitan market than Janesville's, and the local supply of experienced technicians may be thinner. The third is the vendor's capacity: its quote is for six technicians, but the vendor serves other food plants in the region and would not guarantee the same people each week. Each of these risks points in the same direction, toward a larger shortfall than the table shows, which is why the draft treats its estimates as the most hopeful plausible case rather than a forecast.
What This Draft Leaves Open
The supply estimates assume current pay. The rewards section will test whether raising technician pay and the night differential changes the external hiring rate or the turnover rate, either of which would change every row above.
References
Cappelli, P. (2008). Talent on demand: Managing talent in an age of uncertainty. Harvard Business Press.
Lepak, D. P., & Snell, S. A. (1999). The human resource architecture: Toward a theory of human capital allocation and development. Academy of Management Review, 24(1), 31-48. https://doi.org/10.2307/259035
Muehlemann, S., & Wolter, S. C. (2014). Return on investment of apprenticeship systems for enterprises: Evidence from cost-benefit analyses. IZA Journal of Labor Policy, 3, Article 25. https://doi.org/10.1186/2193-9004-3-25
MHRM 6901 Week 4 instructions, in plain terms
Week 4 asks you to draft the capstone's first analytical section. State the section's task in numbers. Estimate demand from the organization's plans and its history of losses. Estimate supply from each source using the organization's own record, not recruiting's hopes. Compare options in a table showing the gap each leaves. Use research to explain why some combinations work better than others. Name the assumptions that could move your numbers, and say which way. Be clear about what later sections must test, since this draft comes before them. A typical draft runs near three pages and holds two tables, one for supply by source and one for the shortfall under each option, each followed by a short reading.
Inside the MHRM 6901 Week 4 example
The section opens by stating its three quantities and noting that the rewards section will test them. A demand section adds 14 new-line technicians to about 13 expected departures. A supply table estimates hires from four sources based on history, totaling about eleven at current practice. A shortfall table compares five options. A section cites Cappelli on combining buying and building and Lepak and Snell and Muehlemann and Wolter on developing technicians. A risks section names three assumptions, all pointing toward a larger shortfall, and a final section flags the pay assumption for the rewards section. A note under the shortfall table explains that apprentices are not counted as qualified until their first year ends, so the table does not flatter the apprenticeship.
MHRM 6901 Week 4 rubric: what earns full marks
Section drafts are graded on quantitative clarity and honesty. Stating the task in numbers earns credit. Demand and supply estimates grounded in the organization's history are weighted heavily, since optimistic assumptions are the most common flaw in workforce plans. A clear comparison of options, each with its remaining gap, shows analytical discipline. Research that supports the logic of combining approaches demonstrates grounding. Naming risks and their direction shows judgment. Flagging what later sections must test shows capstone awareness. Drafts that recommend an option without quantifying the gap, or rely on targets instead of history, receive lower marks. Careful, checkable arithmetic in both tables is noticed.
MHRM 6901 Week 4 help from the desk
Start with what the organization needs: how many people, with what skills, by when. Add the people you expect to lose to turnover and retirement. Then look at how many people the organization has actually hired or developed into that role in past years, by source. Subtract to find the gap. For each option you are considering, recalculate the gap. Ask which assumptions you are least sure of and which direction they would move the result. Many workforce sections assume the recruiting team will simply hire faster. If you want help building the numbers, send us your organization's history. Show where each supply figure came from.
Get a MHRM 6901 Week 4 example written to your instructions
Attach the section draft instructions with their rubric, plus the profile or gap analysis the section has to build on. A drafted section with its claim first, shown arithmetic and a dependency box for the sections still to come is returned in 24 to 48 hours, and a first draft is free. Every technician, vacancy and shift in it is fictional.
More MHRM 6901 papers and MS in Human Resource Management samples
- MHRM 6901 Week 1: Capstone Scope Proposal
- MHRM 6901 Week 2: Capstone Organizational Profile
- MHRM 6901 Week 3: Stated Versus Actual Gap Analysis
- MHRM 6901 Week 5: Capstone Peer Workshop
- MHRM 6901 Week 6: Rewards Section Draft
- MHRM 6901 Week 7: Section Reconciliation Memo
- MHRM 6901 Week 8: Capstone Executive Summary
- MHRM 6901 Week 9: Capstone Appendix Set
- MHRM 6901 Week 10: Capstone Revision Pass
- MHRM 6901 Week 11: Strategic HR Capstone Paper
- MHRM 6801 Week 4: Survey Evidence Memo
- MHRM 6751 Week 4: GLOBE and Trompenaars Analysis
- MHRM 6701 Week 4: Shared Value Position Paper
- MHRM 6101 Week 4: Freight Dispatcher Job Analysis
MHRM 6901 Week 4 questions, answered
Where can I find a free MHRM 6901 Week 4 sample paper?
This page holds the workforce planning section draft, free to read.
How many technician hires does the MHRM 6901 Week 4 section estimate for year one?
About 27: 14 for the new line and about 13 to replace departures.
What can the bakery's current sources supply?
About eleven technicians in year one, based on its own history.
Does any option close the gap in year one?
No; even the best combination leaves a shortfall of about six or seven.
Why develop technicians internally?
Keeping a high-speed line running is a skill worth a lot and tied to this plant, and training costs tend to pay back.