NURS 8740 Week 4 Run Chart Analysis Example

Doctoral Seminar IV Walden University Free custom sample in 24 to 48h

This NURS 8740 Week 4 run chart example plots twelve weekly points for how often ventilated adults in a 14-bed ICU reached the edge of the bed, then reads them by published rules. Walden NURS 8740 asks DNP students to show change over time rather than a two-number comparison, and the chart freezes the median of four baseline weeks at 22.2% and carries it across the series. The figure annotates the sedation order set, two improvement cycles and a two-day admissions closure, and an APA table lists every plotted point. The reading applies Perla and colleagues' rules: eight protocol weeks above the median form a shift, five rising points form a trend and two runs are too few for twelve points. The paper declines to separate the protocol from the sedation change and names the p-chart, after Benneyan and colleagues, as the next display.

CourseNURS 8740 Doctoral Seminar IV
WeekWeek 4
Paper typeRun chart with written reading
LengthAbout 1,100 words, 7 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramDoctor of Nursing Practice (DNP)
UpdatedOctober 2026

Free sample paper for NURS 8740 Week 4

1

Sitting-Up Days Week by Week: A Run Chart of the Mobilization Measure With the Baseline Median Carried Forward and a Reading by the Rules

Student Name

College of Nursing, Walden University

NURS 8740: Doctoral Seminar IV

Instructor Name

Month Day, Year

What this page is doingThe title names the measure and the method of reading it, and it never calls the display a run chart example, because the content is the point.
2

Sitting-Up Days Week by Week: A Run Chart of the Mobilization Measure With the Baseline Median Carried Forward and a Reading by the Rules

Why a Run Chart and Not a Before-and-After Comparison

A before-and-after comparison reduces the project to two numbers: 22% of qualifying ventilator days reached sitting at the bedside in the baseline, and 40% in the first eight protocol weeks. Those two numbers cannot show when the change happened, whether it held or whether the baseline itself was drifting. A run chart plots every week in the order it was collected, so a reader can see the pattern and apply rules that distinguish a real signal from week-to-week noise (Perla et al., 2011). This paper presents the chart for the project's outcome measure, explains how it was built and reads it by the rules chosen before the data existed.

What this page is doingThe opening shows what a two-number comparison hides, which is the reason the assignment asks for a chart at all.
3

How the Chart Is Built

Measure and base. The vertical axis is the weekly percentage of qualifying ventilator days on which the highest recorded level on the ICU Mobility Scale was 3 or above (Hodgson et al., 2014). The base is all qualifying days that week, including days with a failed screen and days with no level recorded. The axis label states both the measure and the base.

Order. The horizontal axis is calendar week, starting Monday, in collection order. Points are never sorted by value.

Median. The center line is the median of the four baseline weeks only, 22.2%, extended as a flat line across all twelve weeks. Recalculating the median across the whole series would pull it toward the protocol weeks and hide the very shift the chart is meant to detect.

Annotations. Three events are written directly on the chart at the week they occurred: the start of the new sedation order set on February 1, the first improvement cycle (night screen only) on February 2 and the second cycle (respiratory therapist call) on February 9. A fourth note marks the week of February 23, when the unit was closed to admissions for two days during a water main repair.

Title. The chart's title states its content: Weekly share of qualifying ventilator days reaching sitting at the bedside, 14-bed ICU, January 5 to March 28.

What this page is doingEach building decision is stated with its reason, especially the frozen baseline median, which is the one detail a grader checks first.
4

The Data Behind the Chart

Figure 1 is the chart, and Table 1 lists the plotted points so the chart can be checked against its numbers.

Table 1

Weekly Points Plotted on the Run Chart

Week startingPeriodDays reaching level 3 or aboveQualifying daysPercentageAbove or below baseline median
January 5Baseline52321.7Below
January 12Baseline42119.0Below
January 19Baseline62425.0Above
January 26Baseline52222.7Above
February 2Cycle 162227.3Above
February 9Cycle 282532.0Above
February 16Cycle 292437.5Above
February 23Cycle 2102343.5Above
March 2Cycle 292142.9Above
March 9Cycle 2112445.8Above
March 16Cycle 2102245.5Above
March 23Cycle 2122548.0Above

Note. Baseline median = 22.2%, the midpoint of 21.7% and 22.7%. No point falls on the median. Totals: baseline 20 of 90 days; protocol weeks 75 of 186 days.

Figure 1

Weekly Share of Qualifying Ventilator Days Reaching Sitting at the Bedside, 14-Bed ICU, January 5 to March 28

015304560Baseline median 22.2Jan 5Jan 12Jan 19Jan 26Feb 2Feb 9Feb 16Feb 23Mar 2Mar 9Mar 16Mar 23Cycle 1Cycle 2ClosureWeek starting% of qualifying days at level 3 or above

Note. The dashed horizontal line is the median of the four baseline weeks, carried forward. The dotted vertical line marks February 1, when the new sedation order set began, one day before the first improvement cycle. Closure = admissions closed for two days during a water main repair.

What this page is doingPrinting the points under the chart lets any reader confirm the median and every run, which is part of display literacy at this level.
5

Reading the Chart by the Rules

Four probability-based rules for run charts were adopted in the methods (Perla et al., 2011): the shift rule, which looks for a stretch of six or more points that all stay above, or all stay below, the center line; the trend rule, which looks for five or more points climbing steadily or falling steadily; the runs rule, which compares how often the line crosses the median with what chance would give for this many points; and the astronomical point, one value so unlike its neighbors that anyone would notice it. Points that land exactly on the median are skipped when counting shifts and runs, which mattered for none of the twelve points here.

Shift. All eight protocol weeks lie above the baseline median. Eight consecutive points on one side is a shift, and it begins in the week of February 2.

Trend. From the week of January 26 to the week of February 23, five consecutive points rise (22.7, 27.3, 32.0, 37.5 and 43.5), and the point for March 2 then falls slightly. Five points all going up meets the trend rule.

Runs. No point falls on the median, so all twelve count. The series has two runs: two points below the median, then ten above. For twelve points, the published table gives a lower limit of three runs, so two runs are too few to be explained by chance. The rise is therefore a signal on three rules, not one.

Astronomical point. None. The week of the admissions closure, February 23, sits within the pattern of the weeks around it.

The reading is therefore that the measure shifted upward in the first protocol week and rose for four weeks before leveling near 45%. The chart does not say why. The sedation order set and the protocol began within a day of each other, and the chart cannot separate them; the annotation exists so that nobody reading it can miss that.

What this page is doingEvery claim in the reading is tied to a named rule, and the last paragraph keeps the chart from saying more than it can about cause.
6

When a Control Chart Would Replace This

A run chart is the right first display for a small unit with a short series. Once the project has twenty or more points in a stable period, a p-chart with control limits would allow sharper statements about whether a single week is unusual, because the limits account for the changing number of qualifying days each week (Benneyan et al., 2003). The plan is to switch to a p-chart in the monthly phase, after April, using the protocol weeks as the new baseline if the level holds.

Until then, the run chart will be updated weekly at the staff huddle board and monthly in the project file, with the same frozen baseline median and the same annotation conventions, so that the April point and every later one can be read against an unchanged reference. Any new practice change on the unit, such as a different sedation target or a staffing change on weekends, will be written on the chart in the week it starts.

What this page is doingClosing with the next display shows the writer knows the limits of the current one, which is the judgment the week is building toward.
7

References

Benneyan, J. C., Lloyd, R. C., & Plsek, P. E. (2003). Statistical process control as a tool for research and healthcare improvement. Quality and Safety in Health Care, 12(6), 458-464. https://doi.org/10.1136/qhc.12.6.458

Hodgson, C., Needham, D., Haines, K., Bailey, M., Ward, A., Harrold, M., Young, P., Zanni, J., Buhr, H., Higgins, A., Presneill, J., & Berney, S. (2014). Feasibility and inter-rater reliability of the ICU Mobility Scale. Heart & Lung, 43(1), 19-24. https://doi.org/10.1016/j.hrtlng.2013.11.003

Perla, R. J., Provost, L. P., & Murray, S. K. (2011). The run chart: A simple analytical tool for learning from variation in healthcare processes. BMJ Quality & Safety, 20(1), 46-51. https://doi.org/10.1136/bmjqs.2009.037895

The Walden NURS 8740 Week 4 instructions

Run chart work in this seminar usually asks you to display your main measure over time and interpret it by stated rules. Plot points in collection order with the measure and its base named on the axis. Calculate the median from the baseline period only and extend it across the chart, so later points can be judged against it. Annotate practice changes and unusual events on the chart at the point where they occurred. Give the chart a title that says what it shows. Then apply each run chart rule in turn, say whether it was met and identify the points involved. Finish by stating what the chart can and cannot tell a reader about cause, and when a different chart would be more appropriate.

How the NURS 8740 Week 4 example is put together

The paper opens by contrasting a before-and-after pair, 22% and 40%, with a chart that shows timing and stability, citing Perla and colleagues. A building section explains the measure and base from Hodgson and colleagues, collection order, the frozen median, four annotations and a descriptive title. Figure 1 shows the twelve points with the dashed median and a dotted line at February 1, and Table 1 lists the counts behind each point. The reading section defines four rules, then reports a shift, a trend from January 26 to February 23, too few runs and no astronomical point. It ends by refusing to attribute the rise to the protocol alone. The final section plans a switch to a p-chart, citing Benneyan and colleagues.

Reading the NURS 8740 Week 4 rubric

Faculty generally check one detail first: whether the median comes from the baseline alone. A median recalculated across the whole series hides the shift the chart should reveal. Axis labels that name the measure and its base, collection order and a title that states content are also expected. The written reading is graded separately, and credit goes to interpretation tied to named rules with the points identified, not to phrases like steady improvement. Annotations of other changes on the unit earn credit because they show the writer knows what else could explain a pattern. Knowing when to move to a control chart signals advanced understanding. APA formatting of the figure and table completes the assessment.

NURS 8740 Week 4 help from the desk

Run charts often recalculate the median after every new point, so a real shift slowly disappears into the center line. Others sort points or skip weeks with no data, which breaks the time order. Some describe the chart as showing improvement without applying a single rule. A frequent mistake is counting points on the median when testing for shifts and runs. Before writing the reading, print the chart, mark the median, count runs by hand and check each rule against the published table. Then write what else changed on the unit in the same weeks. Our writers can build a run chart for your project's measure with a rule-based reading and a table of the plotted points.

Get a NURS 8740 Week 4 example written to your instructions

Send the measure, how often it was collected, roughly how many periods sit either side of the change, and any chart template the prompt attached. A matched example lands back within 24 to 48 hours, and the first custom one is free. The display is drawn to the prompt supplied rather than lifted from a stock pattern kept on file.

More NURS 8740 papers and DNP samples

NURS 8740 Week 4 questions, answered

Where can I find a free NURS 8740 Week 4 sample paper?

The figure, the table of plotted points and the rule-by-rule reading all appear above, open to read and not behind any fee.

What is the baseline median on the NURS 8740 Week 4 chart?

22.2%, the midpoint of the two middle baseline weeks, calculated from the four baseline weeks only and carried forward unchanged across all twelve weeks.

Which run chart rules did the data meet?

Three: a shift of eight points above the median, a trend of five rising points ending in late February and too few runs, two where twelve points need at least three.

Why doesn't the chart prove the protocol worked?

A lighter sedation order set began one day before the protocol, and a single-unit run chart cannot separate two changes that started together.

When would a control chart replace the run chart?

Once about twenty stable points exist, the paper plans a p-chart with limits that adjust for the changing number of qualifying days each week.