| Course | HLTH 6200 Risk Assessment, Preparedness, and Disaster Mitigation |
|---|---|
| Week | Week 9 |
| Paper type | Benefit-cost brief |
| Length | About 560 words, 5 pages |
| Format | APA 7 student paper |
| School | Walden University |
| Program | MS in Emergency Management |
| Updated | October 2026 |
Free sample paper for HLTH 6200 Week 9
Benefit-Cost Brief: Floodproofing the Wastewater Plant Versus Elevating Forty Homes, With Every Input Shown
Student Name
Walden University
HLTH 6200: Risk Assessment, Preparedness, and Disaster Mitigation
Instructor Name
Month Day, Year
Benefit-Cost Brief: Floodproofing the Wastewater Plant Versus Elevating Forty Homes, With Every Input Shown
Question and Method
This brief compares two measures from the mitigation menu: floodproofing the wastewater treatment plant and elevating 40 repetitive-loss homes. For each, it estimates the expected annual loss the measure would avoid, converts that stream of avoided losses to present value over a 50-year project life and divides by cost. Federal mitigation grants require projects to be cost-effective (44 C.F.R. § 206.434), and studies of federal mitigation spending have found average returns well above cost (Multihazard Mitigation Council, 2019; Rose et al., 2007). All figures are illustrative values for the composite county, and every input is shown so a reader can change it.
Inputs
Table 1 lists the avoided loss each measure would produce at four flood levels, defined by their annual chance of being exceeded.
Table 1
Avoided Loss by Flood Level for Each Measure (Illustrative Inputs)
| Flood level (annual chance) | Plant floodproofing: avoided loss | Elevating 40 homes: avoided loss |
|---|---|---|
| Flood stage, frequent (15%) | $0 | $600,000 ($15,000 per home) |
| Major flood (4%) | $1.5 million | $1.6 million ($40,000 per home) |
| 1% annual chance flood | $9.0 million | $3.2 million ($80,000 per home) |
| 0.2% annual chance flood | $16.0 million | $4.0 million ($100,000 per home) |
Plant figures include equipment repair and the cost of one to two weeks of lost wastewater service; home figures include building and contents damage only.
Expected Annual Avoided Loss
Expected annual avoided loss was approximated by averaging the avoided losses at each pair of adjacent flood levels and multiplying by the difference in their annual chances, then adding the 0.2% loss times 0.002 for rarer floods. For plant floodproofing: $5.25 million times 0.03, plus $12.5 million times 0.008, plus $16 million times 0.002, which comes to about $290,000 a year. For elevation: $1.1 million times 0.11, plus $2.4 million times 0.03, plus $3.6 million times 0.008, plus $4 million times 0.002, which comes to about $230,000 a year.
Present Value and Ratios
Over 50 years, each dollar of annual avoided loss is worth about $13.80 today at a 7% discount rate and about $25.73 at 3%. Federal guidance has long used 7% for such analyses, and lower rates have been adopted more recently, so both are shown. Table 2 gives the results.
Table 2
Benefit-Cost Results at Two Discount Rates (Illustrative)
| Measure | Cost | Annual avoided loss | Ratio at 7% | Ratio at 3% |
|---|---|---|---|---|
| Plant floodproofing | $3.2 million | About $290,000 | 1.25 | 2.33 |
| Elevating 40 homes ($160,000 each) | $6.4 million | About $230,000 | 0.50 | 0.92 |
Which Measure Buys More Protection
Plant floodproofing buys more protection for what it consumes. It passes at either discount rate, and its benefit reaches roughly 52,000 people connected to the sewer system. Elevation fails at both rates on property benefits alone. Two cautions apply. First, the elevation figures count only building and contents damage; they omit avoided displacement, temporary housing, health effects and life safety benefits, which could be substantial for households that flood repeatedly. Second, the result for elevation depends heavily on the frequent-flood input, since repetitive-loss homes take water often; if those homes flood more often than 15% a year, the ratio rises. A reader who thinks either omission matters can add a value and rerun the arithmetic. As shown, the brief recommends the plant measure for the next grant cycle and recommends reconsidering elevation alongside a buyout offer for the same homes.
References
Eligibility, 44 C.F.R. § 206.434 (2024).
Multihazard Mitigation Council. (2019). Natural hazard mitigation saves: 2019 report. National Institute of Building Sciences.
Rose, A., Porter, K., Dash, N., Bouabid, J., Huyck, C., Whitehead, J., Shaw, D., Eguchi, R., Taylor, C., McLane, T., Tobin, L. T., Ganderton, P. T., Godschalk, D., Kiremidjian, A. S., Tierney, K., & West, C. T. (2007). Benefit-cost analysis of FEMA hazard mitigation grants. Natural Hazards Review, 8(4), 97-111. https://doi.org/10.1061/(ASCE)1527-6988(2007)8:4(97)
The Walden HLTH 6200 Week 9 instructions
Benefit-cost briefs typically ask you to compare two mitigation measures in money terms using published methods. State the measures and the method. Show the inputs, such as avoided losses at several flood levels, in a table so a reader can change them. Calculate expected annual avoided loss step by step, then convert it to present value over a stated project life. Show results at more than one discount rate, since the choice changes the answer. Argue which measure buys more protection for the money, and name what the calculation leaves out, such as displacement or life safety benefits. Keep the brief short and the arithmetic visible.
Inside the HLTH 6200 Week 9 example
The question section names the two measures and the method, citing 44 C.F.R. 206.434 and average returns from the Multihazard Mitigation Council and Rose and colleagues. An inputs table gives avoided losses at four flood levels for each measure. The next section computes expected annual avoided loss of about $290,000 for the plant and $230,000 for elevation. A results table shows ratios of 1.25 and 2.33 for the plant and 0.50 and 0.92 for elevation at 7% and 3%. The closing section recommends the plant measure, notes that elevation's figures exclude displacement, health and life safety benefits and suggests reconsidering elevation alongside buyouts. The cautions name the two inputs most likely to change the elevation result.
Where the marks sit in the HLTH 6200 Week 9 rubric
The brief is graded on transparency as much as on its verdict. Graders look for inputs shown in a table, a step-by-step calculation of expected annual avoided loss and a clearly stated discount rate and project life. Showing results at more than one discount rate demonstrates awareness that the choice matters. The argument should follow from the numbers while naming what they omit, such as benefits to residents beyond property. A reader should be able to change an assumption and rerun the result. Accurate citations of the cost-effectiveness requirement and of published methods or evidence account for the remaining credit. Briefs that say how a different input would change the answer show they understand the method's sensitivity.
Common HLTH 6200 Week 9 mistakes, and how to avoid them
Benefit-cost briefs often report a ratio without showing inputs, or compare measures using costs alone. Others use a single discount rate without saying why. Some ignore benefits that are hard to price and treat the ratio as the whole answer. Build a small table of avoided losses at each flood level for each measure, then compute expected annual loss with a simple method you can explain. Run the present value at two rates. Then write one paragraph on what the numbers leave out. Our writers can prepare a benefit-cost brief for the measures your course compares, with every input and calculation shown. Mark invented figures as such so no reader mistakes them for real data.
Get a HLTH 6200 Week 9 example written to your instructions
Benefit-cost samples put every input on the page. Instructions, plus any cost data a section provided, are the raw material. The opening sample is free and takes 24-48h. Dollar amounts trace to published sources or to the data you send, and no figure is manufactured so a ratio lands somewhere convenient.
More HLTH 6200 papers and MS in Emergency Management samples
- HLTH 6200 Week 1: Single Hazard Profile
- HLTH 6200 Week 2: Hazard Selection Discussion Post
- HLTH 6200 Week 3: Flood Exposure Summary
- HLTH 6200 Week 4: Flood Likelihood Note
- HLTH 6200 Week 5: Flood Consequence Estimate
- HLTH 6200 Week 6: Hazard Risk Matrix
- HLTH 6200 Week 7: Risk Rating Peer Reply
- HLTH 6200 Week 8: Flood Mitigation Options Menu
- HLTH 6200 Week 10: Flood Mitigation Plan
- HLTH 6200 Week 11: Mitigation Priority Memo
- HLTH 6100 Week 9: Vulnerability Literature Synthesis
HLTH 6200 Week 9 questions, answered
Where can I find a free HLTH 6200 Week 9 sample paper?
The benefit-cost brief and both of its tables are posted here, free.
Which measures does the HLTH 6200 Week 9 brief compare?
Floodproofing a wastewater treatment plant for $3.2 million and elevating 40 repetitive-loss homes for $6.4 million.
What are the benefit-cost ratios?
About 1.25 at 7% and 2.33 at 3% for the plant, and about 0.50 at 7% and 0.92 at 3% for elevation.
Why show two discount rates?
Because the rate changes the present value of future avoided losses, and federal practice has used different rates over time.
What do the elevation figures leave out?
Avoided displacement, temporary housing, health effects and life safety benefits, which could be substantial for repeatedly flooded households.