MSHR 6625 Week 9 Training Transfer Memo Example

Building Human Capital Through Training and Development Walden University Free custom sample in 24 to 48h

This MSHR 6625 Week 9 transfer memo example turns from the training session to the conditions waiting after it. Walden MSHR 6625 asks students to plan for transfer of training, so the memo opens on its finding: the design is sound, but two conditions on the job will undo it unless changed first. Baldwin and Ford's model structures the analysis in three parts. Trainee motivation is addressed with a real case of a crew sent to the wrong valve, citing Colquitt and colleagues. The design's in-truck practice and crew-lead follow-up support transfer, consistent with Blume and colleagues. A table names the threats in the work environment, paper sign-offs and signal dead zones, plus a crew habit of one person entering all orders, with owners and dates. Training waits if fixes lag, for the MS in Human Resource Management.

CourseMSHR 6625 Building Human Capital Through Training and Development
WeekWeek 9
Paper typeTransfer memo
LengthAbout 600 words, 4 pages
FormatMemo, APA 7 citations
SchoolWalden University
ProgramMS in Human Resource Management
UpdatedOctober 2026

Free sample paper for MSHR 6625 Week 9

1

Memorandum

To: Field Operations Manager, Mill Creek Water District

From: HR Training and Development Specialist

Date: March 23, 2026

Re: Two job conditions will undo the asset-field training unless changed before the first wave

 

Finding

The asset-field training design is sound, but two conditions in the work environment will undo it unless they are changed before the first wave of training. Technicians can leave a practice session completing asset fields correctly and be back to closing orders at the yard, or on paper, within two weeks if those conditions remain. This memo applies Baldwin and Ford's (1988) model of transfer of training, which explains whether learning is used on the job by looking at three inputs: the trainees, the training design and the work environment.

What this page is doingThe memo states its finding first: the risk to the program lies after the session, not in it.
2

Trainee Characteristics

Most technicians in the target group are motivated to get asset fields right once they understand why the data matter. In interviews for the needs assessment, several said they had assumed the fields were for "the office" and did not affect field work. When shown that wrong asset data send crews to the wrong valve during a main break, they took the point at once. Colquitt et al. (2000) found that motivation to learn and to apply learning was shaped by individual and situational factors, including whether trainees saw the training as useful. A short explanation at the start of each session, showing a real case of a crew sent to the wrong valve, addresses this.

Training Design

The design supports transfer well. Practice takes place in the truck, on real assets and the actual tablet, under crew leads who will see the technicians every day afterward. Blume et al. (2010) found in their meta-analytic review that transfer was stronger when training resembled the work setting and when follow-up support was available; the design provides both.

Work Environment

Two conditions in the work environment threaten transfer. Each would make it easier for a trained technician to fall back on the old way.

The third condition, crew habit, is less serious and can be addressed during training through crew leads.

Table 1

Conditions in the Work Environment

ConditionEffect on transferChange neededOwnerBy when |
Supervisors still sign paper tickets for some jobsTechnicians can bypass the mobile order, so new skills go unusedSet a date after which only mobile orders count as closedField operations managerBefore wave one |
Dead zones, mainly in the northern hillsTechnicians close orders at the yard from memory, where asset field errors returnEnable the app's offline mode so orders can be completed on site and sync laterIT, with the mobile vendorBefore wave one |
Crew habit of one person completing all orders at the end of the dayThe trained technician may not be the one entering dataCrew leads assign order completion to the technician who did the workCrew leads, prompted by field operationsDuring training |

Composite utility.

What this page is doingThe work environment is where the risk lies, so each condition is named with what it would do to the new habit.
3

Supports to Add

Two supports would strengthen transfer. First, a weekly report for each crew lead showing the share of the crew's orders with all asset fields complete, so crew leads can give feedback while the habit forms. Second, a short reference module on the tablet, showing where each maker stamps its ID, so a technician can look it up in the field.

Recommendation

Please set the paper-ticket end date and ask IT to enable offline mode before the first training wave begins. If either cannot be done in time, I recommend delaying the training rather than running it into conditions that will undo it; a delay of a few weeks costs less than training 45 technicians twice.

References

Baldwin, T. T., & Ford, J. K. (1988). Transfer of training: A review and directions for future research. Personnel Psychology, 41(1), 63-105. https://doi.org/10.1111/j.1744-6570.1988.tb00632.x

Blume, B. D., Ford, J. K., Baldwin, T. T., & Huang, J. L. (2010). Transfer of training: A meta-analytic review. Journal of Management, 36(4), 1065-1105. https://doi.org/10.1177/0149206309352880

Colquitt, J. A., LePine, J. A., & Noe, R. A. (2000). Toward an integrative theory of training motivation: A meta-analytic path analysis of 20 years of research. Journal of Applied Psychology, 85(5), 678-707. https://doi.org/10.1037/0021-9010.85.5.678

What the MSHR 6625 Week 9 instructions ask for

Week 9 asks you to assess whether your training will transfer to the job and what must change to make it do so. Work through a recognized transfer model, such as Baldwin and Ford's, one input at a time. Name the specific conditions that would support or erode the new behavior. For each threat, say what change is needed, who owns it and by when. Suggest supports to add after training, such as feedback reports or job aids. Close with a recommendation that is clear about what should happen if the needed changes are not ready in time, including whether the training should wait.

How the MSHR 6625 Week 9 example is put together

The memo opens with its finding about two job conditions. A section on trainee characteristics describes technicians' assumption that asset fields were for the office and proposes a real wrong-valve case at the start of each session, citing Colquitt and colleagues. A section on design notes in-truck practice and crew-lead follow-up, citing Blume and colleagues. A table lists three work-environment conditions with effects, changes, owners and dates. A section adds a weekly crew report and a tablet reference module. A closing section recommends setting the paper-ticket end date and enabling offline mode first, and delaying training if either cannot be done. Each condition in the table has an owner and a date, so the memo can be tracked after it is sent.

Where the marks sit in the MSHR 6625 Week 9 rubric

Transfer memos earn credit for looking beyond the session. Using a named model and examining all three of its inputs is weighted heavily. Identifying specific conditions in the work environment, rather than general barriers, shows insight. Assigning each condition an owner and date makes the analysis actionable. Proposing supports after training shows attention to how habits form. A recommendation willing to delay training rather than waste it demonstrates professional judgment. Memos that evaluate only the training design, list barriers without owners or assume transfer will happen once people are trained lose marks. Markers expect one table of conditions at the center. A willingness to delay training until the environment is ready is often the clearest sign of judgment.

MSHR 6625 Week 9 help from the desk

Picture a trainee returning to work the day after training. What will make it easy to use the new skill, and what will make it easier to go back to the old way? Look at supervisors, tools, routines and what gets checked or rewarded. List the conditions that work against the new behavior and decide who can change each. Students often focus on the training itself, which is usually not the weak point. Others name barriers such as "lack of support" without saying what support or from whom. Be specific and assign owners. Consider whether training should wait until the conditions are fixed. If you need help identifying conditions, our writers can suggest questions to ask supervisors.

Get a MSHR 6625 Week 9 example written to your instructions

Forward the transfer memo instructions and rubric, plus your design and evaluation plan if written. A memo naming environmental threats, each with an owner and a date before rollout, is returned in 24 to 48 hours; the first sample is on us. Supervisors and crews described are fictional composites.

More MSHR 6625 papers and MS in Human Resource Management samples

MSHR 6625 Week 9 questions, answered

Where can I find a free MSHR 6625 Week 9 sample paper?

The full transfer memo is printed below and is free to read.

What model does the MSHR 6625 Week 9 memo use?

Baldwin and Ford's model of trainee characteristics, training design and work environment.

Which conditions threaten transfer?

Supervisors still signing paper tickets and no signal in about a third of the service area.

What supports are added after training?

A weekly asset-field report for crew leads and a reference module on the tablet.

What if the fixes are not ready?

The memo recommends delaying training rather than delivering it into conditions that would undo it.