NURS 8750 Week 9 Sustainability Plan Example

Doctoral Seminar V Walden University Free custom sample in 24 to 48h

This NURS 8750 Week 9 sustainability plan example hands a nurse-led ICU mobilization routine, its measure and its unsolved weekend problem to named roles before the DNP project lead graduates. Walden NURS 8750 asks candidates what happens after a project closes, and the plan starts from Wiltsey Stirman and colleagues' definition of sustainment. An APA table assigns seven components to the night and day charge nurses, the respiratory therapy supervisor, the nurse manager, the educator and the practice council, each placed in an existing template, sheet or agenda. Three early warning signals carry thresholds and actions. A section sets conditions for pausing the routine, including thresholds agreed with the medical director, and cites Moore and colleagues on when sustaining is not success. Handover steps end with removing the lead's name from every form. Fixsen and colleagues and Perla and colleagues support it.

CourseNURS 8750 Doctoral Seminar V
WeekWeek 9
Paper typeSustainability plan paper
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramDoctor of Nursing Practice (DNP)
UpdatedOctober 2026

Free sample paper for NURS 8750 Week 9

1

After the Project Ends: A Sustainability Plan That Hands the Mobilization Routine, Its Measure and Its Weekend Problem to Named Roles

Student Name

College of Nursing, Walden University

NURS 8750: Doctoral Seminar V

Instructor Name

Month Day, Year

What this page is doingThe title lists the three things being handed over, which tells the reader the plan is about ownership rather than hope.
2

After the Project Ends: A Sustainability Plan That Hands the Mobilization Routine, Its Measure and Its Weekend Problem to Named Roles

What Has to Survive

The nurse-led mobilization routine was built by a project, and projects end. In eight weeks the project lead graduates, the night champion's protected time stops and the weekly reports to the seminar cease. What should continue is not the project but three things it produced: the routine itself (the 0400 screen, the round, the respiratory therapist call and the 1800 entry), the measure that shows whether the routine is happening, and the unsolved weekend problem. Reviews of the sustainability literature define sustainment as the continued delivery of a practice and its benefits after initial implementation support is withdrawn, and they find that it is reported far less often than adoption (Wiltsey Stirman et al., 2012). This plan names what continues, who owns each part, how anyone will know if it is fading and when the practice should be stopped.

What this page is doingThe opening separates the routine from the project and lists exactly what must outlast the project, using a published definition of sustainment.
3

Ownership After Handover

Table 1 assigns every component to a role that will exist after the project ends. Roles rather than names are used so that turnover does not break the chain.

Table 1

Components of the Routine and Their Owners After the Project Ends

ComponentOwnerWhere it now livesWhat the owner does
0400 safety screenNight charge nurse0400 assessment template; charge nurse role descriptionConfirms the screen is done on every ventilated patient each night
Reading results at the roundDay charge nurseRound checklistReads results aloud; records any override and its reason
Respiratory therapist callRespiratory therapy supervisorRespiratory therapy daily assignment sheetAssigns one therapist to ICU mobilization after 0900 on weekdays
Measure and run chartNurse managerSaved report ICU Mobility Weekly; monthly staff meeting agendaPulls the saved report on the month's opening Monday and adds the new point to the chart
Stopped-session reviewNurse managerEvent form in the unit's reporting folderReviews each form within one working day
Training for new staffUnit educatorOrientation checklistDelivers the three segments and the paired first session
Weekend designPractice councilCouncil agenda, standing item for six monthsReviews the weekend test and decides next steps

Note. Each entry was agreed with the role holder before this plan was submitted. The respiratory therapy supervisor's agreement covers weekdays; weekend coverage is part of the council's decision.

What this page is doingEvery component has an owner, a home in an existing document and a specific duty, which is what makes the plan checkable.
4

Why These Homes

Each component was placed in a document or meeting that already exists and already has an owner. The screen lives in the 0400 template because a separate form would be the first thing dropped on a busy night. The measure lives in a saved report that runs without anyone rebuilding it, and on a meeting agenda that the nurse manager already chairs. The council's standing item ensures the weekend problem is discussed monthly for six months rather than remembered occasionally. Implementation research describes this movement into routine structures as the step from initial implementation to full operation, the point at which a practice keeps running without the enthusiasm of whoever started it (Fixsen et al., 2005). A routine that needs its founder is still a project.

What this page is doingExplaining why each home was chosen shows the plan follows a principle, building into existing structures, rather than a list of assignments.
5

Early Warning Signs

The nurse manager will watch three signals each month, each with a threshold that triggers a response.

Signal 1: The outcome drifts down. If two consecutive monthly points fall below the protocol-period median of 45%, or six consecutive weekly points fall below it when weekly data are pulled, the manager reviews the process measures to find which link has weakened.

Signal 2: Screens stop being recorded. If screens recorded by 0600 fall below 80% in any month, the night charge nurses are asked what has changed. Screen completion has been the earliest sign of trouble in every week the project measured, often moving a week or two before the outcome.

Signal 3: Training gaps open. If more than two nurses on the current roster have no paired first session recorded, the educator schedules pairings in the following two weeks.

Run charts make these signals visible without statistical expertise, and their rules were already familiar to the unit from the project (Perla et al., 2011).

What this page is doingEach warning sign has a threshold and an action attached, which turns monitoring into a routine someone can follow.
6

When the Practice Should Be Stopped

A sustainability plan should also say when not to sustain. The routine should be paused and reviewed by the medical director if any of three conditions occurs: a fall or a dislodged breathing tube during a session; a stopped-session rate above 15 per 100 sessions in any month with at least ten sessions; or a review of emergency department response times showing two or more calls over 15 minutes in a month that coincided with ICU mobilization. These thresholds are not drawn from published standards. They were set with the medical director at roughly twice the rates observed during the project, so that ordinary variation does not trigger them and a real change in safety does.

The practice should also be reconsidered if the unit changes in a way that removes its foundations, such as losing the charge nurse without an assignment or gaining a dedicated physical therapist. In the first case the screen would lose its night owner; in the second, a therapist-led model might serve patients better than a nurse-led one. Sustaining a practice whose conditions have changed is not success (Moore et al., 2017).

What this page is doingNaming stop conditions, and being honest that they are local thresholds, shows the plan treats sustainment as a decision rather than an end in itself.
7

Handover Steps Before the Project Lead Leaves

Four steps happen in the final month. The project lead and nurse manager run the monthly report together twice, then the manager runs it alone once while the lead observes. The data collection protocol, written earlier so that someone other than the lead can run it, is moved from the project folder to the unit's shared folder. The final report goes to the practice council with this plan attached, and the council minutes record each owner's acceptance. Finally, the lead's name is removed from every form and template, so that no part of the routine points to a person who is no longer there.

The chair will receive a copy of the signed council minutes as evidence that the handover took place.

What this page is doingThe last section turns the plan into dated steps, ending with removing the lead's name, a small detail that shows the handover is real.
8

References

Fixsen, D. L., Naoom, S. F., Blase, K. A., Friedman, R. M., & Wallace, F. (2005). Implementation research: A synthesis of the literature. University of South Florida, Louis de la Parte Florida Mental Health Institute, The National Implementation Research Network.

Moore, J. E., Mascarenhas, A., Bain, J., & Straus, S. E. (2017). Developing a comprehensive definition of sustainability. Implementation Science, 12, Article 110. https://doi.org/10.1186/s13012-017-0637-1

Perla, R. J., Provost, L. P., & Murray, S. K. (2011). The run chart: A simple analytical tool for learning from variation in healthcare processes. BMJ Quality & Safety, 20(1), 46-51. https://doi.org/10.1136/bmjqs.2009.037895

Wiltsey Stirman, S., Kimberly, J., Cook, N., Calloway, A., Castro, F., & Charns, M. (2012). The sustainability of new programs and innovations: A review of the empirical literature and recommendations for future research. Implementation Science, 7, Article 17. https://doi.org/10.1186/1748-5908-7-17

NURS 8750 Week 9 instructions, in plain terms

A sustainability plan this week typically asks how your change will continue after the project and its support end. Begin by defining exactly what must continue, separating the practice from the project. Assign every component to a role that will exist after you leave, and place it in a document or meeting that already has an owner. Explain why each home was chosen. Set early warning signals with thresholds and responses, so someone notices fading before it is complete. State conditions under which the practice should be paused or reconsidered, including changes in the setting. Finally, describe handover steps with dates, so the transfer of ownership is visible rather than assumed.

How this NURS 8750 Week 9 example is built

The opening lists the routine, its measure and the weekend problem as what must survive, citing Wiltsey Stirman and colleagues. Table 1 gives seven components with owner, home and duty, noting that each role holder agreed. The next section explains each home and cites Fixsen and colleagues. Three warning signals follow: the outcome falling below the protocol median, screens under 80% and training gaps, with run charts from Perla and colleagues. The stop conditions section gives three safety thresholds set with the medical director, admits they are local and cites Moore and colleagues on changed conditions. The handover section describes joint report runs, moving the data protocol to a shared folder, council acceptance and removing the lead's name.

Where the marks sit in the NURS 8750 Week 9 rubric

Faculty generally reward sustainability plans that assign ownership concretely and build the practice into existing structures. Plans that rely on continued enthusiasm or on the project lead earn little. Credit grows when warning signals have thresholds and actions attached, because monitoring without a response is not a plan. Stating when a practice should stop shows mature judgment and is often rewarded explicitly. Honesty about where thresholds come from matters, since local thresholds presented as published standards mislead. Sources should inform the plan's logic rather than appear as a separate review. Clear tables, specific handover steps and APA formatting complete the expectations.

NURS 8750 Week 9 help from the desk

Sustainability sections often promise ongoing education and leadership support without naming who does what. Others assign everything to a manager, who already has too much to own. Some never consider that a practice might need to stop if conditions change. Make a list of every task your project performs each week, then find a role and an existing document or meeting for each one. Agree each assignment with the person who holds the role before writing it down. Add a threshold and response for the measure most likely to fade first. Our writers can build a sustainability plan for your project with owners, warning signals, stop conditions and handover steps.

Get a NURS 8750 Week 9 example written to your instructions

Describe the change, who currently runs it, what reporting already exists at the site, and any template the prompt attached, and a matched plan example returns inside 24 to 48 hours, free the first time. Naming the reporting that already runs matters more than anything else sent, since the plan gets built onto it.

More NURS 8750 papers and DNP samples

NURS 8750 Week 9 questions, answered

Where can I find a free NURS 8750 Week 9 sample paper?

The plan, its ownership table and the stop conditions are all reproduced above, readable by anyone free of charge.

Who owns the measure in the NURS 8750 Week 9 plan?

The nurse manager, who pulls a saved report each month, updates the run chart and presents it at the monthly staff meeting she already chairs.

What are the early warning signs?

The outcome falling below the protocol-period median, screens recorded before 0600 dropping under 80% and more than two nurses on the roster without a paired first session.

When should the routine be paused?

After a fall or dislodged breathing tube during a session, a stopped-session rate above 15 per 100, or repeated emergency delays coinciding with mobilization.

Why remove the project lead's name from forms?

So no part of the routine points to a person who is no longer there, which is a simple test that ownership has really moved.