MGMT 8415M Week 9 Dilemma Paper Example

Socially Conscious Leader Walden University Free custom sample in 24 to 48h

This MGMT 8415M Week 9 dilemma paper example sets two defensible duties against each other at a composite vegetable processor: to a village whose largest employer is the company's 1958 plant, with 140 year-round and about 450 seasonal jobs, and to township households whose wells the plant's spray fields help load with nitrate. Kidder's right-versus-right framing and Badaracco's defining moments set up the conflict. Three third options are tested honestly, and anaerobic pretreatment at $4.2 million comes closest. As the Walden MGMT 8415M brief requires of PhD in Management writers, the paper chooses, keeping the plant open with pretreatment at a lower return, and states what the losing claims are still owed and what the choice costs.

CourseMGMT 8415M Socially Conscious Leader
WeekWeek 9
Paper typeDilemma paper
LengthAbout 830 words, 6 pages
FormatAPA 7 student paper
SchoolWalden University
ProgramPhD in Management
UpdatedOctober 2026

Free sample paper for MGMT 8415M Week 9

1

Jobs in the Village or Clean Water in the Township: A Dilemma Paper on Whether a Processor Should Keep Its Oldest Plant Running While Its Spray Fields Load Neighbors' Wells, With a Third Option Tested, a Choice and What the Losing Claim Is Still Owed

Student Name

Walden University

MGMT 8415M: Socially Conscious Leader

Instructor Name

Month Day, Year

What this page is doingThe title states both claims in parallel form, signals that a third option was tried and promises an account of what the losing side is owed.
2

Jobs in the Village or Clean Water in the Township: A Dilemma Paper on Whether a Processor Should Keep Its Oldest Plant Running While Its Spray Fields Load Neighbors' Wells, With a Third Option Tested, a Choice and What the Losing Claim Is Still Owed

Two Duties, Stated Alike

Sawyer Creek Foods' board must decide by September 2026 whether to keep the Ellery plant operating at full seasonal volume for the next five years. Two obligations bear on the decision.

The first is owed to Ellery's workers and the village. The plant employs 140 people year-round and about 450 seasonally, making it the village's largest employer by far. Many families have arranged their lives around it over decades, and the village's water and sewer utility depends on the plant's fees. The ground of the duty is reliance the company has invited: it has recruited, trained and promised continuity in public statements for years.

The second is owed to about 40 households in the surrounding township whose private wells draw from groundwater the plant's wastewater spray fields help load with nitrate. The ground is harm: the plant, by its own operations, contributes to contamination above the drinking water standard in 14 wells. The term's externality analysis estimated the spray fields' share at 30 to 60 percent. The stakes for those households are not speculative: the federal standard exists because of the risk to infants, and a review of later research found possible links to other outcomes as well (Ward et al., 2018).

What this page is doingBoth obligations are stated in the same form, with ground and claimant, so neither is set up to lose.
3

Framing the Conflict

Kidder (1995) distinguished moral temptations, right versus wrong, from genuine dilemmas, right versus right, in which two core values each make a legitimate claim. He described common patterns, among them individual versus community and short term versus long term. This decision has elements of both: the village's economic life against the township's water, the plant's present operation against the aquifer's future. Badaracco (1997) argued that such decisions, which he called defining moments, reveal and shape the character of the people and organizations that make them, and that they cannot be settled by applying a rule. Both accounts warn against treating one claim as obviously trivial.

A Third Option, Tried Honestly

Before choosing, the paper tests whether a third option avoids the conflict. Three were examined. Building an anaerobic pretreatment system at Ellery would remove most nitrogen before spraying, at an estimated capital cost of $4.2 million and about $300,000 a year to operate. Trucking part of the wastewater to the Ransom Falls plant's larger treatment system would reduce loading by about a third at about $450,000 a year. Rotating spray fields to land farther from the township would require leasing new acreage the company has not been able to secure.

Pretreatment comes closest to dissolving the dilemma. But the company's analysis shows that adding its cost to Ellery's operations would leave the plant losing money in two of the last five seasons, and the board has signaled that a plant losing money in average years will be closed. The third option therefore reduces the conflict without removing it: the company can protect the water and keep the plant, but only by accepting a lower return on Ellery than it accepts elsewhere.

What this page is doingThe paper tests whether the dilemma can be dissolved before choosing, since a false dilemma should not be resolved by sacrifice.
4

The Choice

The paper recommends keeping Ellery open with pretreatment installed, accepting the lower return, and treating the township's water as the claim that limits how the plant may operate rather than whether it may operate. The reasoning runs from the grounds. The harm to well users is ongoing and physical, and it lands on households that never agreed to it and cannot avoid it except at their own expense. The reliance of Ellery's workers is real but can be honored as long as the plant runs. Of the two, the duty not to cause physical harm is more stringent, but it does not require closing the plant; it requires stopping the harm. Where the company can do both, it should, even at a lower return.

What the Losing Claim Is Still Owed

The losing claim here is in part the shareholders' claim to the plant's former return and in part the township's claim to immediate relief, since pretreatment will take two seasons to build. During construction, the company owes the township drinking water treatment for every affected household and testing every six months. If the board instead decides to close Ellery, Ellery's workers would be the losing claim, and they would be owed what reliance requires: a year's notice, priority hiring at Ransom Falls with transport during the season, severance scaled to years of service and support for the village utility's transition.

The Price of Choosing

Pretreatment costs $4.2 million up front and $300,000 a year, reducing Ellery's average annual contribution by about a third. Interim water treatment adds about $20,000. The price of the alternative, closing Ellery, would fall on 590 workers and a village; the price of continuing without pretreatment would fall on households drinking water above the standard.

References

Badaracco, J. L., Jr. (1997). Defining moments: When managers must choose between right and right. Harvard Business School Press.

Kidder, R. M. (1995). How good people make tough choices: Resolving the dilemmas of ethical living. William Morrow.

Ward, M. H., Jones, R. R., Brender, J. D., de Kok, T. M., Weyer, P. J., Nolan, B. T., Villanueva, C. M., & van Breda, S. G. (2018). Drinking water nitrate and human health: An updated review. International Journal of Environmental Research and Public Health, 15(7), Article 1557. https://doi.org/10.3390/ijerph15071557

The Walden MGMT 8415M Week 9 instructions

Week 9 asks you to analyze a decision in which two legitimate obligations collide. State the decision and both duties in parallel form, each with its ground and claimant. Frame the conflict using a named approach, often Kidder's right-versus-right dilemmas. Before choosing, test honestly whether a third option dissolves the conflict. Then make the choice and argue it from the grounds of each duty. A section on the losing claim should state what is still owed to it, such as compensation, transition support or a later commitment. Close with the decision's cost. Expect six to eight pages, graded heavily on candor about what is lost. Price every option you test.

Inside the MGMT 8415M Week 9 example

The sample states the duty to the village, grounded in invited reliance, and the duty to well users, grounded in harm, in the same form. Kidder and Badaracco frame the conflict. The third-option section tests pretreatment, partial trucking of wastewater and rotating spray fields, finding pretreatment reduces but does not remove the conflict because it lowers the plant's return. The choice keeps the plant with pretreatment, treating the harm duty as more stringent and as a limit on operations. The losing-claim section sets out interim water treatment for the township during construction and, if the board closes the plant instead, what workers would be owed. A price section closes it.

Where the marks sit in the MGMT 8415M Week 9 rubric

Honesty about the losing claim is what this paper is graded on most. Papers that dissolve every dilemma with a convenient third option, or choose without acknowledging what is lost, score low. Graders look for both duties stated with equal care, a genuine test of alternatives with costs, and a choice argued from grounds rather than preference. What remains owed to the losing claim must be spelled out concretely. Use of Kidder or a similar framework should shape the analysis. A clear price for the decision completes the argument. Good organization and references round out the Week 9 grade. Choosing the third option without showing its cost is treated as avoiding the dilemma.

MGMT 8415M Week 9 help: mistakes that cost marks

The commonest weakness is treating one duty as obviously weaker. Write both duties in the same sentence structure, with ground and claimant, before deciding anything. Look hard for a third option and price it; if it works, say so, and if it only reduces the conflict, explain why. Make your choice from the grounds, not from which claimant is more sympathetic. Then spend real effort on what the losing claim is still owed. State the cost of your choice plainly. A tutor can play the advocate for the side you rule against, and the plant dilemma above shows the finished paper. Keep the two duties' descriptions the same length so neither looks weaker on the page.

Get a MGMT 8415M Week 9 example written to your instructions

Bring a dilemma from your readings, your workplace or the news, together with the Week 9 prompt and rubric, and the dilemma paper is delivered in 24 to 48 hours, first one free. A workplace case is described by role and situation only, never by name, and a news case is cited to its reporting.

More MGMT 8415M papers and PhD in Management samples

MGMT 8415M Week 9 questions, answered

Where can I find a free MGMT 8415M Week 9 sample paper?

Read the plant and wells dilemma paper above; that is the Week 9 sample.

What two duties conflict in the MGMT 8415M Week 9 sample?

A duty to the village's workers based on invited reliance and a duty to well users based on harm.

What third options does the sample test?

Anaerobic pretreatment, trucking wastewater to another plant and moving spray fields, none of which fully dissolves the conflict.

What does the sample choose?

To keep the plant open with pretreatment, accepting a lower return, because the harm duty limits how the plant may operate.

What is the losing claim still owed?

Interim water treatment for affected households, and if the plant closed, notice, priority hiring, severance and utility support for the village.