| Course | MHRM 6801 Organizational Effectiveness and Leadership |
|---|---|
| Week | Week 2 |
| Paper type | Observation memo |
| Length | About 560 words, 4 pages |
| Format | Memo, APA 7 citations |
| School | Walden University |
| Program | MS in Human Resource Management |
| Updated | October 2026 |
Free sample paper for MHRM 6801 Week 2
Memorandum
To: Operations Director, Bellamy Moving & Storage
From: HR Analyst
Date: February 23, 2026
Re: How one move travels through the company
Purpose and Method
This memo records how Bellamy actually runs by following a single household move, a three-bedroom house in Aurora moving to Littleton in late January, from the first phone call to the claims desk. I observed the in-home estimate, sat with dispatch on the scheduling days, rode with the crew on load and delivery days and read the file afterward. Harrison (2005) recommends that diagnosis begin with a description of how work flows before any judgment is made, and Schein (1999) cautions that an observer's early interpretations shape what is noticed afterward. Nothing in this memo is presented as a problem. It records what happened, who decided and where the move waited.
The Move, Step by Step
Table 1
Handoffs, Decisions and Waiting Points for One Move
| Step | Who acts | Decision made | Handoff to | Wait before next step | |
|---|---|---|---|---|
| Customer calls | Sales coordinator, Aurora | Book an in-home estimate | Estimator | 4 days | |
| In-home estimate | Estimator | Volume estimated at 820 cubic feet; one truck, three movers, one day | Sales coordinator | 1 day | |
| Booking | Sales coordinator | Price quoted from estimate; date set | Dispatch | 19 days | |
| Crew assignment | Dispatcher | Crew chosen two days before the move | Crew chief, by text at 6 a.m. on move day | 2 days | |
| Load day | Crew chief and two movers | On arrival, volume judged larger than estimate; crew chief decides to load everything on one truck | Driver | Overnight | |
| Delivery | Same crew | Two items found damaged on unloading; noted on inventory | Customer | 6 days | |
| Claim filed | Customer, online | Claim for a dresser and a lamp | Claims desk | 11 days | |
| Claim settled | Claims specialist | Repair payment approved | Accounting | 9 days | |
Composite organization; times from the job file.
What the Record Shows About Structure
Four features of how Bellamy runs are visible in this one move.
First, the volume estimate is made by one person and passes, unchanged, through three further hands before anyone compares it with the actual load. The loaded volume, recorded by the crew chief, was about 1,010 cubic feet.
Second, the crew chief is the first person to see the house after the estimator, and makes the loading decision alone at the house, usually within the first half hour. No step in the process sends that decision back to the depot.
Third, the crew learned which job it had at 6 a.m. on the day of the move. The dispatcher assigned the crew two days earlier but sends assignments the morning of the move as a standing practice.
Fourth, the claims desk and the estimator never communicate. The claims specialist's file does not record the estimate, and the estimator was not told of the claim.
Mintzberg (1979) described how organizations coordinate work through direct supervision, standardized processes, standardized outputs or mutual adjustment. In this move, coordination after the estimate relied almost entirely on standardized handoffs, with little mutual adjustment between the people involved.
Limits
One move cannot show what is typical, and the move observed was in January, when depots are quieter than in summer. The next step is to compare this pattern with Bellamy's records across many moves and seasons, which is the work of the next memo.
References
Harrison, M. I. (2005). Diagnosing organizations: Methods, models, and processes (3rd ed.). Sage.
Mintzberg, H. (1979). The structuring of organizations: A synthesis of the research. Prentice-Hall.
Schein, E. H. (1999). Process consultation revisited: Building the helping relationship. Addison-Wesley.
MHRM 6801 Week 2 instructions, in plain terms
Week 2 asks you to describe how work actually flows through an organization, without evaluating it. Choose a single unit of work, such as one order, case or move, and follow it from start to finish. Record every handoff, who made each decision and how long the work waited between steps. Present the sequence in a table. Then describe the structural features the sequence reveals, still without calling anything a problem. Use a framework for how organizations coordinate work. Be clear that one case cannot show what is typical, and say how you will test the pattern next. A single table usually carries the observation, followed by a short list of structural features.
How this MHRM 6801 Week 2 example is built
The memo opens with its method: observing an estimate, sitting with dispatch, riding with the crew and reading the file, with Harrison and Schein on describing before judging. A table lists eight steps from the customer's call to the claim settlement, with times drawn from the job file. A section records four structural features, including an estimate of 820 cubic feet against a loaded volume of about 1,010 and claims that never reach the estimator. A paragraph applies Mintzberg's coordination mechanisms. A limits section notes that one January move cannot show what is typical in summer. Times between steps come from the job file rather than memory, so the waiting points are recorded exactly.
Reading the MHRM 6801 Week 2 rubric
Observation memos are graded on descriptive discipline. Following one unit of work from start to finish earns credit. A table recording handoffs, decisions and waits shows careful observation. Describing structural features without judgment is weighted heavily, since the assignment tests whether the writer can see before evaluating. Using a coordination framework to name what is observed shows conceptual grounding. Acknowledging that one case is not representative, and planning the next step, demonstrates method. Memos that slip into blaming a department, or describe the organization chart instead of the actual flow of work, receive lower marks.
Common MHRM 6801 Week 2 mistakes, and how to avoid them
Choose one piece of work your organization handles regularly and follow it through every step. Write down who touched it, what they decided, who they handed it to and how long it sat before the next step. Do not write whether anything was good or bad. When you finish, read your notes and list features of how the work is structured, such as where information is not passed on or where one person decides alone. Many memos describe the process as it is supposed to work rather than as it did. If you want help turning your notes into a table, send them to us and we will show you how to organize them. Two pages is usually enough.
Get a MHRM 6801 Week 2 example written to your instructions
Send the Week 2 memo instructions, the rubric, and a few lines on the organization you settled on in Week 1. A finished observation memo returns in 24 to 48 hours, first one free, traced through one real unit of work. Colleagues appear only by role, and nothing from inside your company's own files is needed or used.
More MHRM 6801 papers and MS in Human Resource Management samples
- MHRM 6801 Week 1: Effectiveness Discussion Post
- MHRM 6801 Week 3: Organizational Symptom Review
- MHRM 6801 Week 4: Survey Evidence Memo
- MHRM 6801 Week 5: LMX Leadership Assessment
- MHRM 6801 Week 6: Six-Box Model Application
- MHRM 6801 Week 7: Causal Argument Paper
- MHRM 6801 Week 8: Competing Values Culture Analysis
- MHRM 6801 Week 9: Organizational Diagnostic Report
- MHRM 6801 Week 10: Single Intervention Proposal
- MHRM 6801 Week 11: Final Organizational Analysis
- MHRM 6751 Week 2: Host Country Labor Market Brief
- MHRM 6701 Week 2: Overnight Staffing Direction Memo
- MHRM 6601 Week 2: Point-Factor Job Evaluation
- MHRM 6101 Week 2: HR Function Role Brief
MHRM 6801 Week 2 questions, answered
Where can I find a free MHRM 6801 Week 2 sample paper?
See the full observation memo below, free.
What does the MHRM 6801 Week 2 memo follow?
One household move from the first call and estimate to the settled claim.
Why does the memo avoid judgment?
Because diagnosis should begin with description, and early judgments shape what is noticed.
What structural features does it record?
An unchecked estimate, a crew chief deciding alone, assignments sent at 6 a.m. and claims never reaching the estimator.
Which framework names the coordination pattern?
Mintzberg's coordination mechanisms.