| Course | MGMT 8009M Organizational Decision Making and Judgment |
|---|---|
| Week | Week 10 |
| Paper type | Debiasing design |
| Length | About 960 words, 6 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | PhD in Management |
| Updated | October 2026 |
Free sample paper for MGMT 8009M Week 10
Three Repairs Built Into the Bid Gate: A Debiasing Design for a Construction Firm's Committee That Approved Margins Its Projects Never Reached, With an Authentic Dissenter, a Premortem and a Margin Log, Each Owned and Priced
Student Name
Walden University
MGMT 8009M: Organizational Decision Making and Judgment
Instructor Name
Month Day, Year
Three Repairs Built Into the Bid Gate: A Debiasing Design for a Construction Firm's Committee That Approved Margins Its Projects Never Reached, With an Authentic Dissenter, a Premortem and a Margin Log, Each Owned and Priced
Four Losses in Six
Sutter Point Constructors, a composite engineering and construction firm working on water treatment and industrial process plants, lost money on four of its last six fixed-price bids. In each of the six, the bid committee approved a margin the finished project did not reach. The pattern is consistent enough to describe in a sentence: approved margins ran above realized margins on every project, and the gap was widest on the most competitive bids.
[after]
Four of the six realized margins fell below the 3 percent level the firm treats as the cost of overhead, which is why the firm counts them as losses. The two bids with the fewest competitors lost the least margin.
Table 1
Approved and Realized Margins on the Last Six Fixed-Price Bids
| Project | Bidders | Approved margin | Realized margin | |
|---|---|---|---|
| Clarifier upgrade | 3 | 9.0 percent | 6.1 percent | |
| Pump station | 5 | 8.5 percent | 1.2 percent | |
| Chemical feed building | 4 | 8.0 percent | 2.7 percent | |
| Membrane plant expansion | 6 | 7.5 percent | minus 3.4 percent | |
| Biosolids dryer | 6 | 7.0 percent | minus 1.8 percent | |
| Outfall rehabilitation | 2 | 10.0 percent | 7.6 percent | |
Repairs Built Into Routine
Heath et al. (1998) argued that organizations can compensate for individual judgment errors through cognitive repairs: practices, procedures and norms that correct for predictable biases without requiring individuals to become less biased. Their argument shifts the target of debiasing from minds to routines. That shift matters for Sutter Point, because the firm had already scheduled a two-day training course on cognitive bias for its estimators and committee members. Training addresses individuals and assumes that awareness will change judgment under deadline and competitive pressure. The design below instead builds three repairs into the bid committee's final gate, where the margin is approved.
The Design
[after]
Every row traces to the record. The first two address the approval meeting, where optimism concentrated on competitive bids. The third addresses the reason the pattern persisted for six bids: the committee never saw its own accuracy.
Table 2
Three Countermeasures by Target Failure
| Countermeasure | Failure it targets | When it runs | Owner | Cost | |
|---|---|---|---|---|
| Authentic dissenter | Optimistic consensus on competitive bids | Final gate, before approval | Chief estimator assigns | About 3 hours per bid | |
| Premortem | Unexamined risks in scope and schedule | Final gate, first agenda item | Committee chair | About 30 minutes of meeting time | |
| Margin prediction log | No feedback on committee accuracy | At approval and at closeout | Project controls manager | About 2 hours per project | |
A Dissenter Who Meant It
The obvious repair is a devil's advocate, a member assigned to argue against each bid. Nemeth et al. (2001) compared assigned devil's advocacy with authentic dissent, in which the dissenter actually holds the opposing view. Authentic dissent stimulated more original thinking and more consideration of alternatives in the majority than role-played dissent did, and role-played dissent could even lead the majority to strengthen its initial position. A committee that knows the critic is playing a part can discount the critique as theater.
The design therefore does not assign a rotating critic. For each bid above $10 million, the chief estimator identifies an estimator who argued, at any earlier stage, for a lower price, a higher contingency or declining the bid. That person presents the case for declining or repricing at the final gate. If no one on the estimating team held such a view, the record of that fact goes into the bid file, which is itself informative.
A Premortem at the Last Gate
Before the vote, each committee member writes, in three minutes and without discussion, the most likely reason the project will lose money if it is won at this margin. The chair collects the answers and reads them aloud before debate opens. The technique draws on research by Mitchell et al. (1989), who found that people asked to imagine that an event had already occurred generated more reasons for it than people asked to imagine that it might occur. Framing failure as a fact makes its causes easier to find. The design fixes the premortem as the first agenda item at every final gate, so that it cannot be skipped on a busy week.
A Log That Can Be Checked
Each approved bid records its predicted margin and the three reasons the committee gave for it. At closeout, project controls compares the realized margin with the prediction and notes which reasons held. After two years, the log will give the committee its first record of its own accuracy, by bid type and number of competitors. The log does not change any single decision. It changes what the committee knows about itself.
Why Training Alone Falls Short
The scheduled training is not harmful, and the design does not cancel it. But knowing about optimism bias rarely prevents it under the conditions that produce it: a competitive bid, a deadline and a team that has worked hard on an estimate. The three repairs work regardless of whether members remember the training.
Costs and What Success Would Look Like
Together the repairs cost about four hours of staff time per bid and two hours per project at closeout. Sutter Point submits about fifteen fixed-price bids a year. Success would mean a narrowing gap between approved and realized margins on competitive bids, visible in the log after two years, and possibly fewer bids won at thin margins.
Limits
Sutter Point is a composite, and six bids are too few to estimate the size of the bias with confidence. The log is designed to supply the evidence the firm currently lacks.
References
Heath, C., Larrick, R. P., & Klayman, J. (1998). Cognitive repairs: How organizational practices can compensate for individual shortcomings. Research in Organizational Behavior, 20, 1-37.
Mitchell, D. J., Russo, J. E., & Pennington, N. (1989). Back to the future: Temporal perspective in the explanation of events. Journal of Behavioral Decision Making, 2(1), 25-38. https://doi.org/10.1002/bdm.3960020103
Nemeth, C., Brown, K., & Rogers, J. (2001). Devil's advocate versus authentic dissent: Stimulating quantity and quality. European Journal of Social Psychology, 31(6), 707-720. https://doi.org/10.1002/ejsp.58
MGMT 8009M Week 10 instructions, in plain terms
The tenth week asks you to design countermeasures for a decision bias in a specific organizational routine. Expect to describe the pattern of errors from the record, then propose a small number of repairs, each tied to a failure, placed at a stage of the routine, assigned an owner and priced in time or delay. Instructors look for use of research on organizational debiasing, especially work arguing that routines can correct for individual biases. Generic lists of techniques earn less than designs fitted to one record. You should also address training as an alternative and explain its limits. About six pages, laid out as a design document with a central table. Keep the number of countermeasures small; three well-fitted repairs beat ten loosely attached ones.
How this MGMT 8009M Week 10 example is built
The sample opens with a six-bid table showing bidders, approved margin and realized margin. A section on cognitive repairs explains why the design targets routines rather than minds and notes the training already scheduled. The central table lists the three countermeasures by target failure, timing, owner and cost. The dissent section explains Nemeth's finding and specifies that an estimator who argued against the bid takes the seat. The premortem section fixes it as the first agenda item and draws on research on prospective hindsight. The log section explains what two years of predictions and outcomes will show. A section on training and one on costs and expected results close the design.
MGMT 8009M Week 10 rubric: what earns full marks
Fit between countermeasure and failure carries this assignment. A list of familiar techniques attached to no weakness in the committee's record shows knowledge without application. Credit concentrates in the table, where each row must trace to the record, and in the dissent row, where the difference between assigned and authentic dissent should change the design rather than decorate it. Cognitive repairs earn when the concept explains why routines are targeted. Costs are expected on every row. Recommending training as the main remedy returns the problem to individuals and forfeits analysis credit, so the design must say why training alone falls short. A clear layout and correct APA list complete the MGMT 8009M Week 10 grading.
MGMT 8009M Week 10 help from the desk
A frequent shortfall is a design that could be dropped into any company. Start from the record and state the specific pattern of error, with numbers. For each countermeasure, write which failure it answers and where in the routine it runs. Decide who owns it and what it costs; vague owners mean the repair will lapse. Read the research on devil's advocacy carefully, since a role-played critic can backfire. Include a way for the organization to learn its own accuracy over time. Address training directly rather than ignoring it. If your draft is still a list of techniques, a tutor can help you fit each one to a failure, and the bid committee example above shows the finished document.
Get a MGMT 8009M Week 10 example written to your instructions
Send the Week 10 prompt and rubric, together with the decision routine you want redesigned and the failure it keeps producing, and a debiasing design with its countermeasure table follows in 24-48h, the first free. Say whether your section requires particular techniques, and describe the routine by its steps rather than by anyone's name.
More MGMT 8009M papers and PhD in Management samples
- MGMT 8009M Week 1: Process Critique
- MGMT 8009M Week 2: Bounded Rationality Memo
- MGMT 8009M Week 3: Framing Analysis
- MGMT 8009M Week 4: Heuristics Review
- MGMT 8009M Week 5: Decision Reconstruction
- MGMT 8009M Week 6: Group Process Case
- MGMT 8009M Week 7: Escalation Case
- MGMT 8009M Week 8: Information Flow Memo
- MGMT 8009M Week 9: Incentive Analysis
- MGMT 8009M Week 11: Decision Audit
- MGMT 8003M Week 10: Peer Review Letter
MGMT 8009M Week 10 questions, answered
Where can I find a free MGMT 8009M Week 10 sample paper?
The construction bid committee debiasing design is on this page in full as the Week 10 sample.
What are cognitive repairs in MGMT 8009M?
Organizational practices that correct predictable individual errors without requiring people to become less biased.
Why does the sample use an authentic dissenter instead of a devil's advocate?
Nemeth and colleagues found genuine dissent prompts more thorough thinking, while assigned critics can be discounted.
How does the premortem work in the Week 10 design?
Members write the likeliest reason the project will lose money before the vote, and the chair reads the answers aloud.
Why not rely on bias training?
Awareness rarely holds under competitive pressure and deadlines, so the repairs are built into the routine instead.