Free sample paper for DDBA 8522 Week 3
Balance by 2042, but Who Pays Until Then? A Burden Analysis of an Overdrafted Groundwater Basin Cutting Agricultural Pumping on a Twenty-Year Schedule, Following the Groups That Bear the Cost While the Water Table Is Still Falling
Student Name
Walden University
DDBA 8522: Seminar in Sustainability
Instructor Name
Month Day, Year
Balance by 2042, but Who Pays Until Then? A Burden Analysis of an Overdrafted Groundwater Basin Cutting Agricultural Pumping on a Twenty-Year Schedule, Following the Groups That Bear the Cost While the Water Table Is Still Falling
The Plan and Its Promise
A composite groundwater basin in California's San Joaquin Valley has been pumped faster than it recharges for decades. Under the state's groundwater sustainability law, the local agency adopted a plan in 2022 to bring pumping into balance with recharge by 2042, a twenty-year schedule. The plan cuts allowable agricultural pumping in stages: 10 percent by 2027, 25 percent by 2032 and about 40 percent by 2042, mainly by fallowing farmland. It promises a stable water table by the end of the schedule. Famiglietti (2014) described groundwater depletion as a global crisis largely invisible until wells fail, and this plan is a serious response. But plans of this kind focus on the end state. This analysis asks who pays during the twenty years when cuts are phased in and the water table is still falling.
Why the Water Table Keeps Falling
Because cuts are phased, pumping continues to exceed recharge for most of the period. The plan's own projections show the water table dropping about another 30 feet by 2032 before it begins to level off. Shallow wells will go dry during those years even though the plan is succeeding on its own terms.
Who Pays
Four groups bear most of the cost during the transition.
Households on shallow domestic wells, mostly in small unincorporated communities, lose water first. About 1,400 domestic wells in the basin are shallower than the water table is projected to reach by 2032. Deepening a well or connecting to a public system costs $20,000 to $60,000, and many of these households earn well below the county median.
Farmworkers lose work as land is fallowed. Fallowing 25 percent of irrigated acreage by 2032 would remove an estimated 2,000 to 3,000 seasonal jobs, depending on which crops are idled.
Small farms with junior or limited pumping allocations face proportionally larger cuts and have less capital to adjust by switching crops or buying water.
Local governments and schools lose property tax and spending as fallowed land and lost jobs ripple through small towns.
Large farms bear costs too, but they have more ways to absorb them: buying allocations from others, shifting to higher-value crops or drilling deeper.
Why the Timing Matters
Bansal and DesJardine (2014) argued that sustainability is fundamentally about time, about the tradeoffs between present and future. Slawinski and Bansal (2015) showed how organizations handle tensions between short-term and long-term goals, and how some favor short-term predictability over long-term outcomes. The basin plan makes a long-term promise, but its costs fall in the short and medium term, and they fall on groups with the least capacity to bear them and the least voice in the agency that wrote the plan. A plan can be sustainable by its end date and unjust along the way.
What Would Spread the Burden
Three measures would shift some cost away from those least able to bear it. A domestic well mitigation fund, financed by a per-acre-foot fee on pumping, could pay to deepen or replace wells that go dry. Fallowing could prioritize land whose owners are paid to idle it, with payments partly shared with farmworkers through a transition fund. And the agency could set aside allocations for small farms during the early stages.
Who Decided, and Who Was in the Room
The groundwater agency's board has five members: three appointed by the largest irrigation districts, one by the county and one by the cities. No board seat represents domestic well owners or farmworkers, and public comment on the plan came mainly from growers and water districts. The plan's analysis of impacts on domestic wells appears in an appendix and was revised only after a legal aid organization submitted comments. The distribution of costs over time is partly a result of who designed the schedule.
What the Agency Could Measure
The agency already monitors groundwater levels at about 140 wells. It could add a simple annual report on the number of domestic wells that went dry, the acres fallowed by farm size and the number of seasonal farm jobs in the basin. Those figures would make the transition's costs visible each year rather than only at the end, and would let the board adjust the schedule or the mitigation fund if costs fall harder than projected.
Limits
The analysis uses the plan's projections, which may prove optimistic or pessimistic. The job and well estimates are approximate and should be refined with county data.
References
Bansal, P., & DesJardine, M. R. (2014). Business sustainability: It is about time. Strategic Organization, 12(1), 70-78. https://doi.org/10.1177/1476127013520265
Famiglietti, J. S. (2014). The global groundwater crisis. Nature Climate Change, 4(11), 945-948. https://doi.org/10.1038/nclimate2425
Slawinski, N., & Bansal, P. (2015). Short on time: Intertemporal tensions in business sustainability. Organization Science, 26(2), 531-549. https://doi.org/10.1287/orsc.2014.0960
Reading the DDBA 8522 Week 3 instructions
In Week 3 you analyze who bears the costs of a sustainability plan during its transition, not only at its end. Describe the plan, its schedule and its promised end state. Explain why harm continues during the transition, using the plan's own projections. Identify the groups that bear costs, estimating what each loses and when. Compare their capacity to absorb those costs with that of others affected. Explain why timing matters, drawing on research about time in sustainability. Examine who designed the plan and whose interests were represented. Propose measures that spread the burden more fairly and ways to track it. Note the limits of your estimates. Cite sources on the resource issue and on intertemporal tradeoffs. Most run four or five pages.
How the DDBA 8522 Week 3 example is put together
The analysis opens with the basin's overdraft and the agency's twenty-year schedule, citing Famiglietti. A section shows the water table falling until about 2032 because cuts are phased. Four groups are examined: households with roughly 1,400 shallow domestic wells facing $20,000 to $60,000 to deepen or connect, farmworkers losing 2,000 to 3,000 seasonal jobs from fallowing, small farms with proportionally larger cuts and towns losing tax revenue. Large farms are shown to have more options. A section applies Bansal and DesJardine and Slawinski and Bansal to argue a plan can be sustainable by its end date and unjust along the way. Board composition, annual cost reporting and a well mitigation fund, shared fallowing payments and small-farm allocations follow.
DDBA 8522 Week 3 rubric: what earns full marks
Instructors give most credit to the focus on the transition. A paper that evaluates only whether the plan reaches its goal misses the week's question. Credit goes to identifying specific groups, estimating their costs and timing them, and to comparing their capacity to bear costs with others'. Explaining why the harm continues during the transition, using the plan's own data, strengthens the argument. Examining who designed the plan and who was absent adds an explanation for the distribution of costs. Proposals earn marks when they are concrete and financed. Suggesting annual reporting on transition costs shows practical judgment. Sources should support both the resource context and the time argument.
DDBA 8522 Week 3 help: mistakes that cost marks
Sustainability plans are usually judged by their targets. Instead, read the plan's projections year by year and ask what happens to people before the target is reached. List every group affected and estimate their costs in money, jobs or access. Ask which groups can adjust and which cannot. Check who sat on the body that wrote the plan. Propose ways to share costs that the plan's beneficiaries could fund. Track costs annually, not only at the end. Admit where your estimates are rough. A tutor can help you find local data on wells, jobs or budgets. Put each group's costs on a timeline.
Get a DDBA 8522 Week 3 example written to your instructions
Attach the Week 3 prompt, your rubric and the case or policy the section is examining; the burden analysis, timeline figure included, is back within 24 to 48 hours, with no charge for a first request. For a different commitment, such as a fishery closure or a plant conversion, the same bearer-by-year design applies.
More DDBA 8522 papers and DBA samples
- DDBA 8522 Week 1: Sustainability Claim Discussion
- DDBA 8522 Week 2: Sustainability Definition Paper
- DDBA 8522 Week 4: Horizon brief
- DDBA 8522 Week 5: Supply chain trace
- DDBA 8522 Week 6: Peer critique
- DDBA 8522 Week 7: Indicator critique
- DDBA 8522 Week 8: Policy analysis
- DDBA 8522 Week 9: Reversal case
- DDBA 8522 Week 10: Internal proposal
- DDBA 8522 Week 11: Position paper
- DDBA 8521 Week 3: Process Workaround Audit
- DDBA 8511 Week 3: Strategy Position Paper
- DDBA 8307B Week 3: Chart Brief
- DDBA 8303 Week 3: Case Source Inventory
DDBA 8522 Week 3 questions, answered
Where can I find a free DDBA 8522 Week 3 sample paper?
The transition burden analysis appears further down this page in full, at no cost to readers.
What plan does the DDBA 8522 Week 3 analysis examine?
A groundwater basin's twenty-year schedule for cutting agricultural pumping to bring it into balance by 2042.
Why does the water table keep falling under the plan?
Pumping cuts are phased, so pumping still exceeds recharge for most of the period, dropping levels about another 30 feet.
Who pays during the transition?
Households on shallow domestic wells, farmworkers losing seasonal jobs, small farms and the budgets of small towns.
How could the burden be spread more fairly?
Through a well mitigation fund, fallowing payments shared with farmworkers and set-aside allocations for small farms.