| Course | HRMG 3001 Human Resource Management |
|---|---|
| Week | Week 7 |
| Paper type | Training proposal |
| Length | About 800 words, 5 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | BS in Business Administration |
| Updated | October 2026 |
Free sample paper for HRMG 3001 Week 7
Training a Second CNC Router Operator at Birchline Cabinet Works: The Evidence of Idle Days, a Three-Level Needs Analysis, a Six-Week Plan and How the Shop Will Know It Worked
Student Name
Walden University
HRMG 3001: Human Resource Management
Instructor Name
Month Day, Year
Training a Second CNC Router Operator at Birchline Cabinet Works: The Evidence of Idle Days, a Three-Level Needs Analysis, a Six-Week Plan and How the Shop Will Know It Worked
The Evidence
Birchline Cabinet Works, the composite Spokane cabinet shop from earlier weeks, has one CNC router operator. The router cuts every cabinet part the shop builds. The production log for the past twelve months shows the router idle on eleven working days when the operator was sick, on vacation or at a family emergency. On eight of those days, at least one order shipped late, and on most of them the shop lead reported reassigning assemblers to sweeping and sanding because there were no cut parts to assemble. At six assemblers and about $26 an hour, a day of idle assembly costs the shop more than $1,200 in wages alone, before late-delivery costs.
Needs Analysis
Goldstein and Ford (2002) recommend examining a training need from three angles: the organization as a whole, the work itself and the individual worker.
Organizational level. The gap matters now because the shop has taken on two contractors who order kitchens on tight schedules, and the owner plans to add a second shift next year. A shop that stops whenever one person is out cannot promise contractors reliable dates.
Task level. Operating the router involves four tasks: loading cutting files from the design software and checking them against the work order; setting up tools, including changing bits and measuring tool length; loading and securing sheet material on the vacuum table; and running a test cut and checking dimensions before running a full sheet. The current operator also performs basic maintenance, such as cleaning the dust collection and checking the vacuum pump, and knows how to recover from a stopped job.
Person level. Of the six assemblers, two already have related skills. One has used the design software to check drawings, and one ran a smaller router at a previous job. Both have expressed interest. Neither has set tools on this machine or run a full sheet. Choosing two trainees rather than one is deliberate. If only one assembler were trained, the shop would simply move its single point of failure from one person to another during the weeks the original operator is away, and a single trainee who left would take the whole investment with them.
The Training Plan
Trainer. The current router operator, with two hours a week of support from the machine maker's technician by video call during the first two weeks.
Trainees. The two assemblers identified above.
Schedule. Six weeks, with each trainee spending two half-days a week at the router. Weeks 1 and 2: safety, emergency stops and loading files, with the trainee watching and then loading files while the operator runs the machine. Weeks 3 and 4: tool setup and sheet loading, with the trainee doing each step and the operator checking. Weeks 5 and 6: full runs, with the trainee running the machine and the operator present but not intervening unless needed.
Materials. The machine maker's operator manual, a one-page checklist for each task written by the operator and a log in which trainees record each job they run.
Cost. About 96 hours of trainee time and 96 hours of operator time away from regular work, plus the technician's support, which is included in the shop's service contract. At current wages, the time costs about $5,200.
Measurement
The shop will know the training worked at two levels. First, each trainee must run a standard kitchen job alone, from file loading to final cut, with no dimensional errors, by the end of week 6. Second, over the following twelve months, the log should show no days the router sits idle for lack of an operator. Kirkpatrick and Kirkpatrick (2006) describe the second kind of measure, a change in business results, as the most meaningful evidence that training worked, because it shows the new skills are being used.
Risks and How the Plan Handles Them
Two risks stand out. Production may dip during the six weeks, because the router runs more slowly while trainees learn; scheduling training sessions on the shop's lighter Monday and Friday afternoons limits the loss. The second risk is that the current operator, as the only expert, may feel the training threatens his position. The owner should present it as a promotion of his role to trainer and lead operator, and the proposed pay structure supports that by keeping him at the top of grade 3.
Why This Is Worth Doing
The training would pay for itself in about five idle days avoided. It also opens a path: under the shop's proposed pay structure, the router operator sits in a higher grade, so trained assemblers can move up without leaving the shop (Dessler, 2020).
References
Dessler, G. (2020). Human resource management (16th ed.). Pearson.
Goldstein, I. L., & Ford, J. K. (2002). Training in organizations: Needs assessment, development, and evaluation (4th ed.). Wadsworth.
Kirkpatrick, D. L., & Kirkpatrick, J. D. (2006). Evaluating training programs: The four levels (3rd ed.). Berrett-Koehler.
HRMG 3001 Week 7 instructions, in plain terms
In Week 7 you propose a training program to close one skill gap. Open with evidence that the gap exists and costs the organization something. Conduct a needs analysis at the organizational, task and person levels: why the gap matters now, what the job involves broken into teachable tasks and who could be trained. Then present the plan: trainers, trainees, schedule, materials and cost. Address the main risks. Finally, state how the organization will know the training worked, using at least one measure of skill and one of results. Cite training research to support the approach and the measures.
How the HRMG 3001 Week 7 example is put together
The proposal cites the log's idle days and late orders and estimates the daily wage cost. The needs analysis, citing Goldstein and Ford, links the gap to contractor schedules and a planned second shift, breaks router work into loading files, setting tools, loading sheets and test cuts, and identifies two assemblers with related experience, explaining why two are trained. The six-week plan moves from safety and file loading to supervised full runs, with costs. A risks section covers the production dip and the current operator's concerns. Measurement includes a solo test job and a year with no idle days, citing Kirkpatrick and Kirkpatrick. A closing section shows payback and a path upward, citing Dessler.
HRMG 3001 Week 7 rubric: what earns full marks
Training proposals are graded on evidence, analysis and measurability. The need must be shown with data, not assumed. The needs analysis should cover all three levels and break the task into parts that can be taught. The plan has to be concrete enough for a manager to sign: trainers, dates, materials and a price. Strong proposals anticipate risks and explain how the plan handles them. Measurement should include at least one test of skill and one business result, with a timeframe. Proposals that jump to a course or workshop without analyzing the gap, or that measure only whether trainees enjoyed the training, fall short.
HRMG 3001 Week 7 help from the desk
Start with a record of the problem: missed deadlines, errors, idle time or complaints, with dates and counts if you can find them. Then ask why it matters to the business now, what the job actually requires step by step and who already has some of those skills. Build the plan around the people and tools you have, and put a cost on everyone's time. Think about what could go wrong during training. Finally, decide what you would accept as proof it worked, both in the trainee's skill and in the original problem. Common weaknesses are no evidence of need and vague measures. Describe the skill gap and we can help draft the proposal. Put a dollar figure on the problem early; owners approve training faster when they can see what the gap already costs.
Get a HRMG 3001 Week 7 example written to your instructions
Describe the skill gap your scenario names and include the prompt and the rubric; the proposal evidences that gap first and then plans the training. Your first custom sample is free, back in 24 to 48 hours. The router, its lone operator and the idle days in the log are details of a shop that does not exist.
More HRMG 3001 papers and BS in Business Administration samples
- HRMG 3001 Week 1: HR Beliefs Discussion Post
- HRMG 3001 Week 2: HR Function Overview
- HRMG 3001 Week 3: Critical Incident Job Analysis
- HRMG 3001 Week 4: Employee Selection Brief
- HRMG 3001 Week 5: First-Week Onboarding Plan
- HRMG 3001 Week 6: Pay Structure Memo
- HRMG 3001 Week 8: Performance Appraisal Critique
- HRMG 3001 Week 9: Plain-Language Policy Summary
- HRMG 3001 Week 10: HR Practice Integration Paper
- HRMG 3001 Week 11: Course Reflection Paper
- FNCE 3001 Week 7: Working Capital Memo
HRMG 3001 Week 7 questions, answered
Where can I find a free HRMG 3001 Week 7 sample paper?
The full training proposal, from evidence to measurement, is reproduced below for anyone to read.
What problem does the HRMG 3001 Week 7 proposal address?
The shop has one CNC router operator, and the router sat idle eleven days last year when he was away.
What are the three levels of the needs analysis?
Organizational, why the gap matters now; task, what router operation involves; and person, who could be trained.
Why train two assemblers instead of one?
Training one would only move the single point of failure to another person.
How will the shop know the training worked?
Each trainee runs a standard job alone without errors, and the log shows no idle router days over the next year.