NURS 6451 Week 10 evaluation plan example

Evaluation Methods for Health Information Technology Walden University Free custom sample in 24 to 48h

This NURS 6451 Week 10 evaluation plan example turns the term's pieces into a plan a department could run. A one-page summary states the question, the non-randomized stepped-wedge design, the primary measure and the decision the findings will inform: whether to fix the recipient directory and urgency settings before extending the messaging app further. Walden NURS 6451 asks MSN informatics students to add owners, sequence and data handling to their earlier work. Nine sections follow in the order work would happen, from approvals and baseline observation to analysis, data handling and reporting to the STARE-HI standard, each with an owner, a prerequisite and a product. Resources are listed as staff time, not dollars.

CourseNURS 6451 Evaluation Methods for Health Information Technology
WeekWeek 10
Paper typeEvaluation plan
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramMaster of Science in Nursing (MSN)
UpdatedSeptember 2026

Free sample paper for NURS 6451 Week 10

1

Evaluation Plan: Secure Messaging on Four Medical-Surgical Units, From Approvals to a Report Written to the STARE-HI Standard

Student Name

College of Nursing, Walden University

NURS 6451: Evaluation Methods for Health Information Technology

Instructor Name

Month Day, Year

What this page is doingThe title runs from the first step to the reporting commitment, which is what distinguishes a runnable plan from a collection of weekly pieces.
2

Evaluation Plan: Secure Messaging on Four Medical-Surgical Units, From Approvals to a Report Written to the STARE-HI Standard

Summary

Question: after the switch from pagers to the messaging app on four medical-surgical units, does a nurse wait more or less time for the prescriber covering a patient to acknowledge a routine request? Design: a non-randomized stepped-wedge comparison using the staggered go-live, with each unit's time series and concurrent pager units as comparisons. Primary measure: the acknowledgment interval, defined identically for observed pager periods and logged app periods. Decision the findings will inform: whether to fix the recipient directory and urgency settings before extending the app to the hospital's remaining units, and whether medical staff should agree new expectations for marking and answering messages. Reporting: a final report following the STARE-HI guideline for health informatics evaluation studies.

What this page is doingThe one-page summary names the decision the evaluation serves, so every later section can be judged by whether it helps make that decision.
3

1. Approvals and Data Access

Owner: evaluation lead, the clinical informatics nurse. Prerequisite: sponsor approval of this plan. Work: obtain a determination from the institutional review board on whether the evaluation is quality improvement or research; obtain medical executive committee agreement to observe prescribers with results reported only by unit and time of day; agree with information services and the privacy officer on log fields, extraction schedule and de-identification of message threads; confirm export terms with the vendor. Produces: a signed data access agreement and an approvals record. Time: four weeks, starting immediately, because the baseline observation cannot begin without it.

2. Baseline Observation on Units 3 and 4

Owner: observation coordinator, a nurse educator trained in time-motion methods. Prerequisite: approvals. Work: two weeks of structured observation of non-urgent nurse requests and prescriber acknowledgments on each unit before its go-live, day and evening shifts, using the written definitions in the measurement plan, plus observation of prescribers during morning rounds. Produces: the pager-period baseline for the primary measure and the interruption measure. Time: two observers, about 60 hours each across four weeks. This step has a fixed deadline, since it must finish before each unit goes live.

3. Usability Round

Owner: evaluation lead with an information services analyst. Prerequisite: vendor test environment. Work: repeat the think-aloud sessions with six new nurses after the vendor changes the directory, urgency default and forwarding. Produces: comparison of misdirected messages and task completion with the first round. Time: one week, scheduled after the vendor's fix and before Unit 4's go-live.

4. Go-Live Waves With Measurement

Owner: evaluation lead. Prerequisite: baseline complete on the unit about to switch. Work: at each go-live, begin daily extraction of message logs for the unit; continue observation windows on units still on pagers; each month, watch a set of requests on the switched unit as they happen to check logged against observed intervals; run the downstream prompt to pharmacists, clerks and night coverage every two weeks. Produces: the stepped-wedge dataset. Time: through twelve weeks after the last unit switches.

5. Workflow Observation

Owner: observation coordinator. Prerequisite: at least eight weeks since go-live on a unit, so early novelty has faded. Work: time-motion observation of prescribers during rounds and interviews with clerks and pharmacists; monthly review of a sample of 50 de-identified threads per unit against the record for the balancing measure. Produces: interruption patterns and the share of decisions not reaching the chart.

6. Analysis

Owner: evaluation lead, with a statistician from the quality department. Prerequisite: complete dataset. Comparisons: acknowledgment intervals on app units against pager units in the same weeks, and each unit before against after, accounting for the trend over time. Stepped-wedge analyses must allow for clustering by unit and for secular trends, because later units spend more of the study in the intervention condition (Hemming et al., 2015). The statistician will specify the model, including how staffing and census are adjusted for, before any outcome data are examined, and that specification will be recorded. Secondary and balancing measures will be summarized by unit and period. Qualitative data from interviews and the downstream prompt will be analyzed for themes by two team members.

7. Data Handling

Message logs are extracted by information services with patient names and record numbers replaced by study codes; the key stays with information services. Message thread text is reviewed by one designated analyst in a secure hospital environment, de-identified before any other team member sees it, and never copied to personal devices. Observation notes record roles and times, not names. All evaluation data are stored on the hospital's approved research drive and destroyed twelve months after the final report unless the privacy officer approves longer retention. No result will name or single out an individual prescriber.

8. Reporting

The final report will follow STARE-HI, which lists what reports of health informatics evaluations should describe, including the setting, the system and its context, the study design and methods, the results and the limitations (Talmon et al., 2009). Committing to it now means the team records these details as work proceeds rather than reconstructing them afterward. Three products will be delivered: a two-page summary for the sponsor with the decision recommendation; unit-level reports for each nurse manager; and a configuration findings list for information services and the vendor. The CDC framework's final step, ensuring use and sharing lessons learned, is built into the delivery: the evaluation lead will present findings at the steering meeting where the extension decision is scheduled (Centers for Disease Control and Prevention [CDC], 1999).

9. Resources and Timeline

Staff time rather than cost is listed, since dollar figures would require budget data this plan does not have. Evaluation lead: about 8 hours a week for the duration. Two observers: about 60 hours each for baseline, 40 each for workflow observation. Statistician: about 30 hours. Information services analyst: about 4 hours a week during extraction. Privacy officer: about 6 hours for review. Timeline in weeks from plan approval: approvals weeks 1 to 4; baseline weeks 3 to 8 as unit schedules require; usability round week 9; go-live waves and measurement weeks 6 to 30; workflow observation weeks 14 to 30; analysis weeks 31 to 36; report week 38.

References

Centers for Disease Control and Prevention. (1999). Framework for program evaluation in public health. MMWR Recommendations and Reports, 48(RR-11), 1-40.

Hemming, K., Haines, T. P., Chilton, P. J., Girling, A. J., & Lilford, R. J. (2015). The stepped wedge cluster randomised trial: Rationale, design, analysis, and reporting. BMJ, 350, h391. https://doi.org/10.1136/bmj.h391

Talmon, J., Ammenwerth, E., Brender, J., de Keizer, N., Nykänen, P., & Rigby, M. (2009). STARE-HI: Statement on reporting of evaluation studies in health informatics. International Journal of Medical Informatics, 78(1), 1-9. https://doi.org/10.1016/j.ijmedinf.2008.09.002

The Walden NURS 6451 Week 10 instructions

Here the prompt commonly calls for a complete evaluation plan that integrates your question, design, measures, data collection, analysis, stakeholder engagement, ethics and reporting, often with a timeline and resource estimate. Many prompts ask you to follow a recognized reporting guideline. Plans commonly run eight to twelve pages. Organize the plan in the order work will happen, give each step an owner and a prerequisite and say what it produces. Describe data handling carefully, especially for data that contain protected health information. If your prompt asks for resources, list staff roles and time, and add dollar values only if you have a real basis. Check that your plan matches the design and measures you already defended.

Inside the NURS 6451 Week 10 example

The summary states the question, design, primary measure, decision and reporting commitment. Sections 1 to 5 cover approvals and data access, baseline observation on the units still using pagers, a second usability round, measurement across go-live waves with the downstream prompt and workflow observation, each with owner, prerequisite, work and product. Section 6 describes the analysis and cites guidance on clustering and time trends in stepped-wedge studies. Section 7 sets data handling rules. Section 8 commits to STARE-HI and three reports, citing the CDC framework on ensuring use. Section 9 lists staff time and a timeline in weeks. The timeline is written in weeks from plan approval.

NURS 6451 Week 10 rubric: what earns full marks

Evaluation plan rubrics usually score coherence of question, design and measures, completeness of components, feasibility, ethics and data protection, analysis, dissemination and presentation. Coherence rewards a plan in which each part serves the stated question. Completeness is checked against the components the prompt lists. Feasibility asks whether owners, sequence and resources are realistic. Ethics and data protection often carry significant weight when data include patient information. Analysis should name comparisons and who specifies the model. Dissemination earns credit when reports match the people who will act on them. Some rubrics also reward a timeline showing which steps have fixed deadlines, such as baseline observation before go-live.

NURS 6451 Week 10 help: mistakes that cost marks

Plans lose most when they paste the earlier weekly assignments together without owners, sequence or dependencies. Another is an analysis section that promises statistical tests without saying what will be compared. Some plans skip data handling or leave approvals until after data collection has started. Others invent a budget. Put a decision in the summary, order the sections by when work happens, name an owner and product for each, describe de-identification and access, commit to a reporting standard and list resources as staff time. Also check that every section names an owner and a product, since graders often test a few at random. Keep the summary to one page. Name the statistician's role.

Get a NURS 6451 Week 10 example written to your instructions

Send the Week 10 prompt and rubric along with whichever earlier pieces you have, and the desk integrates them into one plan with owners and sequence. There is no charge for a first sample, and it reaches you in 24-48h with the summary page ready for a sponsor to read.

More NURS 6451 papers and MSN samples

NURS 6451 Week 10 questions, answered

How is this plan different from the earlier weekly assignments?

The earlier pieces answer one component each; this plan makes them runnable together. It adds what none of them had, owners, sequence, dependencies, data handling and a reporting commitment, and it trims each earlier piece to what the department needs. Pasting the previous submissions in order would miss exactly the integration this week grades.

What is STARE-HI and why commit to it now?

STARE-HI is a guideline for reporting health informatics evaluation studies, listing what a report should describe about context, system, method and limitations. Committing to it in the plan means the evaluation team records those details as work proceeds rather than reconstructing them afterward. Sections that name a different reporting standard get the same commitment built around that one.

Does the plan need a budget?

Some prompts ask for resources and some do not. The sample lists staff roles and time commitments by task without dollar figures, since any costs attached to an imaginary hospital would be fiction. Where a budget is required, the resource list converts into cost categories whose values the department fills in, and the plan says which categories are most uncertain.

Where can I find a free NURS 6451 Week 10 sample paper?

The complete evaluation plan, summary and all nine sections, is posted on this page free. A plan that integrates your own term's work can be drafted on request.

What is STARE-HI in NURS 6451?

A guideline for reporting health informatics evaluation studies. Committing to it early means the team records the setting, system, methods and limitations as the work proceeds.