Free sample paper for DDHA 8601 Week 8
Who Trains Whom, Who Stands on the Floor and Who Does the Work Twice: A Phased Implementation Plan for a Device Monitoring Platform Across Three Hospital Departments
Student Name
Walden University
DDHA 8601: Technology and Innovation in Healthcare
Instructor Name
Month Day, Year
Who Trains Whom, Who Stands on the Floor and Who Does the Work Twice: A Phased Implementation Plan for a Device Monitoring Platform Across Three Hospital Departments
Scope and Phasing
This plan covers the rollout of the vendor-neutral device monitoring platform at Linden Ford Community Hospital, a composite community hospital, following the clinic pilot and the decision to proceed. The platform will be used in three departments, in this order: the cardiac device clinic, which reviews remote transmissions daily; the inpatient cardiac telemetry unit, where nurses and hospitalists will view a patient's latest device summary at admission; and the emergency department, where physicians and nurses will look up device data for patients arriving after a shock or a fainting episode. The device clinic goes first because its staff will become the experts the other two departments call. The schedule appears at the end; most of the plan concerns people.
Training by Role
Device nurses, three people, receive twelve hours of training from the vendor's clinical trainer over two weeks before their go-live, including two half-days reviewing their own patients' transmissions in a test environment. One of them, chosen by the nurse manager, receives four more hours to serve as the clinic's super-user.
Electrophysiologists, two people, receive a three-hour session from the vendor's clinical specialist focused on escalated transmissions and the summary format, scheduled around their procedure days.
Telemetry unit nurses, about 40 people, complete a 30-minute online module and attend a 15-minute demonstration at a shift huddle led by the unit educator. Night-shift nurses receive the huddle demonstration from the night educator at 19:30 and 03:00, so that no night nurse has to come in on a day off. Two telemetry nurses per shift are trained as super-users with an extra hour each.
Emergency department physicians and advanced practice providers receive a 20-minute demonstration at their monthly staff meeting and a one-page guide. Emergency nurses receive a 20-minute session from the department educator, with separate night sessions. The focus for both is narrow: how to find a patient's last device summary and whom to call.
Rogers (2003) observed that people adopt innovations partly by watching peers use them, which is why each department has super-users drawn from its own staff rather than relying only on the vendor's trainers.
Support After Go-Live
Support is specified as coverage. In the device clinic, the vendor's clinical specialist will be on site from 7:30 to 16:00 for the first two weeks, and the super-user will have half her schedule protected for four weeks. On the telemetry unit, a trained super-user will be on every shift for two weeks, identifiable by a badge, with no patient assignment for the first three days. In the emergency department, an at-the-elbow support person from the information technology department will be present from 10:00 to 22:00 for the first week.
When on-site presence ends, support moves to three channels: a dedicated category in the help desk system, a device clinic phone line answered during clinic hours and the super-users on each unit. The plan states this transition date in advance so that staff know when the extra help ends.
Work Done Twice During Transition
Several tasks will be done twice for a period, and the plan names who absorbs that work. For the first four weeks, device nurses will document each transmission review both in the platform and by the old method, until the interface into the record has been checked against a sample of 100 reviews. For the first three months, the platform's filtering feature will run in parallel with full nurse review, as required by the technology evaluation. Together these add about eight hours a week per device nurse at first, falling as the documentation check ends. The hospital will fund a float nurse at half time for six weeks to absorb this, and the nurse manager will defer the clinic's annual competency reviews by one month.
In the telemetry unit and emergency department, staff will keep calling the device clinic for device information as they do now until the platform view has been live for two weeks, so that a failed login never leaves a patient without information.
What the Plan Expects to Go Wrong in the First Month
The plan names five likely problems. Interface mapping errors will place some summaries in the wrong section of the record, and the integration analyst will review a daily sample for the first month. Device nurses will continue opening manufacturers' websites for alert transmissions, which the adoption analysis predicted, and the plan treats this as acceptable rather than as noncompliance. Emergency staff will forget how to find the device view on night shifts, so the one-page guide will be posted at every workstation. Some telemetry nurses will miss training because of leave, and the unit educator will track completion by name. And the vendor's specialist will leave on schedule while problems remain; the contract therefore includes two follow-up site visits at weeks six and ten. Koppel et al. (2008) found that workarounds often appear when technology does not fit the work, so each of these will be logged and reviewed weekly rather than corrected by reminder alone. Greenhalgh et al. (2017) caution that complex technologies are often abandoned after go-live when such problems accumulate unaddressed.
Schedule
Each department's go-live begins only after the previous department has reached stabilization, so that device clinic staff are available to support the next phase. If a department's stabilization runs long, the next phase moves back rather than overlapping, because the same small group of super-users and analysts supports every phase.
Table 1
Phases by Department
| Department | Preparation | Go-live and on-site support | Stabilization | Hand-off to routine support | |
|---|---|---|---|---|
| Device clinic | Weeks 1 to 4 | Weeks 5 to 6 | Weeks 7 to 10 | Week 11 | |
| Telemetry unit | Weeks 7 to 10 | Weeks 11 to 12 | Weeks 13 to 16 | Week 17 | |
| Emergency department | Weeks 11 to 14 | Week 15 | Weeks 16 to 18 | Week 19 | |
Weeks are counted from project approval; none of these is a real project's due date.
References
Greenhalgh, T., Wherton, J., Papoutsi, C., Lynch, J., Hughes, G., A'Court, C., Hinder, S., Fahy, N., Procter, R., & Shaw, S. (2017). Beyond adoption: A new framework for theorizing and evaluating nonadoption, abandonment, and challenges to the scale-up, spread, and sustainability of health and care technologies. Journal of Medical Internet Research, 19(11), Article e367. https://doi.org/10.2196/jmir.8775
Koppel, R., Wetterneck, T., Telles, J. L., & Karsh, B.-T. (2008). Workarounds to barcode medication administration systems: Their occurrences, causes, and threats to patient safety. Journal of the American Medical Informatics Association, 15(4), 408-423. https://doi.org/10.1197/jamia.M2616
Rogers, E. M. (2003). Diffusion of innovations (5th ed.). Free Press.
Reading the DDHA 8601 Week 8 instructions
Implementation plans in this course usually ask how you would roll out a technology across several departments. Organize by department and phase, but put the weight on people. Describe training by role, naming the format, length and who delivers it, with arrangements for night staff. Specify support after go-live as coverage: who is on the floor, when and for how many weeks, and what happens afterward. List tasks that will be done twice during transition and say who absorbs that work. Name what you expect to go wrong in the first month. Include a compact schedule table that does not pretend to real project dates. Count the staff in each role so training hours can be totaled and funded.
How the DDHA 8601 Week 8 example is put together
The plan opens with the three departments and explains the order. The training section covers device nurses, electrophysiologists, telemetry nurses with night sessions, and emergency clinicians, and uses Rogers to justify super-users from each department. The support section gives on-site hours by department and the channels that replace them. The double-work section describes parallel documentation, parallel filtering review and continued phone calls, with a funded float nurse and deferred competency reviews. The problems section lists five expected failures with responses and cites workaround and abandonment research. Table 1 shows phases by department in weeks from approval. A closing note explains why each department waits for the previous one to stabilize.
Where the marks sit in the DDHA 8601 Week 8 rubric
Implementation plans are evaluated on realism about people. Markers reward training described by role with named trainers and formats, especially when night staff are considered. Support specified as coverage, with an end date, earns more than general promises of help. Identifying double work and assigning it to someone shows operational awareness that many plans lack. Anticipating specific early problems demonstrates experience and judgment. The schedule should be clear and compact. Use of implementation and adoption literature supports the plan's choices, and organized headings help graders follow it. Graders also check that the support described is affordable within the plan's stated resources and that super-users come from each department's own staff.
Common DDHA 8601 Week 8 mistakes, and how to avoid them
Many plans are mostly a Gantt chart. Put the dates in one table and spend your words on training and support. Remember night and weekend staff. Say when extra support ends and what replaces it. Look for tasks that will be done twice and fund them, or someone will cut corners. Predict what will go wrong and plan responses rather than hoping. If your rollout spans several departments, our writers can produce a plan matched to your organization's roles. Talk to the people who will support go-live before you write their hours down. A plan that promises coverage nobody agreed to provide will fail in the first week.
Get a DDHA 8601 Week 8 example written to your instructions
The desk builds this plan again from the Week 8 prompt and the rubric your section posted, with the departments and phases the assignment names. The first custom sample is free and returns inside 24-48 hours. It will describe an invented hospital, because a real rollout calendar belongs to the organization running it.
More DDHA 8601 papers and DHA samples
- DDHA 8601 Week 1: Workaround Discussion Post
- DDHA 8601 Week 2: Workflow Assessment
- DDHA 8601 Week 3: Technology Evaluation
- DDHA 8601 Week 4: Adoption Analysis
- DDHA 8601 Week 5: Cost of Ownership Analysis
- DDHA 8601 Week 6: Interoperability Discussion Post
- DDHA 8601 Week 7: Interoperability Brief
- DDHA 8601 Week 9: Downtime Plan
- DDHA 8601 Week 10: Benefits Measurement
- DDHA 8601 Week 11: Business Case
- DDHA 8503 Week 8: Intervention Design
- DDHA 8303 Week 8: Instrument Appraisal
- DDHA 8203 Week 8: Template Change Analysis
- DDHA 8113 Week 8: Coaching Memo
DDHA 8601 Week 8 questions, answered
Where can I find a free DDHA 8601 Week 8 sample paper?
The three-department implementation plan, including its phase table, is free to read on this page.
Which departments does the DDHA 8601 Week 8 example cover?
The cardiac device clinic, the cardiac telemetry unit and the emergency department, in that order.
How are night staff trained?
Through huddle demonstrations by night educators at 19:30 and 03:00 and separate emergency department night sessions.
What work is done twice during the transition?
Device nurses document in two places for four weeks, and filtering runs in parallel with full review for three months.
What does the plan expect to go wrong first?
Interface mapping errors, nurses bypassing the worklist for alerts, forgotten logins at night, missed training and early vendor departure.