DDHA 9500 Week 7 Approach Outline Example

DHA Project Prospectus Walden University Free custom sample in 24 to 48h

This DDHA 9500 Week 7 approach outline example sizes a design to its question for a study of how crowded wards relate to how long ambulance crews wait at three hospitals of an invented system. Walden DDHA 9500 asks DHA students for an approach that matches the purpose, and the outline names a quantitative, retrospective observational design to fit the verb "examine the association." It lists the data that already exist in hospital and ambulance records against the short list that must be gathered, offload role dates and a 100-arrival validation sample, citing Greaves and colleagues. The unit is the adult ambulance arrival, offload is measured as Carter and colleagues advise, and the comparison runs across boarding levels within each hospital. Analysis reports medians and the share past the 30-minute interval from Cooney and colleagues. A closing section states what the design cannot show, drawing on Li and colleagues.

CourseDDHA 9500 DHA Project Prospectus
WeekWeek 7
Paper typeApproach outline
LengthAbout 660 words, 5 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramDoctor of Healthcare Administration (DHA)
UpdatedOctober 2026

Free sample paper for DDHA 9500 Week 7

1

Approach Outline for the Offload Project: A Retrospective Design Sized to Its Question, Existing Data Set Against the Little That Must Be Gathered, and What the Design Cannot Show

Student Name

Walden University

DDHA 9500: DHA Project Prospectus

Instructor Name

Month Day, Year

What this page is doingThe title stresses fit between approach and question, and it lists the parts in the order a reviewer checks them.
2

Approach Outline for the Offload Project: A Retrospective Design Sized to Its Question, Existing Data Set Against the Little That Must Be Gathered, and What the Design Cannot Show

Design

The project will use a quantitative, retrospective observational design. It matches the verb in the purpose statement, "examine the association," because it can show whether offload times are longer when more admitted patients are boarding, without claiming to show that boarding causes the delay. No intervention is introduced, and no patient or staff member is contacted.

Data That Already Exist

Most of the data are produced in the ordinary course of operating. From the health system's emergency department records come arrival time, the time the triage nurse accepted the patient from the ambulance crew, the hospital, and patient age, for every adult arriving by ambulance over 24 months. From the same records comes an hourly count of admitted patients still in each emergency department, already calculated for the system's operations dashboard. From the county ambulance service's electronic patient care records come the crew's recorded arrival at the hospital and the crew's recorded transfer of care. The two sources will be linked by hospital, date and arrival time within a short window, a method the system's analytics team already uses for other ambulance reports.

Data That Must Be Gathered

Only two items must be gathered on purpose. The first is a list of the periods during which each hospital had a dedicated ambulance offload nurse or similar role, to be obtained from the emergency department managers, because the literature suggests such roles affect offload time (Greaves et al., 2017). The second is a validation sample: for 100 randomly selected arrivals, a chart review comparing the hospital's transfer-of-care time with the ambulance service's, to estimate how closely the two sources agree.

Unit of Analysis

The unit of analysis is the individual adult ambulance arrival. Each arrival has one offload time, measured from the crew's arrival at the hospital to transfer of care, and one exposure value, the number of admitted patients boarding in that department during the hour of arrival. Carter et al. (2014) caution against using ambulance turnaround time in place of offload time, so the outcome uses the two time stamps that bracket the handover itself.

Comparison

The central comparison is between offload times during hours with different boarding counts, within each hospital. Hours will be grouped by boarding count, and offload times compared across groups, adjusting for hour of day, day of week, month and whether an offload role was in place. Comparing within hospitals avoids confusing differences between hospitals, such as size and layout, with the effect of boarding. A secondary comparison will describe how offload times differ among the three hospitals.

Analysis in Brief

Offload times are typically skewed, with a long tail of very long waits, so results will be reported as medians and as the share of arrivals exceeding 30 minutes, the interval used in emergency medical services guidance (Cooney et al., 2011). The association will be estimated with regression models suited to skewed times and to a yes-or-no outcome for exceeding 30 minutes, with standard errors that account for arrivals in the same hour.

What the Approach Cannot Show

The design can show whether offload times are longer when boarding is higher. It cannot show that reducing boarding would shorten offload times, because other conditions that rise with boarding, such as overall emergency department volume, may explain part of the association even after adjustment. It cannot measure the effect of offload delay on ambulance response times in the community or on patient outcomes. And it cannot explain why one hospital performs differently from another beyond the variables recorded. Li et al. (2019) note that offload delay has many contributing factors, so a single exposure will not account for all of it. These limits will be stated in the prospectus so that reviewers judge the project against what it can deliver.

References

Carter, A. J. E., Overton, J., Terashima, M., & Cone, D. C. (2014). Can emergency medical services use turnaround time as a proxy for measuring ambulance offload time? The Journal of Emergency Medicine, 47(1), 30-35. https://doi.org/10.1016/j.jemermed.2013.08.109

Cooney, D. R., Millin, M. G., Carter, A., Lawner, B. J., Nable, J. V., & Wallus, H. J. (2011). Ambulance diversion and emergency department offload delay: Resource document for the National Association of EMS Physicians position statement. Prehospital Emergency Care, 15(4), 555-561. https://doi.org/10.3109/10903127.2011.608871

Greaves, T., Mitchell, M., Zhang, P., & Crilly, J. (2017). The impact of an emergency department ambulance offload nurse role: A retrospective comparative study. International Emergency Nursing, 32, 39-44. https://doi.org/10.1016/j.ienj.2016.12.005

Li, M., Vanberkel, P., & Carter, A. J. E. (2019). A review on ambulance offload delay literature. Health Care Management Science, 22(4), 658-675. https://doi.org/10.1007/s10729-018-9450-x

The Walden DDHA 9500 Week 7 instructions

Approach outlines usually ask you to describe how your project will be carried out, in one or two pages. Order the headings the way a reviewer checks them. Name the design plainly and show that it matches the verb in your purpose statement. Separate data that already exist from data you would have to gather, and keep the second list short. State the unit of analysis, since everything else follows from it. Describe the comparison you will make and the factors you will adjust for. Give a brief sense of the analysis without a full methods chapter. Close with a paragraph on what the approach cannot show, so reviewers judge the project against what it can deliver rather than what they might hope for.

How this DDHA 9500 Week 7 example is built

The outline names the design and explains its fit with the purpose verb. A section lists hospital and ambulance data produced in normal operations and how they will be linked. A section lists two items to be gathered: offload role dates and a validation chart review. The unit section defines each adult arrival's offload time and exposure, citing the caution against turnaround time. The comparison section explains within-hospital comparisons across boarding levels with adjustments. A brief analysis section describes medians, the share over 30 minutes and models suited to skewed times. The closing section names what the design cannot show: causation, community or patient outcomes and full explanations of differences between hospitals.

DDHA 9500 Week 7 rubric: what earns full marks

Approach outlines are graded on fit and realism. Markers check that the design matches the purpose verb and that the outline does not promise more than the data can support. Separating existing data from data to be gathered shows feasibility thinking, and a short second list is a good sign. The unit of analysis must be clear. The comparison and adjustments should be specific. Analysis can be brief but should suit the data. A paragraph on what the approach cannot show is often a distinguishing element. Sources should justify specific choices, and the outline should be concise and organized in the order reviewers use.

Common DDHA 9500 Week 7 mistakes, and how to avoid them

Students often propose a design bigger than their question, adding surveys or interviews that nothing in the purpose requires. Cut what the question does not need. List your data sources by who holds them. Say clearly what one observation is. Make your comparison specific and name the factors you will adjust for. Keep analysis brief here. Admit what the design cannot show; reviewers will notice if you do not. If your approach outline keeps growing, we can help you size it to your question. Ask a colleague to read only your purpose and your outline; if they expect a method you did not describe, one of the two needs to change.

Get a DDHA 9500 Week 7 example written to your instructions

Provide the prompt, the rubric and the purpose sentence the approach has to serve, and an outline with design, data, unit, comparison and limits comes back to you. The first is free and arrives in 24 to 48 hours. Access arrangements, participants and approvals belong to the candidate and are not drafted at this desk.

More DDHA 9500 papers and DHA samples

DDHA 9500 Week 7 questions, answered

Where can I find a free DDHA 9500 Week 7 sample paper?

The offload project's approach outline is free to read on this page.

What design does the DDHA 9500 Week 7 example use?

A quantitative, retrospective observational design matched to the purpose verb "examine the association."

Which data must be gathered on purpose?

Dates when hospitals had a dedicated offload role and a 100-arrival chart review to check agreement between sources.

What comparison does the outline make?

Offload times across hours with different boarding levels, within each hospital, with adjustments for time and offload roles.

What can the approach not show?

That reducing boarding would shorten offload times, or effects on community response times and patient outcomes.