Stakeholder Plan: Electronic Procedural Consent, Thirteen Roles Assessed, Four Managed Closely and the Engagement Gaps That Drive the Strategy
Student Name
College of Nursing, Walden University
NURS 6441: Project Management: Healthcare Information Technology
Instructor Name
Month Day, Year
Stakeholder Plan: Electronic Procedural Consent, Thirteen Roles Assessed, Four Managed Closely and the Engagement Gaps That Drive the Strategy
Approach
This plan identifies the people whose support, resistance or silence could change the outcome of the electronic procedural consent project, and sets out how each will be engaged. Stakeholders are named by role, never by person, because a plan that assesses a colleague's resistance is a document about someone who never agreed to be assessed. Salience theory suggests that stakeholders command attention according to their power, the legitimacy of their claim and the urgency of their demands (Mitchell et al., 1997), and each assessment below records the evidence for those judgments, drawn from the charter discussions, the scope statement and early design meetings.
Stakeholder Register
Table 1
Roles, Interests, Blocking Power and Evidence
| Role | Cares about | Can block | Evidence |
|---|---|---|---|
| Chief nursing officer (sponsor) | Consent completeness, fewer delays, nursing workload | Funding, milestones | Signed charter; attends steering meetings |
| Perioperative medical director | Surgeon time, case starts | Physician adoption | Co-leads design; raised pre-op time concern |
| Chiefs of surgery (three hospitals) | Speed of consent conversation, liability | Surgeon use of tablets | Two asked to keep paper in first design meeting |
| Anesthesiologists | Anesthesia consent unchanged | Little directly; can object at time-out | Anesthesia consent excluded from scope |
| Perioperative nurse managers (site leads) | Staffing, training time | Go-live readiness sign-off | Named in charter as site leads |
| Pre-procedure nurses | Workflow in bays, tablet availability | Adoption by workaround | Raised charging and wireless concerns |
| Procedural nurses in radiology, endoscopy and catheterization | Consent status at time-out | Adoption at time-out | Asked how status will display |
| Language services manager | Interpreter access and quality | Interpreter workflow sign-off | Owns deliverable D4 |
| Consent committee chair | Legal content unchanged | Form approval | Accepts deliverable D1 |
| Legal counsel | Signature validity, record retention | Wording and signature method | Required review of signature capture |
| Clinical applications manager | Build quality, analyst capacity | Technical go-live decision | Accepts deliverable D2 |
| Information security officer | Device security | Tablet deployment | Requires device management enrollment |
| Patient and family advisory council | Understanding and dignity during consent | Little directly; public influence | Asked to review tablet screens |
Influence and Interest
Plotting influence against interest places four roles in the high-influence, high-interest quadrant, managed closely: the chief nursing officer, the perioperative medical director, the chiefs of surgery and the consent committee chair. Legal counsel and the information security officer sit in high influence, lower interest and are kept satisfied with targeted reviews. Pre-procedure nurses, procedural nurses, site leads and the language services manager sit in high interest, moderate influence and are kept closely involved in design and training. Anesthesiologists, the clinical applications manager's broader team and the patient advisory council are kept informed. The grid summarizes where each role sits; it does not say what to do, which is the job of the engagement assessment that follows.
Engagement Gaps
Table 2
Current and Desired Engagement
| Role | Current | Desired | Gap |
|---|---|---|---|
| Chief nursing officer | Supportive | Leading | One level |
| Perioperative medical director | Supportive | Leading | One level |
| Chiefs of surgery | Resistant | Supportive | Two levels |
| Consent committee chair | Neutral | Supportive | One level |
| Legal counsel | Neutral | Supportive | One level |
| Pre-procedure nurses | Neutral | Supportive | One level |
| Anesthesiologists | Unaware | Neutral | One level |
| Patient and family advisory council | Unaware | Supportive | Two levels |
Levels: unaware, resistant, neutral, supportive, leading. Roles already at their desired level are omitted.
Strategies for the Four Managed Closely
Chief nursing officer, supportive to leading. The sponsor supports the project but has delegated steering attendance. The strategy is to ask the sponsor to open the surgeon design session and to state, at the first steering meeting, that paper will be retired ninety days after each go-live. A sponsor who speaks publicly about the decision makes it harder for others to wait it out.
Perioperative medical director, supportive to leading. The director shares the surgeons' concern about pre-procedure time. The strategy is to make that concern the director's to solve: the director chairs a timing test in which three surgeons complete tablet consents in a simulated bay, and the results decide whether the consent screen needs simplifying before go-live.
Chiefs of surgery, resistant to supportive. Two chiefs asked to keep paper, citing time and a belief that tablets make the conversation feel less personal. The strategy is to answer both with evidence and design: invite them to the timing test, show that the consent conversation happens before the tablet is handed over, and offer to let each chief name one surgeon to review the screens. Resistance to clinical information systems often reflects concerns about work and professional identity rather than technology, and addressing it depends on communication and participation (Lorenzi & Riley, 2000).
Consent committee chair, neutral to supportive. The chair's interest is that legal content does not change. The strategy is to show the chair each configured form beside its approved paper version, invite the chair to accept deliverable D1 personally and give the chair authority to stop go-live if any form differs from the approved wording. Giving a neutral stakeholder real authority over the thing they care about is often the fastest route to support.
Review
Engagement levels will be reassessed at each steering meeting, and any role that moves away from its desired level will be discussed with the sponsor. Project management guidance treats stakeholder engagement as continuing work across the life of a project rather than an analysis done once at the start (Project Management Institute [PMI], 2021). The plan will be revised before each hospital's go-live, since site leads, surgeons and nurses at each hospital may hold different views.
References
Lorenzi, N. M., & Riley, R. T. (2000). Managing change: An overview. Journal of the American Medical Informatics Association, 7(2), 116-124. https://doi.org/10.1136/jamia.2000.0070116
Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886. https://doi.org/10.5465/amr.1997.9711022105
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.).
Reading the NURS 6441 Week 7 instructions
This week's prompt usually calls for a stakeholder analysis and engagement plan: identify stakeholders, assess their interest and influence, determine current and desired engagement and describe strategies to close the gaps. Many sections ask for a grid or matrix and a narrative. Plans typically run three to five pages. Use roles rather than names; assessing named colleagues creates a document that cannot be shared. Record the evidence behind each assessment, such as something said in a meeting or a responsibility in the charter. Focus detailed strategies on the few roles that can change the outcome. If the prompt names a model, such as a salience or power-interest framework, use its terms consistently.
Inside the NURS 6441 Week 7 example
The approach section explains the use of roles and cites salience theory on power, legitimacy and urgency. Table 1 lists thirteen roles with interests, blocking power and evidence. A paragraph places each role in an influence and interest quadrant and notes that the grid summarizes rather than prescribes. Table 2 shows current and desired engagement for eight roles on a five-level scale. Four paragraphs give strategies for the roles managed closely, citing work on managing change in clinical information systems for the chiefs of surgery. A review section sets reassessment at each steering meeting. Stakeholders outside the scope, such as anesthesiologists, still appear in the register.
Where the marks sit in the NURS 6441 Week 7 rubric
Stakeholder plan rubrics usually score identification of stakeholders, analysis of interest and influence, engagement assessment, strategies, evidence and presentation. Identification rewards including roles that can block quietly, not only the obvious sponsor and users. Analysis earns credit when it is supported by evidence. Engagement assessment is often required and rewards a current-versus-desired comparison. Strategies are scored on specificity and fit to each role's interests. Presentation covers tables and the grid. Many rubrics penalize plans that name real individuals. Some sections also ask for the evidence behind each assessment, which the register's final column provides. Graders often check that strategies match the gaps shown in the engagement table rather than restating the grid.
NURS 6441 Week 7 help: mistakes that cost marks
The most common mistake is stopping at the grid, which shows where stakeholders sit but not what to do. Another is naming real people and assessing their attitudes. Some plans give every stakeholder the same generic strategy, such as regular updates. Others leave out patients or roles outside the project's scope who can still affect it. Record evidence for each assessment, find the engagement gaps and write specific strategies for the few roles that matter most, including what you will ask of them and what you will give them. Also plan when you will reassess engagement, since attitudes change as a project moves toward go-live. Keep the plan shareable by describing roles only.
Get a NURS 6441 Week 7 example written to your instructions
Send the stakeholder prompt, the project your classroom assigned, and the rubric. A NURS 6441 stakeholder plan built for a composite rollout comes back carrying a register, a grid, an engagement gap table and tailored strategies for the roles that can actually obstruct. Roles only, never colleagues from your own workplace. The first sample is free, inside 24-48h.
More NURS 6441 papers and MSN samples
- NURS 6441 Week 1: Discussion post
- NURS 6441 Week 2: Project charter
- NURS 6441 Week 3: Scope statement
- NURS 6441 Week 4: Work breakdown
- NURS 6441 Week 5: Schedule
- NURS 6441 Week 6: Risk register
- NURS 6441 Week 8: Communication plan
- NURS 6441 Week 9: Discussion post
- NURS 6441 Week 10: Go-live plan
- NURS 6441 Week 11: Lessons learned
- NURS 6421 Week 7: Future state map
- NURS 6501 Week 7: Hepatobiliary pathway discussion
- NURS 6412 Week 7: Retention plan
- NURS 6512 Week 7: Auscultation findings write-up
NURS 6441 Week 7 questions, answered
Should I name real people from my organization?
No, and not only for privacy reasons. A plan assessing a named colleague's resistance and influence is a document about somebody who never agreed to be assessed, and it cannot be shown to anyone. Roles carry every analytical benefit without that problem, so the example uses them from the register down and says so in a footnote. Role labels lose nothing analytically.
Is the influence and interest grid enough on its own?
It is a summary, not an analysis, and submissions that stop at the grid tend to lose the rows about strategy and evidence. The grid says where somebody sits; it never says what to do. The example places it between the register and the engagement gaps, which is the position where it actually helps a reader. Placement is a finding; a strategy is a decision.
How many stakeholders should the plan cover?
Enough to include the roles that can obstruct quietly, which is usually more than the obvious sponsor and end users. Thirteen roles appear in the example, but only four receive detailed strategies. That split matters more than the total, because a plan giving equal attention to everyone gets carried out for nobody. Quiet obstructors are the entries most registers leave out.
Where can I find a free NURS 6441 Week 7 sample paper?
The complete stakeholder plan, register, grid discussion, engagement table and four strategies, can be read free on this page. A plan for the roles in your own project can be drafted on request.
How many stakeholders should get detailed strategies in NURS 6441?
Usually three to five, the roles with the most influence and interest. Others can be kept informed or satisfied with lighter approaches described briefly.