| Course | NURS 8720 Doctoral Seminar II |
|---|---|
| Week | Week 8 |
| Paper type | Feasibility analysis paper |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | Doctor of Nursing Practice (DNP) |
| Updated | October 2026 |
Free sample paper for NURS 8720 Week 8
Designing to the Building: A Feasibility Analysis That Turns Four Constraints of a Community ICU Into Decisions About a Mobilization Project
Student Name
College of Nursing, Walden University
NURS 8720: Doctoral Seminar II
Instructor Name
Month Day, Year
Designing to the Building: A Feasibility Analysis That Turns Four Constraints of a Community ICU Into Decisions About a Mobilization Project
Four Constraints
No data analyst. The hospital has no analyst available to the ICU; quality reports are produced centrally on a fixed schedule.
An educator at half time. The ICU's nurse educator is employed half time and splits even that between the ICU and the step-down unit.
A twenty-one-week window. After the four-week prospective baseline, the project has from February to June 30 for improvement cycles.
Monthly reports. The electronic record's standard reports for the ICU arrive monthly, about ten days after the month ends.
Each constraint is treated below as information about what the project can be, not as an excuse for what it cannot do. Feasibility, in improvement work, means designing an intervention and its measurement so that the people in the setting can sustain them with the resources they actually have (Langley et al., 2009).
No Analyst: Choose a Measure the Record Already Produces
Without an analyst, a measure requiring custom queries, linking tables or cleaning free text is not feasible. The main measure was therefore designed so that the record can produce it with a standard report. The educator will add a single required field to the ventilator flowsheet: the highest ICU Mobility Scale level reached today, entered by the patient's nurse at 1800. The scale was chosen partly because it is a single number with clear definitions that bedside staff can apply consistently (Hodgson et al., 2014). The standard flowsheet report can then list, for every ventilated patient-day, the date and the level entered. Counting the days at level 3 or higher, and dividing by eligible days, is a spreadsheet calculation the project lead can do in under an hour a month.
The constraint also ruled out two measures considered earlier: minutes of mobilization per day, which would need a time-stamped entry for each session, and time from intubation to first mobilization, which would need linking ventilator start times to activity entries. Both are better measures in principle. Neither can be produced reliably here, and a measure that depends on someone's spare evening will not survive the project.
The single field also limits what can go wrong. A measure assembled from several fields can fail in several places, and each failure would need someone to investigate it. With one required field, a missing entry is visible on the report the next morning, and the champion can ask the nurse concerned while the day is still fresh.
A Half-Time Educator: Teach Inside Existing Huddles
Separate training sessions for 28 nurses across two shifts would take more of the educator's time than she has. The teaching is therefore folded into the unit's existing shift huddles, which happen at 0700 and 1900 every day and last about ten minutes. Over two weeks, each huddle covers one part of the protocol in five minutes: the safety screen, the whiteboard, calling the respiratory therapist, recording the scale level. Nearly every nurse attends several huddles in two weeks, so coverage comes from repetition rather than scheduled sessions. The champion on each shift handles questions during the shift, and the educator spends her project time, about two hours a week, reviewing the first entries and correcting misunderstandings.
The cost of this choice is depth. Huddle teaching cannot include hands-on practice of mobilizing a ventilated patient. That is addressed by pairing each nurse with the champion or the physical therapist for their first mobilization under the protocol.
Huddle teaching also has an advantage beyond saving time. Because it happens in the unit, at shift change, it reaches night nurses as easily as day nurses, and night nurses are the ones who complete the safety screen. Scheduled classes in the education room tend to be attended mostly by day staff, which would have left the first step of the protocol in the hands of the nurses least prepared for it.
A Twenty-One-Week Window: Plan Few Cycles and Accept Weekly Points Early
Twenty-one weeks allows five to seven cycles of two to three weeks. The project will therefore plan only the first two cycles in detail, the safety screen and the respiratory therapist call, and leave later cycles to be chosen from what those reveal. To see change within the window, the first eight weeks will be charted weekly, roughly 12 eligible days a week. Weekly points are noisier than monthly ones, but they give enough points for run chart rules to detect a shift within two months rather than six (Perla et al., 2011). After eight weeks, the chart moves to monthly points.
Monthly Reports: Accept a Ten-Day Lag, and Watch the Process in Real Time
Monthly reports arriving ten days late mean the main measure will always describe the recent past, not the present. The project accepts this lag for the main measure but adds a process measure that can be seen in real time: the night champion tallies, each morning, how many ventilated patients have a screen result on the whiteboard. That count takes two minutes and shows within days whether the first step of the protocol is happening. If screen completion falls, the team can respond before the monthly report confirms a drop in mobilization.
The Project That Fits the Building
Taken together, the four decisions produce a smaller project than the one first imagined: one main measure from a single flowsheet field, teaching in five-minute huddle segments, two planned cycles with later ones chosen as the project learns and a daily paper tally alongside a monthly report. It is a project the unit can run without help it does not have. Doctoral project guidance stresses that feasibility includes the resources, time and support available in the practice setting, and that a project designed beyond them is unlikely to be completed or sustained (Moran et al., 2020). The design that results is one the unit could keep running after the doctoral project ends, which is the strongest test of feasibility there is.
References
Hodgson, C., Needham, D., Haines, K., Bailey, M., Ward, A., Harrold, M., Young, P., Zanni, J., Buhr, H., Higgins, A., Presneill, J., & Berney, S. (2014). Feasibility and inter-rater reliability of the ICU Mobility Scale. Heart & Lung, 43(1), 19-24. https://doi.org/10.1016/j.hrtlng.2013.11.003
Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.
Moran, K. J., Burson, R., & Conrad, D. (2020). The doctor of nursing practice project: A framework for success (3rd ed.). Jones & Bartlett Learning.
Perla, R. J., Provost, L. P., & Murray, S. K. (2011). The run chart: A simple analytical tool for learning from variation in healthcare processes. BMJ Quality & Safety, 20(1), 46-51. https://doi.org/10.1136/bmjqs.2009.037895
Reading the NURS 8720 Week 8 instructions
In the feasibility week, the paper usually asks you to set the constraints of your setting against your project and show how the project will work within them. List the constraints briefly and concretely, such as staff, time, data systems and budget. Then treat each one as an input to design rather than as an apology. For each, describe the decision it forces, what alternatives it rules out and what the decision costs. Prefer measures your systems already produce and teaching that fits existing routines. Show how the window shapes the number of cycles and the frequency of measurement. Finish by describing the project that results and whether the unit could sustain it after you leave.
Inside the NURS 8720 Week 8 example
The first section lists four constraints in single lines and cites Langley and colleagues on feasibility. The analyst section explains the single required flowsheet field, the spreadsheet calculation and the two measures dropped, citing Hodgson and colleagues, and adds a paragraph on why one field fails less often. The educator section describes huddle teaching, its reach to night nurses and paired first mobilizations. The window section limits detailed planning to two cycles and moves to weekly charting, with Perla and colleagues. The reports section adds a two-minute morning tally of screen results. The final section describes the smaller project and cites Moran and colleagues on sustainability.
Where the marks sit in the NURS 8720 Week 8 rubric
Feasibility analyses are usually judged on how concretely constraints are described, how directly they shape the design and how honestly costs are stated. Faculty reward papers that turn each constraint into a specific decision rather than a mitigation plan. Credit rises when the writer names alternatives that the constraint ruled out, showing the choice was considered. Measures produced by existing systems and teaching built into existing routines are often valued for realism. Attention to whether the unit could sustain the project after the doctoral work ends is a strong sign of judgment. Clear structure and relevant sources complete the expectations.
NURS 8720 Week 8 help from the desk
Feasibility papers often list constraints and then promise to work around them through hard work or extra hours. Others describe the ideal project and add a section of apologies. Some ignore data systems until late in the project, when measures turn out to be impossible to produce. Ask your educator, manager and informatics staff what each part of your plan would require of them, and redesign around their answers. Choose measures you can produce with a standard report. Plan only the first cycles in detail. Our writers can prepare a feasibility analysis for your project, turning your setting's constraints into design decisions. Write down the cost of each decision, so readers can see what the constraint took away.
Get a NURS 8720 Week 8 example written to your instructions
Send the prompt, the constraints your section asks you to address and any required headings, and a feasibility example written inside those limits comes back to you at the same length. The first custom one is free and lands inside 24 to 48 hours. Real staffing figures and reporting capacity are known only to people inside your organization, and the numbers shown here are illustrative.
More NURS 8720 papers and DNP samples
- NURS 8720 Week 1: Project Classification Post
- NURS 8720 Week 2: SMART Aim Statement
- NURS 8720 Week 3: Design Comparison Paper
- NURS 8720 Week 4: PDSA Model Brief
- NURS 8720 Week 5: Project Alignment Matrix
- NURS 8720 Week 6: Method Defense Reply
- NURS 8720 Week 7: Practice Setting Analysis
- NURS 8720 Week 9: Design Limitations Post
- NURS 8720 Week 10: Methods Section Draft
- NURS 8720 Week 11: Project Revision Memo
- NURS 8710 Week 8: Thematic Synthesis Paper
- NURS 8705 Week 8: Scope Revision Memo
- NURS 8600 Week 8: DNP sustainment handoff plan
- DNRS 6211 Week 8: Payer mix analysis
NURS 8720 Week 8 questions, answered
Does feasibility include cost?
Where a prompt requires it, yes, and the example keeps costs in terms of time rather than currency because time is what a term length project actually spends. Where a section requires a budget, figures from your own organization govern, and the safest approach is a small number of line items each tied to a decision already argued elsewhere in the paper.
Where can I find a free NURS 8720 Week 8 sample paper?
The complete analysis of four constraints and the decisions they produced is published above, free to read.
Why does the NURS 8720 Week 8 project use one flowsheet field as its measure?
Because there is no analyst to build custom queries, so the measure must come from a standard report and be calculated in a spreadsheet in under an hour a month.
How does the project cope with monthly reports arriving late?
It accepts the lag for the main measure and adds a two-minute daily tally of safety screen results on the whiteboards, visible in real time.
What measures were dropped as infeasible?
Minutes of mobilization per day and time from intubation to first mobilization, both of which would need time-stamped entries or linked data the unit cannot produce.